Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting 8.6.2006 CERN / Risto Orava for Kari Kurvinen.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

CMS GEM Workshop III, April 20, 2012
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING APRIL 2011.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Walls crates cables gas chambers electronics CERN adb.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
GEM progress from Chinese collaboration Yuxiang Zhao University of Science and Technology of China Aug 20,
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
GEM Foil Development at ECIL
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Update on GEM-based Calorimetry for the Linear Collider A.White 1/11/03 (for J.Yu, J.Li, M.Sosebee, S.Habib, V.Kaushik)
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Helsinki T2 status Risto Orava/ on behalf of Kari Kurvinen
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Gluing jigs for Demonstrator
Presentation transcript:

Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen

GEM FOILS Visual & optical scanning 48 foils scanned selection criteria not decided → all foils accepted so far Leakage current measurements >30 foils measured 2 discarded due to high currents Framing 28 foils glued to the frames 2 foils with frames lost due to a failure of glueing (part of the foil detaches from the frame during the curing phase) GEM frames for 6 GEMs (18 pcs) ordered from CNCenter Ltd in Helsinki (more will be ordered if the quality is confirmed).

Readout boards 10 delivered to Helsinki including 3 bad ones (problems in glueing & cutting (CERN-EST-DEM)) readout connectors only for 3 GEMs, –more ordered >2 months ago, not yet delivered –needed for capacitance measurements –must be soldered before the glueing of the GEM pile onto the r.o.b. semi-automatic capacitance measurements done for the three finished r.o.b. and manually partly for the four ones (3 sectors only per r.o.b.). → acceptable quality

DRIFT FOILS 7 drift foils glued to the sandwich 6 drift foils of the latest delivery batch turned out to be mirror images → new foils ordered from a Finnish company, delivery within two weeks.

Small items GEM support 12 manufactured from brass for the beam test HV connectors (LEMO) 25 male and female ones ordered and delivered Gas connectors received from CERN-EST-DEM with plastic adapters some cracks observed in the adapters → gas leakages several aluminium ones manufactured in Helsinki

Summary of the status of GEM assembly Finished HG1, HG2, HG3 4 GEM piles finished: HG4, HG5, HG6, HG7 and waiting for r.o.b.s rest of the foils have been scanned and the leakage current measurements done rest of the r.o.b.s checked manually (only a few sectors), will be re-checked after assembling the connectors COMPONENTS LEFT readout board connectors 0 pcs drift foils: for 0 GEMs ( 6 ordered from Helsinki) drift frames: for 4 GEMs GEM foils: for 3 GEMs GEM frames: for 1 GEM ( 6 more from CNCenter Ltd next week?) r.o.b. 4 pcs voltage divider PCB: 6-8 pcs gas connectors: a plenty of HV connectors for cables: 25 pcs we cannot continue any further due to the lack of components (r.o.b. connectors!) → working at the moment with the testing procedures (ARC system)

TESTS DEFECT HUNTING IMPROVED → Good resolution for spotting etching defects: Practically all the defects are found and only around 10% of the identified defects are false, such as dust particle shadows, dark spots in copper surface or hole distortion by scratches ALGORITHM OPTIMIZED → the hole size distribution much better OPTICAL SCANNING We now consider that the scanning method satisfies the quality checking needs of the GEM foils → parameters fixed, no more development work

Analysis of defects and hole sizes An example of a good foil

Large regions of small holes Example 2:

A foil with many defects 127 defects classified as significant by size 84 significant defects on the backside defects distributed evenly over the whole GEM area Example 3: manufacturing process not clean enough

Capacitance measurement of readout boards semi-automatic capacitance measurement systems works well ! operation based on a GPIB- controlled LCR meter, XYZ table and a special fan-out card with a 130 pin mating connector. measures a relative capacitance variation from pin to pin. measurement time 10 min/conn. strip/pad capacitances easily measured also for an assembled GEM. a short between a strip and a pad !

We will continue these measurements with ARC-system, which has already collected 90 Sr data (both from strips and pads), but not yet optimally tuned.. -independent of calibration – scale by -Fe55 peak  210 primary electrons - mean ch. – 28 el. (vs. 30&TDR) -(53 mv/fC) (run at M = 8000)