PRESENTATION ON REACTIVE POWER CONTROL S.K.SOONEEGM,SRLDCBANGALORE.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Questions about AVR & PSS
1 POWER QUALITY -- Bhanu Bhushan -- June, How close is the supply voltage waveform to sinusoidal, and how close are the supply voltage and frequency.
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
Sistan & Balouchestan Electric Power Distribution Company
ENERGY CONVERSION ONE (Course 25741) CHAPTER SIX ……SYNCHRONOUS MOTORS.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Reactive Power and Voltage Control
1 DISTRIBUTION SERVICE PROVIDER BLACK START TRAINING 2015.
Today’s Topics 1- The per unit system 2-Transformer Voltage Regulation
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Power Factor Correction Most domestic loads (such as washing machines, air conditioners, and refrigerator) and industrial loads (such as induction motors)
Presentation to WECC TSS May 8, 2015
Power Engineering Society Chicago Chapter Reactive Power: Sources and Solutions 12 February 2003 David E. Mertz, PE Burns & McDonnell Engineers, Inc.
1 Voltage Collapse Animation (AC) Created by Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Bryan Underwood Advisor: Prof. Gutschlag Alternating Current Power Factor Monitoring and Correction.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
LOGO LINEAR CIRCUIT ANALYSISSAJID HUSSAIN QAZI MEHRAN U.E.T, KHAIRPUR CAMPUS A.C POWERS AND POWER FACTOR.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Circuits II EE221 Unit 4 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
ET2105 Electrical Power System Essentials
Flexible AC Transmission System Overview
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Sustainable Energy Systems Engineering Peter Gevorkian Ch 4: Energy Conservation Brevard Community College ETP1401 Bruce Hesher.
POWER FACTOR CORRECTION
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
“Reactive Power Management and Voltage Stability” Sharma Kolluri, IEEE Fellow Manager of Transmission Planning Entergy Services Inc Presentation at 2012.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
American Electric Power Service Corporation Jan 26, Coordinating Controls across CREZ  What dials are available to the operators?  What are the.
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
Connections of a CT and a PT to supply, load and relay.
Chapter 7 AC Power Analysis
Circuits II EE221 Unit 11 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
Lecture 32Electro Mechanical System1 Synchronous Reactance  The value of X S can be determined by measurements of the open-circuit and short-circuit tests.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
Power Factor Improvement Lecture 9. Normally, the power factor of the whole load on a large generating station is in the region of 0·8 to 0·9. However,
Chapter 17 Power in AC Circuits.
1 ELECTRICAL TECHNOLOGY EET 103/4  Define and explain sine wave, frequency, amplitude, phase angle, complex number  Define, analyze and calculate impedance,
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Unit 3 REACTIVE POWER AND VOLTAGE CONTROL.  BASIC REQUIREMENTS OF EXCITATION CNTRL  Excitation Current up to 10’000 amps  Input frequency range from.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
-- Bhanu Bhushan -- < > (August, 2011)
AC POWER ANALYSIS. 2 Content Average Power Maximum Average Power Transfer Complex Power Power Factor Correction.
UNIT-VII Static Series Compensators
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
Restoration Concepts PEAK RC Training Classification: Confidential Version No.: 1.5 Date of Document: Document Owner/Author: B Pederson Classification:
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
Agenda TSOG 8th November
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
SIMULATION AND IMPLEMENTATION OF FC-TCR
IG BASED WINDFARMS USING STATCOM
Reactive Power Task Force
SWAMI VIVEKANAND COLLEGE OF ENGINEERING,INDORE(M.P)
Reactive Power and Voltage Control
Introduction To Reactive Power
POWER SYSTEM ANALYSIS INTRODUCTION.
Presentation transcript:

PRESENTATION ON REACTIVE POWER CONTROL S.K.SOONEEGM,SRLDCBANGALORE

POWER IS PLEASURE---ASK THOSE WHO ARE SEEKING IT POWER IS PLEASURE---ASK THOSE WHO ARE SEEKING IT POWER IS PAIN ---ASK THOSE WHO HAVE IT POWER IS PAIN ---ASK THOSE WHO HAVE IT REAL POWER IS PAIN IMAGINARY POWER PLEASURE REAL POWER IS PAIN IMAGINARY POWER PLEASURE

SOURCES OF REACTIVE POWER SYNCHRONOUS GENERATORS SYNCHRONOUS GENERATORS SYNCHRONOUS CONDENSORS SYNCHRONOUS CONDENSORS SHUNT CAPACITORS SHUNT CAPACITORS STATIC THYRISTOR BASED DEVICES STATIC THYRISTOR BASED DEVICES TRANSMISSION LINES TRANSMISSION LINES

