HIE-ISOLDE Project Status Report

Slides:



Advertisements
Similar presentations
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Advertisements

1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HIE-ISOLDE Project: Status Report EXTRA COSTS AND ADDITIONAL RESOURCES CERN, 29 January 2013 Yacine Kadi.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
HIE-ISOLDE contribution packages M. Pasini BE/RF.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
1 1. Some recent views ( ) 2 Linac tunnel
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
HIE-ISOLDE Project Status Report
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
HIE-ISOLDE Project Status Report CERN, July 3rd 2012  Project Schedule vs LS1  R&D Activities  High-Beta cavities  Prototype cryomodule.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
O. Kester, NuSTAR annual meeting, 27/02/2013
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Cryomodule test stand at ESS site
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU Wire Scanner Milestones June 2017
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
LIU – EVM status and next steps
Update on HW commissioning
HIE-ISOLDE Status Report
HIE-ISOLDE Project Status Report
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-LINAC status report
HIE-ISOLDE Project: Status Report
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
HIE-ISOLDE contribution packages
Cryomodule Assembly Plan
Prototype cryomodule development
LCLS Injector System Overview D. H
East Hall under construction
Presentation transcript:

HIE-ISOLDE Project Status Report 67th ISCC Meeting CERN, 9 July 2013 Yacine.Kadi@cern.ch Project Organization Budget 2013-2016 Main Highlights & Issues Outlook

Project Organization Nominations: Quality Assurance Plan: Walter Venturini Delsolaro (BE/RF) = > DPL EMC coordinator ? Quality Assurance Plan: Hardware Baseline in place (EDMS) and now Operational Product Breakdown Structure finalized => equipment and document numbering Configuration Management => EN/MEF Follow-up of budget and work progress reporting => EVM set-up Technical Specs handled by CERN Project Office Documentation: HIE-ISOLDE website under re-construction => help of CATHI fellows EDMS => more then 600 documents produced HIE-ISOLDE project notes => 22 accessible through CDS Safety File: Descriptive Part of the Safety File has been checked and will be circulated for approval Hazard Inventory section and the Demonstrative Part are currently being checked. Operation Part and the Feedback Part are being drafted

Budget 2013-2016 Summary of the request for funding from CERN approved in the MTP2013 Evolution of the Cost-to-Completion: CtC 2010 = 35.3 MCHF CtC 2011 = 35.7 MCHF CtC 2012 = 36.5 MCHF approved (38.3 MCHF requested) CtC 2013 = 38.7 MCHF requested

Spending Profile

Cost: External Funding Phase 1 1.097.162 4.506.838 (*) to be considered additional expenses on salaries of 6.0 MCHF (2011-2014) already covered by EU-FP7-ITN Marie-Curie program: CATHI The missing income of 0.7 MCHF => loan from CERN

HIGHLIGHTS: Procurement Civil Engineering => metallic structures (bldg 170, 198 and 199) CV and EL Systems => installation work on-going until Q1 2014 Copper forgings => all high-beta cavities + 5 options (15 for 2013) Cavity substrate => 5 for 2013, 15 + 5 options (2014-2015) => 2 pre-series by EN/MME SC solenoid => 4 high-beta cryomodules + 2 options (first 2 by March 2014) Cavity Alignment system design and fabrication => CATE , 2 cryomodules Clean room at SM18 => to be delivered in August 2013 Beam Instrumentation => contract negotiation for the short boxes Invitation for Tenders Cryogenic Distribution System (September FC) => launched CM1 and CM2 vacuum + He vessels (Price Enquiry) => launched via CERN, Quadrupole & Dipole magnets with associated power supplies and supports Market surveys HEBT lines (vacuum system, long instrumentation boxes, inter-cryomodule supports, etc…) => in progress

HIGHLIGHTS: Procurement Already engaged for Phase-2 (10 MeV/u): High-beta cavities => (45+16kCHF)*10 = 610 kCHF SC solenoids => (85 kCHF * 2) = 170 kCHF Beam Instrumentation => (45 kCHF * 4) = 180 kCHF

