9 th AWAKE Technical Board 11 March 2015. Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.

Slides:



Advertisements
Similar presentations
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Advertisements

FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
AWAKE workshop, Greifswald, September 24 th -26 th, 2014Steffen Döbert, BE-RF AWAKE electron source update.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
AWAKE electron source New Electron Source WP at CERN
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Proton Driven Plasma Wakefield Acceleration – AWAKE – Project
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
P. Muggli, CERN, 09/04/2014 Summary of the 1 st Meeting of the Physics and Experiment Board Patric Muggli Max Planck Institute for Physics Munich
Agenda : CLIC Civil Engineering and Services (CES) WG.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 1. Some recent views ( ) 2 Linac tunnel
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Update on the Laser Beam Line
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Summary of Kick-Off Meeting: AWAKE Technical Board 9 April 2014 E. Gschwendtner, 11 April
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Outline Recent Evolution Introduction AWAKE at CNGS Organization Work Packages Planning Resources Summary Edda Gschwendtner, CERN2.
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Extraction and beamline progress B.Goddard TE/ABT.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
CERN AWAKE Project Status. Outline Introduction Project organization West Area and CNGS AWAKE facility studies Required input from the Collaboration Summary.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Summary of the AWAKE Cost and Schedule Review Edda Gschwendtner, CERN Reviewers: Florian Sonnemann, CERN (chair); Ralph Assmann, DESY; Massimo Ferrario,
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
AFC 2017 (and 2018) AFC timeline:
EAAC, Isola d’Elba, September 2017, WG1
Plasma Wakefield Acceleration and a possible eP scattering Experiment MPP Retreat January 21, 2014 Allen Caldwell.
LIU – EVM status and next steps
ELENA Beam Transfer Workpackage
AWAKE proposals for BE/BI
WPs concerned by L4 connection:
Advanced Research Electron Accelerator Laboratory
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

9 th AWAKE Technical Board 11 March 2015

Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be chosen Patric: circulate final drawing of plasma cell support All: send numbers about costs and manpower by the end of Feb 2015 Janet: send current data to Gilles Lawrence, Jan, Friederike: proceed with studies on the vacuum window Lawrence, Bart, Silvia: exchange information about the position of the camera and the effect of the real optical line Rhodri, Edda, Matthew: finalize the addendum to the MoU. All: send requirements for signals/timing in the experiment until end of Feb (table has been circulated by Wolfgang Hoefle) Patric and Stefano: meet to talk about the camera timing Patric and Jan: define what can be done at GRANT with the clean tube after the fabrication at CERN Ans and RP: decide which shielding option for TSG41 should be realized BI, Marzia, Edda: sort out the BI equipment planning WP RF synchronization, spectrometer and BI: please comment on the planning schedule 2

Agenda 9 th TB 3

Preparation for the AWAKE Cost and Schedule Review, 28 April 2015

AWAKE Cost and Schedule Review, 28 April 2015 a.m. : presentations – Technical description – Break-down of work-packages (CERN and Collaboration institutes) – Resources Manpower Cost – Schedule – Tools to control, Quality assurance, risks – Status today p.m.: meeting of reviewers 5

(Simplified) AWAKE Project Lifecycle  Required Documents 6 InitializeStudyDesignBuildCommission Operate & Maintain Decommision Oct 2011 LOI June 2012 AWAKE study project March Conceptual Design Report - Work package Description (EDMS ) August 2013 AWAKE approved April 2015 Engineering specifications April 2015 Cost and Schedule Review Dec 2015 Safety file Phase 1 Phase 2

Engineering Specifications  Needed for Phase 1 7

Engineering Specifications 8

Engineering Specs –Vacuum System 9

Work Package Descriptions  Needed for Phase 2 Similar template as Engineering Specifications, but ‘lighter’. 10

Break-Down Structure CERN AWAKE Project Management – Planning, Safety, Resources, Integration, project QA, configuration management, layout database Coordination groups: – Coordination group proton/electron line: C. Bracco – Coordination group integration, installation, infrastructure: A. Pardons – Coordination group electron source: S. Doebert – Coordination group laser: V. Fedosseev – Coordination group secondary beam line: E. Gschwendtner – Coordination group experiment: P. Muggli Work packages: – Magnets: J. Bauche Proton line magnets Electron line magnets – Power converters: G. Le Godec – Beam instrumentation: L. Jensen, R. Jones – Laser beam line: V. Fedosseev – Electron source: S. Doebert – RF synchronization: Wolfgang Hoefle – Interlock: Bruno Puccio, Markus Zerlauth – Shielding dumps: A. Pardons – Civil engineering: J. Osborne – Cooling and Ventilation: M, Battistin – Electricity: T. Charvet – Cabling: J-C. Guillaume, G. Gros – Access: V. Rios – Fire & Gas: S. Grau – Radiation Protection: Helmut Vincke – Transport and Handling: C. Bertone – Survey: J-F. Fuchs – Ethernet: Maryse Da Costa – Controls: M. Gourber Pace – Operational SW: BE-OP – Intercepting devices: V. Vlachoudis 11 Institutes: Work packages: – Plasma cell: E. Oez, P. Muggli – SMI diagnostics: P. Muggli – Laser: J. Moody – Laser dump: P. Muggli – Electron spectrometer: L. Deacon – Accelerating structure: G. Burt – Electron line diagnostics: V. Verzilov  Who is responsible for which work package to provide documents and information for the CSR  If needed, each subsystem needs its own engineering specifications! E.g. -LLRF, RF synchronization -Electron source, powering system -Machine interlock, beam interlock -BI for p-line, BI for e-line, …

We need the engineering specifications/work package descriptions by  8 APRIL 2015 latest! 12