SID RAL meeting; 14-16 April 2008 H.Weerts DHCAL status, progress & future Based on RPC efforts in CALICE mostly by US groups H.Weerts for DHCAL group.

Slides:



Advertisements
Similar presentations
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Advertisements

Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
1 m 3 Prototype Digital Hadron Calorimeter Collaborators Argonne National Laboratory Boston University University of Chicago Fermilab University of Texas.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
First analysis of DHCAL Data José Repond Argonne National Laboratory Linear Collider Workshop LCWS 2012 October 22 – 26, 2012 University of Texas at Arlington,
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Simulation of RPC avalanche signal for a Digital Hadron Calorimeter (DHCAL) Lei Xia ANL - HEP.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
DHCAL Construction Status Lei Xia Argonne National Laboratory ALCPG2009, Albuquerque.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
Digital Hadron Calorimeter (DHCAL) José Repond Argonne National Laboratory CLIC Workshop 2013 January 28 – February 1, 2013 CERN, Geneva, Switzerland.
Recent DHCAL Developments José Repond and Lei Xia Argonne National Laboratory Linear Collider Workshop 2013 University of Tokyo November 11 – 15, 2013.
Tests of a Digital Hadron Calorimeter José Repond Argonne National Laboratory CALICE Collaboration Meeting March 10 – 12, 2010 University of Texas at Arlington.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
Analysis of DHCAL Muon Events José Repond Argonne National Laboratory ALCPG 2011 Meeting, University of Oregon, Eugene, OR.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
BILCW07, Feb 2007, H.WeertsSlide 1 RPC-DHCAL Progress & Status H.Weerts BILCW07, Beijing, February 4 – 7, 2007 Research done as part of program of CALICE.
Calibration of a Digital Hadron Calorimeter with Muons Burak Bilki d, John Butler b, Tim Cundiff a, Gary Drake a, William Haberichter a, Eric Hazen b,
Construction and Operation of DHCAL Fermilab Test Beam Facility Lei Xia ANL_HEP.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
US DHCAL Status Lei Xia Argonne National Laboratory.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
DHCAL Construction Status José Repond Argonne National Laboratory CALICE Meeting, February 19 – 20, 2009 Kyungpook National University, Daegu, Republic.
DHCAL Construction Status Lei Xia Argonne National Laboratory CALICE Meeting, September 16 – 18, 2009 Université Claude Bernard Lyon I, France.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
Future R&D of the RPC based Digital Hadron Calorimeter (DHCAL) Lei Xia ANL_HEP.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Analysis of DHCAL Data José Repond Argonne National Laboratory CALICE Meeting, September 16 – 18, 2009 Université Claude Bernard Lyon I, France.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
DHCAL Progress Report José Repond Argonne National Laboratory SiD Meeting, SLAC, October 26, 2006.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Vertical Slice Test Data
A Digital Hadron Calorimeter Resistive Plate Chambers
Recent DHCAL Developments
Construction and Testing of a Digital Hadron Calorimeter Prototype
(My personal) CALICE Report
Analysis of Muon Events in the DHCAL
The DHCAL: an overview José Repond Argonne National Laboratory
GEM-based Digital Hadron Calorimetry for SiD
Tests of a Digital Hadron Calorimeter
Tests of a Digital Hadron Calorimeter
Presentation transcript:

SID RAL meeting; April 2008 H.Weerts DHCAL status, progress & future Based on RPC efforts in CALICE mostly by US groups H.Weerts for DHCAL group Argonne National Lab

SID RAL meeting; April 2008 H.Weerts Background To use PFA algorithm for SiD need fine hadronic calorimeter with very fine longitudinal and transverse segmentation. Solution investigated here is a gas based digital calorimeter Several solutions have been proposed; CALICE collab. pursues several Up to now such a hadronic calorimeter has not been realized in a experiment. Based on work with RPCs, use RPCs in avalanche mode. 1x1 cm sampling transverse Design digital/ one bit readout system Build vertical slice of whole system to test Groups: Argonne, Boston, Fermilab & Iowa ( built & run slice test) Last year Several years

