Eric Prebys LARP Program Director 7/13/09.  Background  Summary of findings from last review  Partial response  Coordination with CERN  New initiatives.

Slides:



Advertisements
Similar presentations
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Advertisements

LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
Eric Prebys LARP Program Director 1/8/09.  This meeting will be both and update and an official response to the review of LARP which took place at LBNL.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Eric Prebys LARP Program Director 1/8/09.  Background  Summary of review findings  Partial response  Coordination with CERN  New initiatives  Lumi.
Eric Prebys LARP Program Director Jaunary 14, 2009.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Eric Prebys Fermilab APC Program Director, LARP April 15, 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
F Project X Overview Dave McGinnis October 12, 2007.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Eric Prebys LARP Program Director 4/8/09.  All meetings will take place in Chardonnay room (partitioned for parallel sessions).  Wireless available.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
Eric Prebys 10/28/2008.  Generally, I thought this was a productive meeting  Lots of useful discussion  Would still rather have all plenary More specifically.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) March 15, 2011.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
Eric Prebys, Fermilab Director, LARP October 29, 2010 *plus a bit of LAFS.
PAC Meeting, December 12, Prebys 1 The Problem.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Eric Prebys LARP Program Director 7/13/09.  Background  Progress and Highlights in 2010  Summary of findings from last review  Chamonix  New schedule.
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
US LHC Accelerator Research Program (LARP)
LHC Status, Upgrade Path, and US Contributions
LHC Status, Upgrade Path, and US Contributions
Presentation transcript:

Eric Prebys LARP Program Director 7/13/09

 Background  Summary of findings from last review  Partial response  Coordination with CERN  New initiatives  Lumi situation  FY09 Budget  Budgeting process  Budget status  Progress and Highlights  Accelerator Systems  Magnet Systems  Programmatic Activities  Future planning and this Review 7/13/09 2 E. Prebys, DOE Review, FNAL

 Since last review  LARP is under new management (Peggs->Prebys 8/1/08)  The LHC has started…sort of  New reviewers since last time: Peter McIntyre, Texas A&M George Biallas, JLAB (was on committee in 2006) David Rice, Cornell 7/13/09 E. Prebys, DOE Review, FNAL 3

 Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to CMS or ATLAS)  Originally FNAL, BNL, and LBNL  SLAC joined shortly thereafter  Some work (AC Dipole) supported at UT Austin  LARP Goals  Advance International Cooperation in High Energy Accelerators  Advance High Energy Physics By helping the LHC integrate luminosity as quickly as possible  Advance U.S. Accelerator Science and Technology  LARP includes projects related to initial operation, but a significant part of the program concerns the LHC upgrades 7/13/09 4 E. Prebys, DOE Review, FNAL

 Accelerator Systems  Accelerator physics  Instrumentation Lumi monitor Schottky Tune tracker AC Dipole  Other hardeware Collimation Crab cavities?  Magnet Systems  Goal: demonstrate Nb 3 Sn as a viable technology for the ultimate upgrade of the LHC  ~half the program  Programmatic Activities  Program management, travel, meetings, etc  Toohig Fellowship  Long Term Visitor (LTV) program 7/13/09 5 E. Prebys, DOE Review, FNAL

 Initial operation  Ramp up to 1x10 34 cm -2 s -1  Collimation  See next slide  Phase I upgrade  After ~2 years of operation (~2013)  Replace 70 mm triplet quads with 120 mm quads Includes APUL projects (superconducting separation dipoles, feedboxes, etc)   * goes from 50->25 cm  Luminosity goes to 2.5x10 34 cm -2 s -1  Phase II Collimation upgrade  Upgrade with a series of cryo-collimators and advanced secondary collimators that will handle the ultimate LHC luminosity.  Phase II upgrade  Second half of next decade (nominally 2020)  Luminosity goal: 1x10 35  Details still under study New technology for larger aperture quads (Nb 3 Sn) crab cavities? Improved injector chain (PS2 + SPL) 7/13/09 6 E. Prebys, DOE Review, FNAL

PSB SPL’ RCPSB SPS SPS+ Linac4 SPL PS LHC DLHC Output energy 160 MeV 1.4 GeV ~ 5 GeV 26 GeV 40 – 60 GeV 450 GeV 1 TeV 7 TeV ~ 14 TeV Linac2 50 MeV Proton flux / Beam power PS2 (PS2+) Linac4: PSB injector (160 MeV) SPL: Superconducting Proton Linac (~ 5 GeV) SPL’: RCPSB injector (0.16 to GeV) RCPSB: Rapid Cycling PSB (0.4-1 to ~ 5 GeV) PS2: High Energy PS (~ 5 to 50 GeV – 0.3 Hz) PS2+: Superconducting PS (~ 5 to 50 GeV – 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) DLHC: “Double energy” LHC (1 to ~14 TeV) M. Benedikt, R. Garoby, CERN DG 7/13/09 7 E. Prebys, DOE Review, FNAL

