Beckie Curtis, Michigan DOT Virtis/Opis Issue Process.

Slides:



Advertisements
Similar presentations
Competency Checklist Version 5. CREATING A CHECKLIST Authoring View.
Advertisements

SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Indistar: Updates, Additions, and Coming Soon Stephanie Benedict, ADI.
I-Suite Update Version 13 I-Suite General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple.
TRACER and NGT Estimation Kyle Knudson, TRACER Product Manager Teresa Franklin, Trnsport Product Manager October 25, 2006 Earth Tech & Info Tech Collaboration.
Public – Final phenotypes algorithms and implementation results: Work that has been tested, validated, implemented, and ready to be shared with the public.
4.09 Upgrade December 2011 Student Systems and Business Support (SSABS) Information and Training Session.
New Proposal Review Form Revised 09/10/2008 Office of Sponsored Projects (512)
DataMine 2.0 Role: Lead State/Test Facility AASHTO’s NTPEP Program presents: NTPEP DataMine 2.0 NTPEP DataMine 2.0.
Chapter 6: Design of Expert Systems
DataMine 2.0 Role: Manufacturer AASHTO’s NTPEP Program presents: NTPEP DataMine 2.0 NTPEP DataMine 2.0.
PowerPoint Presentation for Dennis, Wixom & Tegarden Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Rich Hypermedia for NB Requirements and Release Process Version 3.3 CSEM Consulting ICS 225 – Spring 2002.
Agenda 22 7.SharePoint Changes 8.Items & Lists 9.Files & Libraries 10.SharePoint & Office 11.Help 12.Wrap Up.
New Features in Release 4.3 (May 16, 2005). Release 4.3 New Features Navigation enhancements Punch-out supplier availability notifications The ability.
ITIL Problem Management Tool Guide Gerald M. Guglielmo ITIL Problem Manager CD-doc
ITIL Process Management An Overview of Service Management Processes Presented by Jerree Catlin, Sue Silkey & Thelma Simons.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) November 6, 2005.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager November 6, 2005 A Primer for Trnsport Users.
Agenda Overview 2.What is SharePoint? 3.NCDOT Websites 4.Roles 5.Search 6.SharePoint Interface.
CCSB223/SAD/CHAPTER141 Chapter 14 Implementing and Maintaining the System.
ETID Electronic Turn-in Document
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
Jack Malloch Product Service Advisor Global Support Services.
Trns port Modification Reports Process Presented at the Trnsport User Group Conference Burlington VT by Shirley Daugherty NE DOR Chair, Trnsport Task Force.