SID RAL meeting; April 2008 H.Weerts RPC Designs Resistive paint Mylar 1.2mm gas gap Mylar Aluminum foil 1.1mm glass -HV Signal pads G10 board Resistive paint Signal pads Mylar Aluminum foil 1.1mm glass 1.2mm gas gap -HV G10 board Two-glass design One-glass (‘exotic’) design History RPCs developed over last few years & tested Digital readout system designed DCAL chip designed & prototype built with Fermilab …… …..stuck, little funding … decide to build slice test DCAL chip new prototype 2007 construct & operate Two months in cosmic & debug mode Testbeam at Fermilab in summer Results now

SID RAL meeting; April 2008 H.Weerts Current Pad Board & Front End Board Design 4-layer Pad-board (3 shown) 8-layer FE-board (3 layers shown) Blind vias to route sensitive signals to glue pads – needed to minimize contact with digital lines in FEB Also has blind vias  Very complex board design to minimize crosstalk & digital noise pickup

SID RAL meeting; April 2008 H.Weerts System Physical Implementation VME Interface Data Collectors Timing Module Ext. Trig In Data Concentrators GPS IN Data Concentrators Front End Board with DCAL Chips Communication Link 6U VME Crate To PC Chambers Basic data block: 16-bite package (trigger timestamp OR hit data)  Ext Trigger  System Clk  Cnt Reset  Ext Trigger  System Clk  Cnt Reset  Trigger TimeStamp Pkg  ASIC Hit Data Pkg  Ext Trigger  System Clk  Cnt Reset  ASIC Hit Data Pkg  Trigger TimeStamp Pkg  ASIC Hit Data Pkg  ASIC Hit Data 

SID RAL meeting; April 2008 H.Weerts Test Beam Setup and Data Collection The stack containing nine layers within the blue hanging file structure The gas distribution rack Beam Same set up also used in cosmic ray test stand; just rotated( Blue frame)

SID RAL meeting; April 2008 H.Weerts Measurement of RPC efficiency, multiplicity Paper accepted by Journal of Instrumentation Determine operating point in: high voltage & signal threshold corresponding to the required efficiency & multiplicity.

SID RAL meeting; April 2008 H.Weerts Dependence on High Voltage

SID RAL meeting; April 2008 H.Weerts Dependence on High Voltage With higher HV lower pad multiplicity for a given efficiency

SID RAL meeting; April 2008 H.Weerts Dependence on Threshold Exotic chamber Operating point: eff ~ 90%Operating point: M ~ 1.4 – 1.7 The chambers were operated with a high voltage of 6.3/6.0 kV

SID RAL meeting; April 2008 H.Weerts Dependence on Threshold Exotic chamber The chambers were operated with a high voltage of 6.3/6.0 kV

SID RAL meeting; April 2008 H.Weerts Number of Hits The chambers were operated with a high voltage of 6.3/6.0 kV. The threshold was set at 110 counts. Exotic chamber

SID RAL meeting; April 2008 H.Weerts x-y Map of Inefficiency The data were collected with a high voltage of 6.3 kV and a threshold of 110 counts. Fishing line spacers Largest boxes correspond to an inefficiency of ~15%

SID RAL meeting; April 2008 H.Weerts RPC noise measurement Included in same paper

SID RAL meeting; April 2008 H.Weerts Measurement of the Noise Rate The noise rate was measured using the self-trigger data acquisition mode of the DCAL chip. The measurements were performed with a high voltage setting of 6.3 (6.0) kV, for the default (exotic - RPC6) chambers.The rate at our default threshold setting of 110 DAC counts corresponds to about 0.15 Hz/cm 2. Extrapolated to a calorimeter with ~50·10 6 channels, this rate in turn corresponds to 0.2 hits/event. With the high voltage to the chambers turned off the noise rate was found to be less than 4·10 -5 Hz/cm 2. The measurements were performed with a threshold at 110 counts. The high voltage values for the exotic chamber (open circles) were set at 300 V less than indicated in the plot. Operating point: 0.1 – 0.2 Hz/cm 2

SID RAL meeting; April 2008 H.Weerts Measurement of the Noise Rate x – y map of the noise hits for a typical default (RPC5) and the ‘exotic’ (RPC6) chamber. A clear clustering along the fishing lines located approximately at x = 4.2 and 10.7 is visible. Fishing line spacers