REACTIVE POWER SINKS LOADS LOADS INDUCTION MOTORS(PUMPS,FANS ETC) INDUCTION MOTORS(PUMPS,FANS ETC) INDUCTIVE LOADS (CHOKES ETC) INDUCTIVE LOADS (CHOKES ETC) TRANSFORMERS TRANSFORMERS TRANSMISSION LINES TRANSMISSION LINES REACTORS REACTORS STATIC THYRISTOR BASED DEVICES STATIC THYRISTOR BASED DEVICES SHYNCHRONOUS MACHINES SHYNCHRONOUS MACHINES

SYNCHRONOUS MACHINES

SYNCHRONOUS MACHINE MODES OF OPERATION UNDER-EXCITED OR LEADING PF UNDER-EXCITED OR LEADING PF CONSUMES REACTIVE POWER CONSUMES REACTIVE POWER OVER-EXCITED OR LAGGING PF OVER-EXCITED OR LAGGING PF PRODUCES REACTIVE POWER PRODUCES REACTIVE POWER

SYNCHRONOUS GENERATORS VECTOR DIAGRAM E I θ δ V jIX d I θ δ V E OVER-EXCITED UNDER-EXCITED

CAPABILITY CURVE U 2 =P 2 +Q 2 LEAD LAG MOTORINGGENERATING Q=MVAR, REACTIVE POWER P=MW, ACTIVE POWER

LIMITATIONS LAG/OVER EXCITED(+) LEAD/UNDER EXCITED(+)

TRANSMISSION LINES

TRANSMISSION LINES SIL SURGE IMPEDANCE LOADING:-The SIL is the loading level where the reactive VARs generated by the line capacitance equal the VARs required by the line inductance. SURGE IMPEDANCE LOADING:-The SIL is the loading level where the reactive VARs generated by the line capacitance equal the VARs required by the line inductance. QUICK FACT: QUICK FACT: 100 KM OF 400 KV LINE(MOOSE) CAUSES 55 MVAR OF CHARGING CURRENT 100 KM OF 400 KV LINE(MOOSE) CAUSES 55 MVAR OF CHARGING CURRENT

OVERVOLTAGE PROBLEMS Generator self-excitation Generator self-excitation Insulation breakdown Insulation breakdown Flashover Flashover Customer equipment damage Customer equipment damage Excessive heating of overexcited transformers Excessive heating of overexcited transformers

UNDERVOLTAGE CAUSES Heavy line loading Heavy line loading Disturbances Disturbances High customer demand High customer demand Induction motor heating Induction motor heating Dim lights - more lights Dim lights - more lights Less heat - more heaters Less heat - more heaters Voltage collapse Voltage collapse

SOME FACTS A 10 percent voltage drop cuts light output by 30 percent. A 10 percent voltage drop cuts light output by 30 percent. A 10 percent voltage drop cuts heat output by 20 percent. The user response, in many such cases, is to turn on more lights A 10 percent voltage drop cuts heat output by 20 percent. The user response, in many such cases, is to turn on more lights

TO CORRECT LOW VOLTAGE Remove shunt Reactors Remove shunt Reactors Insert shunt capacitors Insert shunt capacitors Energize open lines Energize open lines Raise LTC set points Raise LTC set points Raise voltage regulator set points Raise voltage regulator set points Use generator reactive overload capability Use generator reactive overload capability Curtail interruptible loads Curtail interruptible loads Shed firm load Shed firm load

TO CORRECT HIGH VOLTAGE Remove shunt capacitors Remove shunt capacitors Insert shunt reactors Insert shunt reactors Lower voltage set points Lower voltage set points Close open-ended lines or remove from service altogether Close open-ended lines or remove from service altogether Buck with generators Buck with generators Remove transmission lines from service Remove transmission lines from service

POINTS TO REMEMBER VAR control is the key to voltage control VAR control is the key to voltage control Use voltage control equipment early Use voltage control equipment early Avoid voltage collapse/High Voltage by smart operating Avoid voltage collapse/High Voltage by smart operating

Permissible Voltage Limits Voltage Under Normal Condition Max permissible Voltage at the far end of lines normally kept energized from one end Nominal (kV) MaxMin kV /

REQUIREMENTS & METHODS

LOAD ANGLE ITS IMPLICATION IN POWER SYSTEM OPERATION

LOAD ANGLE

VOLTAGE vs FREQUENCY

Frequency and Voltage “The general synchronous machine equations show that voltage levels are directly proportional to the frequency and for godd voltage control extremes of system frequency are to be avoided” “The general synchronous machine equations show that voltage levels are directly proportional to the frequency and for godd voltage control extremes of system frequency are to be avoided” ………Excerpts from Chapter on Reactive Power and Voltage control. System operators Manual L

