Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012.

Slides:



Advertisements
Similar presentations
1 NIST NwHIN Testbed. 2 What's NwHIN The nationwide health information network is a set of standards, services and policies that enable secure health.
Advertisements

Joint Exchange / Interop Work Group Test Workgroup John Donnelly Aug 1, 2012.
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
California Trust Framework Pilot Request for Funding Informational Webinar 24 June 2013.
S&I Framework Testing HL7 V2 Lab Results Interface and RI Pilot Robert Snelick National Institute of Standards and Technology June 23 rd, 2011 Contact:
Inter-Institutional Registration UNC Cause December 4, 2007.
360Exchange (360X) Project 10/25/12. Reminders / announcements Mission / scope review Workgroup updates Implementation sites 1 Agenda.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Outsourcing IAM in North Carolina
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
NextGen Interoperability – Leading the Charge Presenter – David Venier DISCLAIMER: The views and opinions expressed in this presentation are those of the.
Systems Analysis and Design in a Changing World, 6th Edition
PSU CS 106 Computing Fundamentals II Product Life Cycle & SW Product Life Cycle HM 9/3/2007.
Cross Domain Patient Identity Management Eric Heflin Dir of Standards and Interoperability/Medicity.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
Project Management on SharePoint with BrightWork.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
Cross Domain Patient Identity Management Eric Heflin Dir of Standards and Interoperability/Medicity.
Initial slides for Layered Service Architecture
HL7 Study Data Standards Project Crystal Allard CDER Office of Computational Science Food and Drug Administration February 13,
Agenda Teams Responsibilities Timeline Homework and next steps.
Automate Blue Button Initiative Push Workgroup Meeting January 7, 2013.
Digital Object Architecture
K-12 Web Content Development Process
Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.
1.View Description 2.Primary Presentation 3.Element Catalog Elements and Their Properties Relations and Their Properties Element Interfaces Element Behavior.
Volunteer Management System Presented by Team SE18-08S SE18-T08S - Jan 2012.
Reference Toolkit – What is a “reference” toolkit? – What is the status of the generation 2 Reference Toolkit? – How Big? – Tracking it. We need to understand.
PDMP & HITI Solution Planning/IG Workgroup Session July 3, 2014.
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman Aug 22, 2012.
1 NCHELP Update Common Record for FFELP & Alternative Loans Meteor The High Performance Channel.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
LMS Integrations Agenda The Past: LAMS 1.0 Integrations Now: Integration Architecture LAMS 2.0 / Moodle 1.7 Integration The Future:
Defining the 2016 CAS-2 cycle Timeline Slides used by the CAsC Committee on its July 23 rd T-con to establish the timeline for the main activities related.
SAIF Effects on Interoperability Reviews WG Baris E. Suzek May, 11, 2010.
S&I Framework Provider Directories Initiative All Hands Meeting 10/7/11.
ENL1819T Progress Report Confidence in Our Success.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Judith Huntman/Joe Lamy Aug 15, 2012.
Security, Privacy Access openPASS Open Privacy, Access and Security Services Project Status Report July 1, 2008.
Service Component Registry and Repository (SCRR) April 26, 2007 Lico Galindo 2007 Exchange Network National Meeting.
IDOA RFP Media Buy Pre-Proposal Conference June 11, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
Query Health Distributed Population Queries Implementation Group Meeting October 11, 2011.
Lab Results Interface Validation Suite WG July 28, 2011.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting May 9, 2011.
HPD Updates By Eric Heflin, Co-Chair ITI PC CTO Texas Health Services Authority CTO/CIO The Sequoia Project.
Ensuring Conformance & Interoperability NHIN Testing Leslie Power, NHIN Testing Lead (Contractor) Office of the National Coordinator for Health IT WEDNESDAY,
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
HITPC - Information Exchange Work Group Meaningful Use Stage 3 Subgroup 2: Care Coordination and Patient and Family Engagement Co-Chairs: Jeff Donnell.
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage PMD User Story & Harmonization August 7, 2013.
Electronic Submission of Medical Documentation (esMD)
Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin Sept 19, 2012.
Electronic Submission of Medical Documentation (esMD) Author of Record Workgroup Friday, June 29,
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012.
Standards & Interoperability (S&I) Structured Data Capture (SDC) FHIR Profile IG SWG.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage Harmonization August 14, 2013.
Lab Results Interface Validation Suite Workgroup and Pilots Workgroup Vision, Charter, NIST Collaboration, July 8,
HIT Standards Committee NwHIN Power Team Dixie Baker, Chair July 20,
S&I Framework Provider Directories Initiative All Hands Meeting 09/23/11.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting July 18, 2011.
Director’s Progress Review Closeout Meeting
Select and Implement a Web Experience Management Solution
HITSP Project 2007 Work Plan and Schedule Contract HHSP EC
Director’s Progress Review Closeout Meeting
Web Service Security support in the SSE Toolbox
NCHELP Update Common Record for FFELP & Alternative Loans Meteor
Presentation transcript:

Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012

Roll Call – Admin Announcements – Eric (5 mins) ‘Round-the-Room for Harmonized Specs – Eric (10 mins) Phased Approach to Harmonization for Remaining Specs – Judith/Ed (10 mins) ‘Round-the-Room for Phasing Approach – Eric (10 mins) Test Execution and Test Architecture – Ed (10-15 mins) Definition of Done – Ed (5 mins) Test Case Metrics – Ed (7 mins) Open Discussion – All Wrap Up - Eric RFP Schedule Review - Eric Agenda 2

Harmonized PRL (PD/QD/RD/MP/AF) Tests Are Drafted No objections were received and are now candidates for “final” status Future changes are possible, but will be incorporated into the next phase of test cases design and implementation We will do a ‘round-the-room next on the status Vote next week to consider the harmonized Phase I test specs final RFP Has 5 respondents Bidder interviews have been conducted top few vendors Analysis is nearing completion Announcements 3

‘round-the-room Can we vote next week to consider the harmonized test specifications (presented over the last few weeks) as final? The scope of this question is the harmonized specifications for Patient Record Lookup (aka Patient Discovery, Query for Documents, and Retrieve Documents + Messaging Platform and Authorization Framework).

Harmonization Phases Phase 1 – SOAP Send/Receive Phase 2 – Direct Send/Receive Phase 3 – Secondary Methods, Service Discovery, & Provider Directories Parent Use Cases (Done) Test Case harmonization (Done) Tests: Mess & Auth Framework (Done) Tests: Patient Discovery (XCPD, PIX, PDQ), Query for Documents, Retrieve Documents (Done) Test Execution Guides (Done) Parent Use Cases Test Case harmonization Tests: Direct Applicability Statement (Done) Tests: Direct XDM/XDR-Bridge (Done) Tests: Direct Certificate Discovery (Done) Test Execution Guide Parent Use Cases Test case harmonization Tests: Web Services Registry (Done) Tests: HPD+ Tests: Document Submission (Done) Tests: Administrative Distribution (Done) Test Execution Guides Unified Test Process – Has Been Proposed

Phase II Work Plan: Direct Test Specs BodyStatus * Parent Use Cases Done Test Case harmonization -Top-down (use case) -Bottom-up (spec based) tests In Process Tests: Direct Applicability Statement Done Tests: Direct XDM/XDR-Bridge Done Tests: Direct Certificate Discovery Done Test Execution Guide -Combine Mod Spec Phase II (messaging) -Phase III (cert discovery) documentation Not Started * More detailed status will be posted on the Wiki

Phase III Work Plan: Secondary Specs Secondary Methods, Service Discovery, & Provider Directories BodyStatus Parent Use CasesIn Process Test case harmonizationNot Started Tests: Web Services Registry -Bottom-up (spec based) test package is complete Done Tests: HPD+ -Top-down (use case) test package is complete Not Started Tests: Document Submission -Bottom-up (spec based) test package is complete Done Tests: Administrative Distribution -Bottom-up (spec based) test package is complete Done Test Execution Guides -Doc Sub and Admin Dist draft guides exist In Process

‘round-the-room What are your thoughts about the phased approach for harmonization? Do you object to the proposed approach?

Test Case Execution Manual: Step-by-step instructions are included in written test packages Draft tracking worksheet for execution methods What tests are the best candidates for tooling? SOAP UI as a component, review different uses of it Other utilities/components to research? What about the conformance checklists?

Refresh on Reference Toolkit concept Check-in on feedback to high-level Toolkit architecture Assumptions on prioritization at utility level Message simulation for High test cases in PD/QD/RD Proof of concept of lightweight orchestration (BDD layer) Integration of NIST content tools (c32 then CCDA) Ideas/volunteers for utilities, modules, or approaches? Definition of “done” Metrics for SOAP UI scripts Architecture Review 10

Open Discussion Other topics?

RFP released — July 2nd Questions received by 6 organizations Answers distributed — July 13th Bids due — July 20th Expected award — August 15th Contract start — TBD RFP Schedule Review 12 We are here