CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, 2005 1.Introduction et objectives.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Project FP7-PEOPLE-IRSES: ASK no
PREPARE Final reporting period Months February 2013 to 31 July 2014.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
AIDA Governing Board meeting 11 Dec 2014 Final Project Reporting 1 AIDA Governing Board meeting, 11 Dec 2014.
Training & research for academic newcomers A project of the King Baudouin Foundation © 2013 Gabriella Calderari1.
Cairo /08/2002 Annual Report of the European Regional Focal Point. Dominique PLANCHENAULT.
AB 86: Adult Education Consortia Planning Webinar Series
Districts In Good Standing. Origins Discussed at November 2010 meeting Approved by the Soil and Water Conservation Commission during January 2011 meeting.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Large-Scale Integrating Project SEVENTH FRAMEWORK PROGRAMME THEME 1: HEALTH Optimization of Treatment and Management of Schizophrenia in Europe General.
INFSO-RI Enabling Grids for E-sciencE Financial Status EGEE Collaboration Board – Athens – April 20 th, Severine Bergerot.
Northern Periphery Programme Final Administrative Report Lead Partner Seminar 22 nd February 2012.
CLIC activity of Jukka Väinölä Feb 20121J. Väinölä, BE-RF-PM.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Contractual & administrative matters: state of the art 16th Technical Committee meeting Ljubljana IWT - Belgium15-16 Sept
Monica Pantea, MANETGA and PCC meeting in Vienna :30Coffee & Welcome 10:00Opening (ACM) 10:15Overview Annual Report 2007 (ACM) 11:15coffee 11:30Scientific.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
THE CHILD AND ADULT CARE FOOD PROGRAM playing a vital and integral role in improving the overall quality of care and daily nutritional health of participants.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Althea Wilkinson RadioNet Project Manager University of Manchester Jodrell Bank Observatory Project Manager’s Report & Finance Report Rome September 2008.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Reporting Kick-Off Meeting in Geneva. Kick-Off Meeting in Geneva: Budget and FinancesSlide Reporting Outline 1.Reports and deliverables 2.Deadlines.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
INFSO-RI ETICS Periodic Review – Administrative and Financial requirements Karin Burghauser, CERN Project Admin.
Status of Annual Report : Submitting of the Annual Report with only 3-days delay..not final version due to the non-final financial information.
CARE Steering Committee R. Aleksan CARE Steering Committee Meeting, September 5-6, Introduction et.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
DHHS COE Meeting Agenda May 16, 2012 Welcome Introductions Contract Compliance Reporting Open Window Updates Questions and Answers.
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
CAST: Financial and administrative issues Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework.
European Commission Virtual Institutes Workshop--28 September Thematic network contracts Megan Richards DG RTD Virtual Institutes  Thematic Network.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
Budget & Finance. OUTLINESOUTLINES Part 1 : The Eden project in figures Part 2 : Financial relations within the 6th FP 2 1. Roles in the financial process.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
Preparation of the Self-Study and Documentation
AMICI WP1 – Management, coordination and dissemination
PLANNED ACTIONS – UPCOMING DUTIES
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
as of today 123 registered participants
SKADS Controller’s Meeting Timeline Annual Financial Report
From a project idea to the kick-off meeting
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
NEF Negotiation forms IT tool to support Negotiation (Participant Portal) Call FP7-ENV-2013-WATER-INNO-DEMO.
WP 1 Management and Coordination
Presentation transcript:

CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, Introduction et objectives 2.CARE funding and general administrative matters 3.Reporting

Main objectives of the meeting 1.Review financial situation Status of EU funding Total costs Budget for next 18 months 2.Review organizational matters Modification of the contact 3.Agree on schedule for Annual report

Total costs for the 21 first months ( till September) Total (5 years) expected costs: € Total costs for past 21 months: €

Total costs for the 21 first months ( till September)

Total expected cost in 2005: €

Summary of the financial situation EU funding Received in 2005: € Funding distributed to the partners: € Total received: € Total distributed: €

Total expected costs for next 18 months: € Total costs requested to the EC: € Budget for the next 18 months

Modification to the contract to be sent to D. Pasini addition of universities as co legal entities for LAL and IPNO addition of universities as co legal entities for LAL and IPNO Exemption of certain contractors from the requirement to provide Exemption of certain contractors from the requirement to provide periodic audit certificates; derogation from Article 7.2 of the model contract. Change of some participants representatives (see letter to the EC) Addition of new associates Participa nt number Organisation (name, city, country) Short name Short description (i.e. fields of excellence) and specific roles in the consortium (* indicates work package responsibilities) Associate d to Associated Institutes Center for the Advancement of Natural Discoveries using Light Emission, Yerevan, Armenia CANDLE Fields of excellence: Beam dynamics in the main linac, optic optimization, emittance preservation, trajectory correction, wake fields and impedances, beam dynamics in damping ring, non-linear and fringe field effects. Specific participation in:N1 CERN Technion – Israel Institute of Technology, Tel-Aviv, Israel Technion- IIT Fields of excellence: Beam Dynamics simulation, control system development and the integration of the two. Specific participation in:N1 CERN Stanford Linear Accelerator Center, Stanford, USA SLAC Fields of excellence: Specific participation in: N1 CERN Cracow University of Technology, (Institute of Applied Mechanics), Krakow, Poland CUT Fields of excellence: Vibration and stabilization issues, measurement and control; numerical analysis of vibration. Specific participation in:N1 CERN

Preliminary approval of the next 18 months work program presented by the NA/JRA coordinators by the CGB Get an approval of the plan to get the yearly report done as early as possible  December 16 th : NA/JRA coordinators send the narrative description (Final version) of the 2005 scientific work to R.A. and O.N.  January 13 th : All participant institutes send the financial tables  Justification of Costs Forms for 2005 to R.A and O.N.  Estimated costs and request to EC for the next 18 months sent to NA/JRA coordinators with copy to R.A. and O. N.  January 20 th : All participant institutes send  Form C to R.A. and O.N.  Audit Certificates to R.A. and O.N.  January 27 th : Put the final report on the CARE web  February 3 th : last (minor) corrections included in the report  February 10 th : Send report to the EC Annual Report Schedule Approval of the work done so far in CARE by the CGB