7/13/09 8 E. Prebys, DOE Review, FNAL

7/13/09 E. Prebys, DOE Review, FNAL 9 Collimation Schedule approximate

 Generally impressed with LARP progress on technical fronts.  Particularly success of Schottky and tune tracker  As usual, reminded us that the Nb 3 Sn magnet program is a world class effort which must be sufficiently supported.  Some concern over convergence of the shell and collar efforts.  Some specific comments on conductor choice.  Concern over communication with CERN  Particularly regarding the JIRS work  Concern about managerial oversight  Primarily regarding the lumi project, which was news at the time.  Although there was some frustration during the review about how LAUC (now “APUL”) was “thrown at them”, they generally felt it was a good idea and should be separately and sufficiently funded.  APUL will NOT be discussed in any detail at this review 7/13/09 10 E. Prebys, DOE Review, FNAL * full report: LARP-DOC-897 (

 The bulk of the criticism in the report focused on the perceived “disconnect” between LARP and CERN regarding prioritization of LARP activities.  I believe this disconnect largely referred to activities related to the abortive attempt to get Nb 3 Sn magnets into the Phase I proposal (specifically, the JIRS group).  It's now realized this is not (and likely never was) realistic. We have suspended activities of the JIRS group, with the idea of restructuring it with an emphasis on the relationship between our magnet program and the phase II upgrade. 7/13/09 11 E. Prebys, DOE Review, FNAL

 General  LARP Liaison: Oliver Bruening Serves as primary “sounding board” for LARP proposals De-facto veto power over LARP projects (No CERN interest= non-starter)  US/CERN meeting Once a year (~January) Discuss general priorities and strategy Should we do this more often?  LTV/Toohig fellows Establish a significant body of “man on the street” impressions of CERN interest Both programs considered a great success.  We have also begun a set of meetings to coordinate our magnet program with the CERN decision/production process for the Stage II upgrade (more in a moment). 7/13/09 12 E. Prebys, DOE Review, FNAL

 Specific  Alex Ratti has been working closely with Enrico Bravin (responsible for LHC luminosity measurement) on the completion and handoff of the lumi monitor  Rama Calaga is working closely with CERN people to coordinate crab cavity effort  Tom Markiewicz is working closely with Ralph Assmann (head of LHC collimation) on the potential use of the rotatable collimators  Uli Wienands has been working with Michael Benedikt and CERN in general to identify the best ways for LARP to contribute to the PS2 effort. 7/13/09 13 E. Prebys, DOE Review, FNAL

 In response to comments from the review committee and LARP members, Tom Markiewicz developed a more formal and transparent process for choosing amongst new initiatives.  Proposals were weighted by a number of factors, including CERN interest (necessary), potential luminosity improvement, technical risk, and cost.  LARP collaboration was ed a prioritized list of approved activities along with an explanation of the procedure.  Improvements for the future  Have stressed that all projects new and ongoing present a multi-year profile  Largely moot point this year  Already badly overcommitted  Exceptions Activities within PS2 treated much like “new initiatives” Considering redirecting electron lens effort from beam-beam compensation (little interest at CERN) to developing electron lenses as primary collimators (lots of interest at CERN). 7/13/09 14 E. Prebys, DOE Review, FNAL

 The magnet program is central to LARP  It’s realized that a “prototype” is beyond the scope of LARP, but the program should aim to demonstrate the technology at a level that CERN would authorize a construction program  Either in the US or Europe  Almost certainly with some R&D component at the beginning  Range of scenarios (my view):  Failure: the LHC does not adopt Nb 3 Sn for the Phase II upgrade Unlikely. What else is there?  Complete success: the LHC adopts a design very similar to the LARP models. Most likely the key and bladder “shell design”  Partial (mostly) success: the LHC adopts Nb 3 Sn, but based on a different design LARP has still contributed significantly to the overall program.  We have begun a dialog with CERN representatives to make sure we are on the same page with our plans  First meeting at CERN 5/20/09: Peter Wanderer, Lucio Rossi, Edzio Todesco, Guis De Rijk, me (by phone)  Generally approve of our plan, but still some trepidation about shell approach (more from Peter W.) 7/13/09 E. Prebys, DOE Review, FNAL 15

 In spite of some missteps, LARP activities are closely coordinated with CERN.  CERN interest is a necessary condition for any LARP project.  As you will see, LARP is resource limited:  In the absence of an unexpected funding windfall, there are more activities of interest to both LARP and CERN than we can possibly undertake.  We anticipate new opportunities to arise once LHC operation starts in earnest. 7/13/09 16 E. Prebys, DOE Review, FNAL

 Began bi-weekly meetings with Alex Ratti, LARP and LBL management, and Enrico Bravin (CERN) to stay up to closely monitor progress.  Working with the CERN controls group and LAFS on the software end.  Draft requirements specification created.  Enrico and Alex working on document to formally specify the handoff to CERN.  Working with CMS luminosity group, who will contribute some manpower to do the deconvolution microcoding necessary for high intensity operation.  For more details on Lumi status, see Ratti talk 7/13/09 17 E. Prebys, DOE Review, FNAL