SID RAL meeting; April 2008 H.Weerts Noticed correlation in efficiencies and pad multiplicities Barometric pressure at Calumet Harbor, IL 10 days Measurements with Cosmic Rays

SID RAL meeting; April 2008 H.Weerts ε = – *p Average over all non-exotic chambers Error bars on pressure show range Error bars on pressure set to 0 for fit Higher pressure → lower efficiency Δ ε/ε = Δ p/p

SID RAL meeting; April 2008 H.Weerts Error bars on pressure show range M = – *p Average over all non-exotic chambers Error bars on pressure set to 0 for fit Higher pressure → lower multiplicity Δ M/M = -3.0 Δ p/p

SID RAL meeting; April 2008 H.Weerts DHCAL as a calorimeter measurement of positron shower and pion shower Will be short on this; presented several times already

SID RAL meeting; April 2008 H.Weerts Two independent analyses a) Study of energy response b) Study of longitudinal development → Results still very preliminary Data sample - Data at 1, 2, 4, 8, and 16 GeV Monte Carlo simulation - Needs calibration constants from μ-runs - Needs careful implementation of pad multiplicities - Current comparison based on assumptions and ignoring details Analysis of Positron Data

SID RAL meeting; April 2008 H.Weerts Pion Analysis Exactly one cluster in first layer Distance R< 5 Number of hits in first layer <5 Number of hits in second layer <5 Nice MIP peaks Some contamination from ‘late’ showers Hit distribution: MIP-like events (muons and non-interacting pions) Data selection:

SID RAL meeting; April 2008 H.Weerts Hit distribution: showering events (shower starts at ~ 1 – 2 layers) Some MIP contamination at 16 GeV/c Not much data at 1 and 2 GeV/c Exactly one cluster in first layer Distance R< 5 Number of hits in first layer <5 Number of hits in second layer >4 Data selection:

SID RAL meeting; April 2008 H.Weerts System stability Electronic noise Readout errors

SID RAL meeting; April 2008 H.Weerts System stability  RPC stack has been running since July, 2007 u Running 24/7 up to now (~9 mons), with very few interruptions u Most tests with 8 RPCs (max: 9, min:6), ~ 2k channels u Readout system is very stable u RPCs are also very stable s Produced 12 RPCs (including 1 exotic) for Slice Test s 1 physically broken during a display s 1 paint layer damaged by humidity at MTBF (other chambers used different paint, immune of the problem) s 2 RPCs accidentally ‘damaged’ by impure gas –“damage” = regional higher noise rate, but otherwise OK to use s All other (8) RPCs are problem free (including the exotic!) –Noise levels (aging indicator) are very low and very stable!  Electronic system has amazing noise performance u Electron noise floor at Thr = 10 – 15 DAC cnts (low gain, HV off) u Normally running at Thr ~ 110 DAC cnts

SID RAL meeting; April 2008 H.Weerts Data Error: current status  Most errors have been successfully eliminated through system improvement u Improved grounding u Improved detector noise u New firmware  Only one data error left – under study u Originally thought it was not harmful u Recent tests shows that system drop data packages (trigger timestamp AND hit data) at ~0.5% level u Extensive tests started recently (identified the problem on a single piece of the readout system) u Expect to solve the problem in the near future – then we will have a PERFECT (fully debugged) readout system With a fully debugged VST readout, we are confident in building 1m 3 Long term running & availability of VST has been critical

SID RAL meeting; April 2008 H.Weerts Full size RPC prototype chamber dead area

SID RAL meeting; April 2008 H.Weerts Large RPC production: 1 st RPC (almost) done  1 st full size RPC constructed for 1m 3 u Used 1.2mm glass, 96cm x 32cm (VST: 1.1mm glass, 20cm x 20cm)  Slightly modified assembly procedure works for large chamber u Chamber is gas tight (~ 5 meters long glue trace!) u Chamber is relatively stiff, deformation doesn’t affect gas tightness u Good for large scale production  Chamber dead area: 4.7% u Frame: 3.3% (irreducible, unless go for larger chamber) u Fishing line: 1.4% (can be reduced, if use other spacer) u Not including HV connector and gas tubing (supposedly sit in gap between modules in a real detector

