1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Electrical & Control Power Supplies Trevor Hartnett.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Electrical Configuration and System Protection
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
Electrical & Control.
Focus Coil Quench Detector
Controls & Monitoring in MICE
Electrical components and systems
Presentation transcript:

1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane John Webb Steve Griffiths Chris White

DL Electrical Visit to LBNL/Wang NMR to Review Spectrometer 22 nd & 23 rd Feb 2010 Following the Visit, a Report / Recommendations and Actions Document was written and circulated as a discussion document. The following is a summary of the main contents 2

Recommendations/Actions Re-arrange the present Spectrometer power supply racks from a TWO rack power supply system into a THREE rack system and house the dump circuits in the additional rack. This removes the cooling water supplies from the power supply racks and re-establishes the cable access space at the bottom of the racks. House the FOUR Lakeshore 218 (temperature monitoring) units and the TWO AMI 135 (Liquid Helium level sensing) units in the re-arranged racks. 3

Recommendations/Actions Additional space to be provided in the MICE Hall. This will prove useful for anticipated additional rack space required for future AFC and RFCC power supplies and dump circuits”. 4 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Lower Tier (left to right) AFC & RFCC Dump Circuits AFC & RFCC Power Supplies Spectrometer Solenoid #2 Power Supplies Spectrometer Solenoid Dump Circuits Spectrometer Solenoid #1 Power Supplies Diffuser Tracker Planned rack layout is now as shown

Rack Layout – Plan Views 5 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Lower Tier (left to right) AFC & RFCC Dump Circuits AFC & RFCC Power Supplies Spectrometer Solenoid #2 Power Supplies Spectrometer Solenoid Dump Circuits Spectrometer Solenoid #1 Power Supplies Diffuser Tracker Ground Floor Level Mezzanine Level

Recommendations/ Actions STFC DL electrical staff to modify rack wiring and power distribution/cable management in line with UK electrical standards. Spare 300A Xantrex power supply and AMI controller to be sent to UK to aid design Control of the DC contactors to be undertaken by the MICE Spectrometer control system. Could also incorporate a PPS interlock if required. Water cooling systems to dump circuits should be flow and temperature monitored with possible UPS back up for an anticipated 30min period of RAPID discharge. 6

Recommendations/ Actions DL ECS Group power supply specialists strongly recommend that earth leakage protection/interlocking be implemented. An earth fault / leakage would cause an undetected current to flow in the MICE Hall protective earth network Ohm Leakage Resistors for Xantrex 300A Power Supplies Voltage taps to be made available for quench diagnostics to highlight areas of concern and as a means to prevent internal HTS lead over heating. Additional external circuitry will be required to achieve this.

Further Recommendations / Actions 8 DL ECS Group power supply specialists to liaise with Wang NMR directly, as agreed, to gather further information on the AMI420 quench detection system and the Lakeshore 60A power supply earth leakage arrangements to assist in resolving any issues. Spectrometer PSU sequence control to be provided by MICE Spectrometer control system. This will require documented information following the cool down training tests and magnet field mapping. This could prove a KEY requirement. A specification of the control system is needed to ensure that the system is designed for purpose and meets what is required. Wang NMR to provide a full circuit schematic diagram of the discharge diode arrangements, both INTERNAL and EXTERNAL. This will allow a detailed energy discharge analysis to be performed, to verify that all circuit components are rated accordingly, if not already done.

Further Recommendations / Actions 9 Investigate the FULL extent of a Helium release in the MICE hall (possibly all 18 magnets) during a quench, to see if additional extraction/monitoring is needed. Check water flow rates in the MICE Hall are sufficient for cooling of cryogenic compressors. (Steve Virostek) DL electrical design to investigate the locations of the requested MAG ON lamps for the SC magnets and ensure that non-magnetic fittings are used around the cooling channel. For complete reference please refer to full report document from IM/JW and Wang NMR PS & Control documentation from Spectrometer Review Nov 10 th 2009.

Recovery plan 10 The control philosophy for the spectrometer has, at present, been given a very low priority. This needs to be addressed because ‘How’ the spectrometer will be controlled in the MICE hall from the MICE control room is just as important an issue as any other concerns with regards modifications that need to be made to the Spectrometer. For example DL ECS Group feel that after the failure of a high current conductor has meant that the magnet has to be reopened, there is an opportunity to install additional monitoring cables to all positions along the high current conduction path. This should include high current input conductors and all coils / windings, similar to that provided on the Decay solenoid. These monitoring points can then be measured using a quench detection circuit. (Probably the same as being designed for Decay Solenoid) This will provide an automatic trip to the power supplies feeding the magnet, which provide protection which is fast, reliable and operates even if the magnet is left unattended. This will also provide essential monitoring of the magnet circuit, to identify where the quench has occurred, which would be very useful information particularly during development, commissioning and operation. DL ECS inclusion in the Recovery Plan team would be highly beneficial to the discussions and recommendations and would ensure that the requirements needed to properly control the spectrometer are given the same priority and consideration as the Cooling, Training and Mapping of the magnetic field.

Time Line / Costing plan 11 The work required to design, build and programme the software to control the Spectrometer, would be best progressed in parallel with the build of the Spectrometer. Otherwise a significant amount time will have to be added to the Spectrometer completion date prior to its installation in the MICE hall. The DL E&CS Group is therefore seeking approval to start purchasing the appropriate equipment to build the Cooling Channel control racks. Work would initially concentrate on the compressor controls which have been separated from the main cooling channel control rack into a separate control rack, located on the south mezzanine, which greatly simplifies both the design and cabling. The compressor controls are straight forward and fairly well understood and so can be progressed with some certainty of no or very small alterations, that would have little impact on the design.