ITIL Process Management An Overview of Service Management Processes Thanks to Jerree Catlin, Sue Silkey & Thelma Simons University of Kansas.
Company Confidential Info Exchange Workflow Examples for External Users: Submittals Company Confidential.
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
Course # PEMS Version 2.0 Upgrades. Unit 8 PEMS Version 2.0 Upgrades Several improvements to PEMS application  Improvements based on: - Change.
© 2011 IBM Corporation Request For Enhancement Welcome to the RFE Community Site! Markus Standau, IBM October 2011.
Obtaining Help for Pharmacy Issues. Sign up for the Pharmacy ListServ Send a message to DO NOT add.
Obtaining Help for Pharmacy Issues and Submitting Enhancements 1.
AASHTOWare BRIDGEWare Satisfaction Survey Results FY 2010 Wendy L. Gagnier, P.E. BRIDGEWare Project Manager.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
EduBrite Training for Group Admins. Dashboard Reports Groups Enrolled courses More items under this menu.
What’s New in WatchGuard XCS v9.1 Update 1. WatchGuard XCS v9.1 Update 1  Enhancements that improve ease of use New Dashboard items  Mail Summary >
1 Creating an RTC Hot Fix September 18, Steps for creating a hot fix Find the work item where the defect is resolved. Check for existing hot fixes.
QUALITY ASSURANCE PRACTICES. Quality Plan Prepared and approved at the beginning of project Soft filing system approach followed. Filing location – –
TEAM Enhancements 2003 Project Work Plan. Application Enhancements Ten application enhancements were selected as the most critical for completion in FY.
Roles 1. Your Role: End User End Users use Inside NCDOT and Connect NCDOT for basic browsing and reading Typical tasks can include: Open or download files.
Agenda 1. Key Activities, Accomplishments and Status 2. Task Review 3. Meeting Notes and Action Items.
SEEK & JERM Progress Stuart Owen December Alphabetical pagination Requested by several users. Will also be applied to Sops, Models & Data – (needs.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
Outstanding Issues with Reporting and Data Submissions.
Project Management Brad Adamczyk What is it for? Tracks job progress outside of financials (Communication, documents, and progress) Unifies Job Information.
Incident Management A disruption in normal or standard business operation that affects the quality of service Goal: restore normal service as quickly as.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
National Oceanic and Atmospheric Administration User Group Presentation – Major Release 2.0 Part II November 9, 2005.
Transportation Agenda 19. Transportation Your Role: Designer Designers organize SharePoint content and determine how to display that content Typical tasks.
Zscaler Support Best Practices Guide Version September 27, 2016.
IT Infrastructure Library (ITIL) For You -With Max Mart The ManageEngine Guy!!
Introduction to CAST Technical Support
Helping Yourself in PD2 SPS Spotlight Series July 2015.
Wholesale Market Reform
IT Service Operation - purpose, function and processes
AgilizTech Support Desk Overview
Chapter 6: Design of Expert Systems
Maintaining software solutions
My Oracle Support (The next generation Metalink experience) lynn
E-NOTIFY and CAER OnLine Training
CSDR Submit-Review Website Submitter Guide
Introduction to CAST Technical Support
Health Ingenuity Exchange - HingX
LO4 - Be Able to Update Websites to Meet Business Needs
ETS – Air Data submission Training
Project Name - Testing Iteration 1 UAT Kick-off
Chapter 2: Building a System
Building a “System” Moving from writing a program to building a system. What’s the difference?! Complexity, size, complexity, size complexity Breadth.
Presentation transcript:

Beckie Curtis, Michigan DOT Virtis/Opis Issue Process

Current Bug Status Support Center Issue Definitions Issue Action Plan Technical Support Site

Current Bug Status

Support Center The V/O Technical Support Site has multiple links Issues with the program should be reported on the support center Login/password is virtis2/opis2

Support Center

When an issue is reported, it will be set to “ UNKNOWN ” The contractor will review the issue and classify

Issue Definitions Urgent Bug A program issue that prevents users from performing critical business functions The Task Force and Tag will confirm the status of the bug as “ Urgent ”

Issue Definitions Critical Bug A program issue that provides incorrect final results without giving a warning to the user

Issue Definitions High Priority Bug A program issue that provides incorrect final results or prevents portions of the program from functioning but the user is alerted to the error

Issue Definitions Low Priority Bug A program issue that causes minor inconvenience to business process but there is a known work around available

Issue Definitions Maintenance Item A program issue that is not handled appropriately (as determined by the Task Force and TAG) or does not follow the AASHTO code for a program function that was intended to be included in the program This item was not included in the original work plan, but should be resolved

Issue Definitions Support Item A program issue that is resolved by providing information to the user

Issue Definitions Enhancement Item A program issue that would require changing the capabilities of the program in order to add additional program function or to improve usability but is not part of the current expected capabilities

Issue Action Plan Urgent Bug All users will be notified through when the bug is found An emergency fix will be designed All licensees will be notified through that the patch is available

Issue Action Plan Critical Bug All users will be notified through when the bug is found The fix will be included in the next release

Issue Action Plan High and Low Priority Bugs The original submitter will be notified that the issue was classified as a high or low priority bug He/she will be notified as to the release of the fix and be invited to serve on the TAG for testing the fix

Issue Action Plan Maintenance Item The original submitter will be notified of the classification He/she will be notified as to the release it will be included and be invited to serve on the TAG for testing

Issue Action Plan Support Item The original submitter will be notified of the classification and provided the information

Issue Action Plan Enhancement Item The original submitter will be notified of the classification Once a price range is identified (small, medium, large) the original submitter will be notified

Technical Support Site

Critical Bug Tab Urgent & Critical Bugs Technical Notes and workarounds Kept for one additional version after the fix is implemented

Technical Support Site Other improvements under consideration /in progress General Bugs sorted by the categories the TAG sorts enhancements Education Tab includes responses to common support requests Archive Tab to include bug fixes more than 1 version old

Questions?