SID RAL meeting; April 2008 H.Weerts Further R&D

SID RAL meeting; April 2008 H.Weerts Last DCAL modifications before production  50% data lost when output buffer is empty u Not a problem in triggered running u Simple bug in ASIC logic: identified, corrected and simulated  Noise introduced by internal test lines u OK for RPC, fixed for ASICs on GEM board u Simple fix in chip packaging  Problem with mask register and CI-mask register u Original design use asynchronous clear -- more sensitive to noise u Improved detector to reduce noise u Modify ASIC: needs some design time (~1 week)  Problem with slow control readout u A bug in the ASIC prevents daisy chaining slow control readout – addressed in FE board design u Trivial change already implemented No more prototype run needed before chip production

SID RAL meeting; April 2008 H.Weerts Current Pad Board & Front End Board Design 4-layer Pad-board (3 shown) 8-layer FE-board (3 layers shown) Blind vias to route sensitive signals to glue pads – needed to minimize contact with digital lines in FEB Also has blind vias  Very complex board design to minimize crosstalk & digital noise pickup

SID RAL meeting; April 2008 H.Weerts Front End Board - Work in Progress  Current design has extremely good noise performance u Noise floor: only 10 – 15 ADC count (low gain) u System comfortably 30 ADC count or even lower (normal ADC count) u Left a lot of head room for cost reduction  Have designed new 16 cm x 16 cm FEB with NO blind vias u Still 8 layer u Still has ground shielding layers to protect charge signals u Primary change: now ALL vias come down to glue pad layer (bottom)  Have designed Two new 16 cm x 16 cm Pad Boards also with NO blind vias u One is 2 layer, with no internal ground plane u One is 4 layer with 2 internal ground layers

SID RAL meeting; April 2008 H.Weerts New Pad Board & Front End Board Design 4-layer Pad-board (3 shown) 8-layer FE-board (3 layers shown) No blind vias

SID RAL meeting; April 2008 H.Weerts New Pad Board & Front End Board Boards are manufactured, being stuffed and tested

SID RAL meeting; April 2008 H.Weerts FEB – Current Thinking  If the new design is successful, we can make larger boards:  Could not make larger boards before with blind vias – Too Difficult  Larger boards are cheaper, eliminates cables & connectors, reduces impedance mismatches, improves reliability, etc.

SID RAL meeting; April 2008 H.Weerts Cost Assuming new design of Pad/Front-end boards is viable Includes labor and M&S In US$10 layers40 layers ItemCostContingenc y TotalCostContingenc y Total RPCs16,0004,00020,00034,0008,00042,000 EDIA70, DCAL202,00024,000226,000311,00054,000365,000 FEB36,00018,00054,000134,00067,000201,000 DCON11,0005,00016,00026,00013,00039,000 PadB11,0006,00017,00043,00021,000064,000 DCOL18,0009,00027,00080,00040,000120,000 Misc14,0007,00021,00054,00027,00081,000 Total378,00073,000451,000752,000230,000982,000 With Pad/Front-end boards from the VST → add ~$290,000 + contingency (40 layers) Substantial reduction from original estimate because of VST work Reduction from: 424K  134K ( factor of 3)

SID RAL meeting; April 2008 H.Weerts Plans Under all circumstances Will complete ongoing studies Will publish results from Vertical Slice Test Instrumentation paper puiblished in IEEE Muon calibration paper (almost) accepted by JINST Positron response paper – analysis complete, simulation needed, draft in preparation Pion response paper – analysis complete, simulation needed RPC rate measurement – not initiated yet Assuming availability of funds Will complete changes to DCAL chip and will produce chips Will start assembly of large chambers Will complete design of integrated Front-end boards and Data Concentrators Will produce entire readout system → ready for test beams in early 2009 Have received funding for FY08(last week): $290K to start Goal: be part of CALICE FNAL in 2009