HIGHLIGHTS: Technical Advances HEBT activities => Integration and EMC issues being checked Design Study for the Intensity Upgrade well underway Target + Front-end (FE8 and 9) Offline separator test bench HVAC + Cooling => nuclearization Charge Breeder => assembly of electron gun, test at BNL (US) Technical Workshop Nov. 28-29, 2013 SRF activities Cavity tests (more substrate, improved sputtering, procurement, etc…) Cavity ancillaries (RF coupler and tuner) LLRF (prototype, integration, etc…) RF controls and interlocks Installation Coordination and Co-activity Planning

Collapse of test cryostat in SM18 Insulation vacuum space was at atmospheric pressure when inner vessel was pumped Inner vessel did not withstand the external pressure and collapsed Copper screen and stainless steel threaded bars were deformed Cavity and insert remained untouched (Likely) time of the event: sometime during first pump down, 27 April 2013

Recovery test cryostat Decisions Use a spare cryostat and the old copper screen Install a vacuum gauge and a pumping port on the insulation vacuum space of the spare cryostat Timetable Friday 2 May 2013: Leak test of shield circuit OK (!); Removal of clean area roof and floor platform, cleaning tests of spare cryostat Monday 6 May: Removal of damaged cryostat and shield, checks and preparation of spare shield Tuesday 7 May: Transport and cleaning of spare cryostat, drying overnight Wednesday 8 May: cryostat back in hall, installation of Pirani gauge and pumping port, installation of cryostat in pit, pumdown of vacuum space Friday 10 May: leak test, reinstallation of clean area, conditioning Monday 13 May: Installation of cavity insert (kept clean in meanwhile), pumpdown Tuesday 13 May: leak detection, commissioning of cryogenics. Recovery.

Cavity tests

HIGHLIGHTS: Issues Design of prototype Diagnostic Box AVS delivered Faraday Cup which was tested at REX-ISOLDE Body of the DB was being tested (particule contamination and degassing) when it Failed => need to re-design mechanical part Additional Resources needed to develop the electronics for acquisition and motor control but also for the mechanical design => under review within BE/BI MS => in stand by (7 short and 13 long DBs) Integration issues (building 170): Advance on tunnel/shielding design and integration Cable routing

Failure of the prototype short DB History log of the experimental test done with the HIE DB: – 20 August 2012: Installation of HIE DB in REX-ISOLDE Hall – From 20 August 2012 to 5 February 2013: Experimental measurements with stable beams (A/q = 4 and A/q = 3.5); mainly Faraday cup test but also beam profile measurement including movement of the scanning slit (during this period, about 100 IN-OUT scans of the scanning slit were performed). – 8-9 April 2013: Tests of the scanning slit software, approx. 350 IN-OUT cycles. – 10-15 April 2013: Stress test of the scanning slit mechanism (run of 1340) Total number of IN-OUT cycles of the scanning slit mechanism: approx. 1800. HIE-BDB-TN-0001 (edms# 1284254)

HIGHLIGHTS: Issues Design of prototype Diagnostic Box AVS delivered Faraday Cup which was tested at REX-ISOLDE Body of the DB was being tested (particule contamination and degassing) when it Failed => need to redesign mechanical part Additional Resources needed to develop the electronics for acquisition and motor control but also for the mechanical design => under review within BE/BI MS => in stand by (7 short and 13 long DBs) Integration issues (building 170): Advance on tunnel/shielding design and integration => blocs ordered Cable routing => ongoing finalizing all DICs

Shielding of HIE SC Linac (EN/HE)

Project Schedule EDMS No. 1143510 (April 2013 ver.14)

Conclusions The strategic decision to refurbish the ALEPH cryo-plant will bring an additional delay of about 6 months => already integrated The identified additional cost of 2.557.000 CHF to cover Material, Personnel and R&D have been included in the MTP2013 and approved by Council (June 2013). Re-deployment & allocation of extra resources approved: cryo-module  (in total 5 man years) refurbishment of the ALEPH cryo-plant  (in total 8.3 man years) Electronics for Beam diagnostic boxes However it should be considered that in case extra resources related to: beam instrumentation (in total 4 man years) are not made available, as requested, further delays will apply. operation budget prepared and submitted for approval. Reviews for 2013: Cost and Schedule together with Risk Assessment => early November Safety Review => early November HIE-ISOLDE Technical Workshop => 28-29 November

Thank you HIE-ISOLDE web site -> http://hie-isolde.web.cern.ch/hie-isolde/ CATHI-ITN web site -> https://espace.cern.ch/Marie-Curie-CATHI/default.aspx