Sprint 106 Review / Sprint 107 Planning May 06, 2013
Sprint Resource Pages For this sprint, visit: nt+106+Progress+Summary nt+106+Progress+Summary For next sprint, visit: nt+107+Progress+Summary nt+107+Progress+Summary For information on the CONNECT 4.1 release visit: 2
Sprint 106 Summary - Cumulative Flow 3 To Do In Progress QA Done
Sprint 106 Summary - Burndown Chart 4
Sprint 106 Summary – Sprint Stats Points committed = 13.5 –Initial points committed – 11 –4 tickets added for 2.5 points of effort, totaling 13.5 points for sprint Tickets committed to sprint = 16 Tickets completed = 15 Points remaining (unclosed) at end of sprint = 0.5 Points completed in sprint (velocity) =
Sprint 106 – Themes & Tasks 4.2 Release –CMS-OFM 4.0 install on WAS 7 JDK 1.6 testing –Design for Document Query specification version identification CONN-46 & CONN-15 Participation in the Healtheway Certification pilot Partner and Community Support 6
Sprint What We are Showing Today CONNECT 4.2 Support adopters/federal partners that want to use CONNECT with Java 6 (Feature request – CONN-350) –CONN-383 – Test CONNECT on Solaris with WL 11g with Java JDK 1.6 –CONN-384 – Test CONNECT on RedHat Linux with WL 11g with Java JDK 1.6 –CONN-371 – Validate that CONNECT can be successfully installed in Java 1.7/WL 12c implementation environment –CONN-370 – Validate that CONNECT can be successfully installed in IBM Java 1.7/WAS 8.5 implementation environment 7
Sprint What We are Showing Today CONNECT Continued Support adopters/federal partners that want to use CONNECT with Java 6 (Feature request – CONN-350) –CONN-368 – Validate that CONNECT can be successfully installed in Java 1.7/JBoss implementation environment –CONN-369 – Validate that CONNECT can be successfully installed on Java 1.7/GlassFish implementation environment –CONN-375 – Document design or implementation notes on wiki for supporting Java 1.6 environment Demo TWIKI/Supporting+Java+version+6https://developer.connectopensource.org/display/CONNEC TWIKI/Supporting+Java+version+6 8
Sprint What We are Showing Today CONNECT 4.2 Provide adopters that support both versions of the specifications (QD and RD) the service version of the message so that adapters can validate/further process the request and generate the version specific response (Feature request – CONN 46 & 15) –Held responding design approach review on April 29 th –Link to responding design approach- –CONN-296 – Research design options to instruct the initiating gateway which specification version/endpoint to target for a QD or RD service –Link to initiating design approach- 9
Sprint What We are Showing Today Participation in the HealtheWay pilot –CONN-317 – Pre-test setup for pilot testing –CONN-400 – Pilot Test: Add country code to PD response –CONN-401 – Pilot Test: CONNECT throws exception if empty RelatesTo element is present in QD request –CONN-402 – Empty relatesToList value on the Entity interfaces results in an empty but existent wsa:RelatesTo header Demo le+1+-+Test+Cases+%28subset%29 10
Sprint What We are Showing Today Custodial Agent and Community Support Community and Federal Partner Support –CONN-382 & 404 – Validate that CONNECT populates the SMTP headers(SMTP TO and RCPT FROM) from the XDR metadata during SOAP to SMTP –CONN-389 – Direct failing in JBoss Caused by: java.lang.SecurityException Custodial Agent Duties 11
Sprint Proposed Themes Continued Testing for Java 6 & Java 7 Support –Testing on WebSphere 7 Multi-Specification Identification for QD/RD (Initiating) –Review initiating design approach with technical leads from Federal Partners (conference call) –Begin development Run Healtheway certification pilot test cases for a vendor gateway –Continue working on the updated list of Pilot test cases KI/Table+1+-+Test+Cases+%28subset%29 –Pilot extended to May 31 12
Sprint 107 – Other tasks Prepare for the May 21 st CONNECT User Group Meeting Other tasks –Partner and Community Support –Ongoing Custodial Agent Duties Product Backlog selectedProjectId=
CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings Next sprint meeting will be May 20 th –CONNECT 4.0 Blogs and Forum posts – –CONNECT User Group meeting May 21 st – Call for participation and abstracts underway 14
Questions and Discussion 15