Impact of freq on Voltage E=4.44фfN Where E is the EMF Generated,f is the Frequency, ф the flux

Transmission Planning criteria 1. P=P 0 (F/F 0 ) 2. Q=Q 0 (V/V 0 ) 2

IEEE MODEL: COMPOSITE LOADS P(V,F)=(A 1 V n1 F m1 +A 2 V n2 f m2 +A 3 V n3 F m3 )P 0 Q(V,F)=(A 4 V n4 F m4 +A 5 V n5 F m5 +A 6 V n6 F m6 )Q 0 CO-EFFICIENTS A1 TO A6 ARE ASSOCIATED WITH LOAD CATEGORIES A 1 +A 2 +A 3 =1 A 4 +A 5 +A 6 =1

LOAD REPRESENTATION TYPE OF LOAD PF∆P/∆V(%)∆P/∆F(%)∆Q/∆V(%)∆Q/∆F(%) INCANDESENT LAMP FLOURESCENT LAMP AIR CONDITIONER WINDOW TYPE REFRIGERATOR HOME APPLIANCE WITH MOTOR HP INDUCTION MOTOR LARGE US TOWN ALUMINIUM PLANT AGRICULTURAL IN WINTER(US) 0.8

TRANSFORMERS AND TAP CHANGING

ICT TAPS 400 KV SIDE 220 KV SIDETAP NO 17=360/220 TAP NO 1=440/220 VV ON LOAD TAP CHANGER 1.25% OR 5 KV PER TAP±10% RANGE NOMINAL TAP AT 9

ICT TAP CHANGING EXAMPLE 400 KV 210 KVTAP NO 17=360/220 TAP NO 1=440/220 VV BASE CONDITION MW 50 MVAR

ICT TAP CHANGING EXAMPLE 408 KV 208 KVTAP NO 17=360/220 TAP NO 1=440/220 VV TAP IS MOVED FROM 9 TO 3 SAY MVAR FLOW AND RESULTANT VOLTAGES ARE DEPENDANT ON GRID AND STRENGTH OF BUS 3100 MW 10 MVAR

TAP CHANGING REARRANGES MVAR FLOW REARRANGES MVAR FLOW TO BE DONE CONSIDERING VOLTAGES ON BOTH SIDES TO BE DONE CONSIDERING VOLTAGES ON BOTH SIDES CO-ORDINATED ACROSS THE SYSTEM CO-ORDINATED ACROSS THE SYSTEM TAP CHANGING SCHEDULES TAP CHANGING SCHEDULES

GT TAP CHANGING ~ INFINITE BUS400 KV 21 KV TAP MW 30 MVAR BASE CASE ~ INFINITE BUS 400 KV 21.3 KV TAP MW 5 MVAR TAP CHANGED

REACTIVE LOAD STRATA LEADING LAGGING LOAD TRANSFORMERS LOADED LINES REACTORS CAPACITORS LIGHTLY LOADED LINES DURATION LOAD SHEDDING BASE LOAD MET BY 1.CAPACITORS 2.GENERATORS /LINES BELOW SIL SUPPLYING VAR REACTORS REMOVAL 1.SWITCH OFF CAPACITORS 2.GENERATORS ABSORBING VARS 3.SWITCH OFF LIGHTLY LOADED LINES 4.TAP STAGGERING

VOLTAGE CONTROL WHAT THE IEGC SAYS……..

IEGC SECTION Reactive Power Compensation 4.9Reactive Power Compensation (a)Reactive Power compensation and/or other facilities, should be provided by SEBs/STUs or distributing agencies as far as possible in the low voltage systems close to the load points thereby avoiding the need for exchange of Reactive Power to/from ISTS and to maintain ISTS voltage within the specified range. (a)Reactive Power compensation and/or other facilities, should be provided by SEBs/STUs or distributing agencies as far as possible in the low voltage systems close to the load points thereby avoiding the need for exchange of Reactive Power to/from ISTS and to maintain ISTS voltage within the specified range.

IEGC SECTION (J)All generating units shall normally have their automatic voltage regulators (AVRs) in operation, with appropriate settings. In particular, if a generating unit of over fifty (50) MW (10 MW in case of North-Eastern region) size is required to be operated without its AVR in service, the RLDC shall be immediately intimated about the reason and duration, and its permission obtained. Power System Stabilisers (PSS) in AVRs of generating units (wherever provided), shall be properly tuned as per a plan prepared for the purpose by the CTU from time to time. CTU will be allowed to carry out tuning/checking of PSS wherever considered necessary. 6.9 (J)All generating units shall normally have their automatic voltage regulators (AVRs) in operation, with appropriate settings. In particular, if a generating unit of over fifty (50) MW (10 MW in case of North-Eastern region) size is required to be operated without its AVR in service, the RLDC shall be immediately intimated about the reason and duration, and its permission obtained. Power System Stabilisers (PSS) in AVRs of generating units (wherever provided), shall be properly tuned as per a plan prepared for the purpose by the CTU from time to time. CTU will be allowed to carry out tuning/checking of PSS wherever considered necessary.

