AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.

Slides:



Advertisements
Similar presentations
Small cryotrap – control rack Nov Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.
Advertisements

ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
UHV gate valve Readiness Review 20Sept2012. Notes/remarks/proposals 1) with standard configuration, seems hard to keep cold the actuator? ( VAT) 2) position.
Preferred Utilities Manufacturing Corp.
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Pipes Single Wall Pipes Double Wall Pipes
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
AW Rayment & TW Clyne Department of Materials Science & Metallurgy University of Cambridge, UK Design and Commissioning of a Chamber for Controlled Atmosphere.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Vacuum technologies of existing and future GW interferometers Aspera Technology Forum Darmstadt, March 2012 C.Bradaschia, G.Parguez, A.Pasqualetti.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Hydronic Mechanical Controls
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Test Mass Discharging System (TMDS) Design Review 20 Nov 2014 Rich Abbott, Dennis Coyne, Eddie Sanchez, Calum Torrie 1 LIGO-G v1.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
Vacuum system.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
AdV cryotrap: cryostat surface is partially exposed to the near mirror (input ~ end). Its seismic shaking is amplified by LN2 boiling. The rest of vacuum.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
Interactive Control in Engineering Projects Electronics and Control.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
CUE – Make Any Pump an E-Pump
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Installation of the T600 at Fermilab CSN2, September 22,
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Installation of the T600 at Fermilab Fermilab, February 15,
ELENA installation progress F. Butin / ELENA collaboration.
Installation of the T600 at Fermilab
Proximity Cryogenics P&IDs meeting
XFEL Vacuum System Commissioning
Advanced Virgo – Nikhef tasks
Periodical meeting about the 'control system ‘
Status Vacuum Control-Command for AdV
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Vacuum Control System for Monolith Vacuum
SNS PPU Cryomodule Instrumentation
Presentation transcript:

AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional turbo/scroll and IVC Ion, tbc) 4 smaller chambers (pickoffs) with glass separations and in static vacuum (only rough pump, a few valvs and gauges) 2 Ion traps MSRC 4 smaller chambers (pickoffs) with glass separations and in static vacuum (only rough pump, a few valves and gauges) 1 cold pump For both options: _ No more TSP pump directly on towers, moved on cryotraps systems _ ions on links to be used during data taking (new station or inside tower racks) _ two large new turbos on links to be used during commissioning (new station or inside tower racks) _ 4 cryotraps (4 additional control stations) _ 2 simplified tube stations at 300N and 300W (two additional small stations) _ centralized scrolls (one additional small station) _ some additional gauge on towers (normally 1 pirani) and tubes (ITR100 replaced) _ seismic/acoustic/EM emissions to be reduced= racks position / supporting to be studied, fans mitigation, power supplies displacement...

Station Turbo, on 2 links, normally PR-INJ and SR-DET (preliminary) Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Automatic valve with position indicator 2 gauges, to be purchased, normally same to the ones we have, but not necessarily Automatic valve with position indicator To the remote scrolls Tower links PI PE

Ions, (preliminary) Could be grouped near IB, DT, MC, Inputs and/or distributed on the links. 2 Ion pumps, 1 controller, for instance Varian starcell DUAL controller: RS232 RS422 RS485 EThERNET Manual valve with position indicator 2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator Tower links PI PE

Centralized scrolls, preliminary Scrolls, could have rs232 Automatic valves with position indicator TowerIBTowerPR TowerBS TowerWITowerSRTowerNI TowerDT ? PI

Scrolls rooms, with recondensers, tbc

Cryotrap/Brewster evolution Depending on design, it will be needed: A) Cold Trap, 20K for instance B) Ion traps DET and SM (INJ). A brewster window during the first itf commissioning period C)?

Cryotraps 1of2, preliminary 2 systems like this one per each trap Manual valve CF with position indicator 2 gauges to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator Large valve / tower link Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Automatic valve with position indicator 2 gauges Automatic valve with position indicator Local scroll and also remote scroll? Automatic valve with position indicator existing large valve, to be linked to the control PE RGA PI PE 2 TSP fil. sets Manual valve with position indicator New or from 0m/3000m? Not from NI/NE... vent Manual valve with position indicator

Cryotraps 2of2, preliminary. Cryogenic controls, pid for level control and external tank Electronics driver to be read (tbc) by remote, normally with a few low level output or rs232 or other Automatic proportional valve, with position indication (profibus...) Automatic valve to be linked to the temp control existing large valve, to be linked to the temp control Level 1 External Tank LN2 Electronics driver to be read by remote, normally with a few low level output or rs232 or other Level 2 PID PID level regulator to be read by remote, normally with a few low level output or rs232 or other. Could retransmit the level and valve status Temperature Some temp readouts to be acquired. The controller will have relays to close also valves in case of high temp alarms Pressure 1 Pressure 2 Pressure signals (2), normally 4-20mA, to be recorded Comments: add readouts of LN2 tanks pressures

Double oring on bottom flanges. From the point of view of control system, it is one additional gauge per tower (pirani) PI CF16, to be metal sealed in case of helicofles Double orings on end tower viewports too

300m N and W, preliminary 2 TSP pumps, 2 controllers. Manual valve with position indicator, existing 2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator 3km tube, 300m from input PE PI

TSP rearrangement TSP WE -> WE trap (1 TSP on end trap) TSP NE as above TSP NI, SR -> NI trap (2 TSPs on input traps) TSP WI, PR as above TSP BS = spare? TSP 300m N/W, new ones with enlarged surface/capacity and suitable size to be installed below the tube, or NEG, as a test

Turbo-booster at the existing tube stations 0m, 600m,...??? (preliminary) Smaller turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Existing turbo pumping group V21, V22, P21, P22, G21, G22 To the scroll 3km tube station 0, 600,... PI

Other changes (preliminary): Link valves remote operation more reliable Change ITR100BAG gauges with Varian UHV24 at tube stations Monitor compressed air level at tube stations (not just an alarm) Turbo installed also at 0m N and 0m W?

NEW VACUUM RACKS POSITION? Intermediate boxes, VALVES boxes, Cryotrap racks ON THE FLOOR Cables lenght: 30m seems enough Other: leave room to put towers rings Portable console to work close to towers?