SID RAL meeting; April 2008 H.Weerts Summary VST was very successful (system now virtually error – free) → First evidence of viability of the Digital Hadron Calorimeter approach → Validation of technical implementation (chambers and electronic readout) → Results being analyzed and published → System very stable over period of 9 months 1 m 3 prototype section necessary to (extrapolation by x200) → Provide detailed measurements of hadronic showers with RPCs → Validate hadron shower models → Gain further operational experience Readiness for construction → Larger RPCs (having been designed and constructed) now under test → Small modifications to DCAL chip still necessary (no prototyping required) → Second (and cheaper) iteration of Pad- and FE-boards being tested → Concept of merging of FE-board and Data concentrator being developed Currently → Received partial funding; decide on path to take

SID RAL meeting; April 2008 H.Weerts THE END

SID RAL meeting; April 2008 H.Weerts Data with 6 layers Monte Carlo simulation with 6 layers Monte Carlo simulation with infinite depth Our little calorimeter stack works as a calorimeter Energy response and resolution for positron

SID RAL meeting; April 2008 H.Weerts Shower longitudinal profiles Shower maximum contained in 6 layers Significant energy leakage (at higher energies) Fit to empirical formula with the shower maximuma at t max = (a-1)/b Linear increase with log 10 (E) as expected

SID RAL meeting; April 2008 H.Weerts Linearity – Resolution N = · E 0.44 (for positrons) N = · E 0.46 Reasonably stable Brick run data shown at p = 0 (essentially all muons) MIP-like events Showering events

SID RAL meeting; April 2008 H.Weerts Pion runs – Average shower shape – Pion selection Effect of cut on nhit>4 clearly visible for p ≤ 8 Statistics too poor for p ≤ 4 → needs to be simulated (showering events)

SID RAL meeting; April 2008 H.Weerts Data Error summary  All data/system errors were thoroughly studied  An event reconstruction program was developed to build events correctly out of data with errors u Used to re-run all test beam data u Identify events with know data errors  Known data errors: (~15 different errors) Fatal Errors (bit definition): original data can not be recovered bit 0: x beginning of run (BOR) events (or junk data at the beginning of a run) bit 1: x end of run event (due to DAQ program, last event of a run may have lost data packages) bit 2: x additional junk byte(s) (DCON error bits 1, 2, out of bound time stamp, non-matching time stamp) bit 3: x fake trigger (only a few DCON shows up, with or without hit pattern) bit 4: x "0" data + leading bit error bit 5: x check sum error + reserved bit set bit 6: x "0" time stamp (but other bytes are non-zero) bit 7: x wrong time stamp (in DCON or in individual chips, wrong T > correct T) bit 8: x trigger bit error (trigger bit bit[14][7] = 1, but hit patter != all 1's) (always have check sum error as well) Non-fatal Errors (bit definition): original data can be recovered bit 0: - wrong time stamp (in DCON or in individual chips, wrong T must be < correct T) bit 1: x missing (a few) DCON in trigger timestamps bit 2: x duplicate 16-byte data package bit 3: x late trigger package (after some data package appeared, or even appears in the next event) bit 4: x late data package (appeared in the next event) Other: (mostly in charge injection runs) fake counter reset

SID RAL meeting; April 2008 H.Weerts FEB & Data Concentrator – More Current Thinking  Going a step further: Make FEB & Data Concentrator Monolithic...

SID RAL meeting; April 2008 H.Weerts Vertical Slice Electronics Construction Pad Board RPC FEB Board RPC & Pad Bd Completed Assembly Side View Assembled & Tested Beforehand Use conductive epoxy to glue together

SID RAL meeting; April 2008 H.Weerts Large RPC production: frame extrusion  VST chamber frames are all machined u Very time consuming and labor intensive (costly) u Critical dimension can be controlled to ~ 10% accuracy  1m 3 chamber frames will be extruded u Once setup, production is very cheap u Very good uniformity over long distance u Only need small amount of machining to cut into length/shape  1 st prototype run: ~3 weeks ago u Critical dimension controlled to ~5% accuracy over several meters u One non-critical dimension was off by over 10% u Sample used to produce the 1 st full size RPC for 1m 3  2 nd prototype run: last week u All dimensions agree with spec u Will go for production (miles of them)

SID RAL meeting; April 2008 H.Weerts FEB & Data Concentrator – Work in Progress  New Data Concentrators – One services 24 chips u Idea: Column Architecture DCAL ASICs RPC Data Concentrator Serial Lines Data, Control, Trigger