IEGC SECTION 6.9 (q)All regional constituents shall make all possible efforts to ensure that the grid voltage always remains within the following operating range. (q)All regional constituents shall make all possible efforts to ensure that the grid voltage always remains within the following operating range.NOMINALMAXIMUMMINIMUM

IEGC SECTION Demand Control 6.4Demand Control 6.4.1Introduction: 6.4.1Introduction: This section is concerned with the provisions to be made by SLDC's to permit the reduction of demand in the event of insufficient generating capacity, and transfers from external interconnections being not available to meet demand, or in the event of breakdown or operating problems (such as frequency, voltage levels or thermal overloads) on any part of the grid. This section is concerned with the provisions to be made by SLDC's to permit the reduction of demand in the event of insufficient generating capacity, and transfers from external interconnections being not available to meet demand, or in the event of breakdown or operating problems (such as frequency, voltage levels or thermal overloads) on any part of the grid.

IEGC SECTION Recovery Procedures 6.8Recovery Procedures d)The RLDC is authorised during the restoration process following a black out, to operate with reduced security standards for voltage and frequency as necessary in order to achieve the fastest possible recovery of the grid. d)The RLDC is authorised during the restoration process following a black out, to operate with reduced security standards for voltage and frequency as necessary in order to achieve the fastest possible recovery of the grid.

IEGC SECTION Reactive Power and Voltage Control: 7.6Reactive Power and Voltage Control: 1.The Beneficiaries are expected to provide local VAR compensation/generation such that they do not draw VARs from the EHV grid. However, considering the present limitations, this is not being insisted upon. Instead, VAR drawals by Beneficiaries (except on their lines emanating from ISGS) are to be priced as follows:- -The Beneficiary pays for VAR drawal when voltage at the metering point is below 97%. -The Beneficiary gets paid for VAR return when voltage is below 97%. -The Beneficiary gets paid for VAR drawal when voltage is above 103%. -The Beneficiary pays for VAR return when voltage is above 103%. 2.The charge/payment for VARs, shall be at a nominal paise/kVARh rate as may be approved by CERC from time to time, and will be between the beneficiary and the Pool Account (for VAR interchanges with ISTS), and between two beneficiaries (for VAR interchanges on ties between their systems). 3.Notwithstanding the above, RLDC may direct a beneficiary to curtail its VAR drawal/injection in case the security of grid or safety of any equipment is endangered.

IEGC SECTION 7.6 CONTD… In general, the Beneficiaries shall endeavour to minimise the VAR drawal at an interchange point when the voltage at that point is below 95% of rated, and shall not return VARs when the voltage is above 105%. ICT taps at the respective drawals points may be changed to control the VAR interchange as per a beneficiary's request to the RLDC, but only at reasonable intervals In general, the Beneficiaries shall endeavour to minimise the VAR drawal at an interchange point when the voltage at that point is below 95% of rated, and shall not return VARs when the voltage is above 105%. ICT taps at the respective drawals points may be changed to control the VAR interchange as per a beneficiary's request to the RLDC, but only at reasonable intervals. 5.Switching in/out of all 400 KV bus and line Reactors throughout the grid shall be carried out as per instructions of RLDC. Tap changing on all 400/220 KV ICTs shall also be done as per RLDC's instructions only. 5.Switching in/out of all 400 KV bus and line Reactors throughout the grid shall be carried out as per instructions of RLDC. Tap changing on all 400/220 KV ICTs shall also be done as per RLDC's instructions only. 6.The ISGS shall generate/absorb reactive power as per instructions of RLDC, within capability limits of the respective generating units, that is without sacrificing on the active generation required at that time. No payments shall be made to the generating companies for such VAR generation/absorption. 6.The ISGS shall generate/absorb reactive power as per instructions of RLDC, within capability limits of the respective generating units, that is without sacrificing on the active generation required at that time. No payments shall be made to the generating companies for such VAR generation/absorption.

VA Metering VA METERING VA METERING ACCURACY CLASS ACCURACY CLASS DIFFICULTY IN CALIBRATION AND CHECKING DIFFICULTY IN CALIBRATION AND CHECKING DIFFICULTY IN MEASURING BAD POWER FACTOR DIFFICULTY IN MEASURING BAD POWER FACTOR