Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.

Slides:



Advertisements
Similar presentations
Service Training PV Series 42 PVplus
Advertisements

Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Harvard PCM (Plate Cleaning Machine) Robert J. Simcoe (Bob) Ed Los Jonathan Grindlay.
Specification section 3.3
Steering Columns.
清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele:
OPERA AUDIO NEW ANALOG PRODUCTS ■ A multi-pivot static balance system ■ 230mm (9″) effective length ■ 16mm overhang & 23.5°offset ■ Stainless.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Senior Design: Validation of Design December 15, 2008.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Tracking Integration Challenges Y. meeting 2013/9/25.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Tracking Calorimetery Particle Identification WBS DETECTORS.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
LARP Collaboration Meeting Racetrack Coil Fabrication
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
EC: 7 DISK concept Preliminary considerations
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Mechanical Design Review February 25, 2008 Université de Montréal
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
SiD Solenoid Status and Plans
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
IHEP group Shashlyk activity towards TDR
Integration issues at IHEP
The Compact Muon Solenoid Detector
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Traditional Fixtures & Fittings
Rail fixtures & fastening
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla

CONTENTS Designs are proposed for the extraction of CDC/FDC from the Barrel Calorimeter KEY ITEMS : 1. Non-magnetic rails 2.Compact 3.With stand the design load 4.Precision 5.Reproducibility 1.DESIGN 1 2.DESIGN 2

36/48 Modules of B.C Design 1. 1.This Design incorporates two Carbon- fiber cylinders of 0.5 cm thk 2.The CDC is enclosed in a Carbon_fiber cylinder running all along the length of 2m 3.The second cylinder is 4m long supporting the rails for CDC & FDC 4.Two rails are positioned at 4 O’clock and 7 O’clock positions

0.65 ~ 0.85 DETAILS OF THE RAILS AND SPACING

Alignment Pads

CDC End Plate 120 cm Dia Carbon-Fiber Cylinder 9 cm CDC-CARBON-FIBER CYCLINDER ATTACHMENT OPTIONS CDC End Plate Carbon-Fiber Cylinder 9 cm

1. Casing & Track rail: Non-magnetic stainless 2. Steel Balls: Silicon nitride ceramics 3. Under seal: Nitrile rubber without metal part 4. End plate: 316 stainless steel 5. Ball retaining band: 304 stainless steel 6. End seal: 316 SS. 7. Screw: XM7 stainless steel 8. Grease fitting: Brass 9. Grease: Shell Alvania EP2 2 LWH20 series rails from IKO LOAD RATING Static : 4.52 KN Dynamic: 4.10 KN

Steps Involved In Aligning Rails Alignment fixture 1.The 4m cylinder is fitted to the inner face of the barrel calorimeter 2.The fixture in aligned to the center wrt a reference edge 3.Rails are aligned with fixture in place 4.Both the rails are fixed to precision for a desired angle of 120 deg

1.The Rails Are Aligned To The Machined Edge Of The Fixture 2.The Rails are bolted tightly to the carbon-fiber cylinder 3.The fixture is removed once the rails are aligned Carbon Fiber Cylinder

Reference Edge

1.5, Bearings are attached to the outer cylinder of the CDC 2.An extra rail is used for alignment purpose of the sliding bearings 3.The bolts on the bearings are not tightened completely, this gives us some We use the same fixture to align the bearing on the CDC

The CDC slides into the B.C

CDCFiber Glass Cylinders with the railsBarrel Calorimeter Rails Attached to the Fiber glass

The CDC enclosed in the Fiber Glass Cylinder is inserted into the Barrel Calorimeter supported by the rails CDC Barrel Calorimeter Deisgn.2

10 layers of ribbon cables, each layer has 61 cables, Total 610 cables have been modeled, required 540 cables 360 Coax-Ribbon Forward Drift Cathodes(3mm thk) 180 Twisted pair Ribbon Forward Drift Anodes (2mm thk) 120 cm (Dia) 130 cm (Dia) 72, ¼ inch ( 24 CDC HV cables 24 FDC HV cables 24 FDC Gas Connections)

CDC Cable Connectors Barrel Calorimeter CDC

Design.1 VS Design2 1.Can accommodate the design load of 1000 kg’s 1.Cylinders should be machined precisely 1.Space available is limited 1.Can accommodate the design load of 1000 kg’s 1.Alignment pads can be included for precision alignment 1.Space available for spacing

CONCLUSION Two designs are proposed for review Bearings/Rails are selected to accommodate the weight of CDC/FDC ~ 1000 kg Space for the cables is verified, taking into consideration the worst case scenario Looking into the possibility of building a prototype for testing the fixture for alignment of rails The Carbon-Fiber cylinder can also accommodate O’rings for avoiding gas leaks from the CDC chamber