 Original plan  Very difficult even to figure out what the budget was Estimates range from $ M  Finished in FY07  Currently  Spent $4.1M so far  Need to spend ~$300k more  Finished in FY09  Bottom line  These sorts of overruns are not that unusual in real projects!  LARP contingencies are far from sufficient to cover overruns in significant deliverables.  LARP should concentrate on R&D and avoid “hard deliverables”  More about this shortly… 7/13/09 18 E. Prebys, DOE Review, FNAL

 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General breakdown (informed by Steve’s exit advice)  Accelerator Systems: $2.9M  Magnet Systems: $5.0M  Program Management: $2.1M Includes LTV and Toohig Fellows (of which we have 4)  Contingency: $2M  In then end, had to give up some continency to increase Program Management  Lesson learned: this process started way too late.  Note: budget later increased to $13M, which proved necessary. 7/13/09 19 E. Prebys, DOE Review, FNAL

 Luminosity monitor was expected to be complete by end of FY08  Instead had significant overruns, and needs significant funds on FY09 (original request $1M -> $800k)  Still consider it absolutely vital for lumi to work!  Rotating collimators still a big budget item  Still consider it important to complete a prototype this year in time to at least be considered a solution by CERN.  (Initially) strong feeling that LARP should take a leading role in crab cavity development  Led by Rama Calaga  Support by CERN  General feeling that “the train is leaving the station”.  Magnet program still has to funded at a level that will insure a working magnet for the LHC Phase II upgrade 7/13/09 20 E. Prebys, DOE Review, FNAL

 Accelerator Systems  Iterative process, primarily involving Wolfram, Tom, Alex, and myself, to converge on the bottom line. Key component: relying on labs to contribute labor in accordance with their core competencies (i.e. not charged directly to LARP)*  Key casualty: No real money for PS2, for which there was a great deal of excitement within LARP and at CERN Will continue with contributed labor while we decide what to do for next year.  Magnet Systems  Much more monolithic than AS  L1 and L2 managers worked to stay within the budget 7/13/09 21 E. Prebys, DOE Review, FNAL

 Not much leeway  Management costs determined by historical usage  Need to honor commitments to LTV’s and Toohig fellows  Only discretionary is Programmatic travel, which I have reduced by trying to include travel with the appropriate project. 7/13/09 22 E. Prebys, DOE Review, FNAL

 Crab cavities  Original request: $700k Cavity design Cryomodule design LLRF  Budget: $300k Rely on “off project” help from BNL, FNAL, and SLAC Defer cryomodule and LLRF work  PS2  Uli Wienands developed a number of plans under various funding scenarios  In the end, budgeted $100K, primarily for travel and M&S, assuming that most scientific time would be contributed. 7/13/09 23 E. Prebys, DOE Review, FNAL

7/13/09 24 E. Prebys, DOE Review, FNAL

7/13/09 25 E. Prebys, DOE Review, FNAL Initial: 10,318 Carry Forward: 948 Allocated Contingency: 1,846 Total: 13,142 Remaining Contingency: 667

7/13/09 26 E. Prebys, DOE Review, FNAL

7/13/09 27 E. Prebys, DOE Review, FNAL

7/13/09 28 E. Prebys, DOE Review, FNAL

 LARP relies heavily on contributions to form core programs, for which LARP is not directly charged.  BNL does not charge to these B&R codes, but contributes 2-3 FTE in “common interest” research  Clearly, LARP could not function without these contributions  Assume that arrangement will continue  But need to explicitly account for it better 7/13/09 E. Prebys, DOE Review, FNAL 29 FY07FY08FY09FY10FY11 FNAL7, , , , , LBL1, , , , , SLAC , , , Total8, , , , , Estimated B&R KA , KA , and KA

7/13/09 E. Prebys, DOE Review, FNAL Slide n° 30 / 26  Instrumentation  All systems in and ready for beam  Luminosity Monitor: – All hardware is at CERN and all hardware that can be installed is installed  Rotatable Collimator: – First prototype jaw passes thermal mechanical tests – Majority of hardware for 3 more jaws (2 full collimators) in hand  PS2 – 5 year plan involving 4 labs coordinated with CERN & LARP; early results  SPS Ecloud – SPS measurements during 3 MD periods show effects that can be simulated; RF modelling to control instabilities has begun

 Crab Cavity – Baseline design of cavity/coupler and SBIR to fabricate – Multinational, multilab effort working/meeting regularly to develop plan  Other – Crystal experiments UA9 and T980 installed full-time & taking data regularly – E-lenses for RHIC approved & feedback for LHC expected – LLRF model used to commission LHC system without beam; beam commissioning planned – HW commissioning for Schottky, AC Dipole & Tune/Chromaticity FB complete – New Synchrotron Light Monitor designed, assembled & installed with LARP effort 7/13/09 E. Prebys, DOE Review, FNAL 31

 Lumi and rotatable collimator should ramp down considerably, allowing concentration on other significant commitments  Candidates:  Crab cavity effort Crab cavities deflect the beam to compensate for crossing angle. Potential to dramatically increase luminosity under most likely Phase II upgrade scenario  PS2 Activities CERN has requested LARP help in the design (white paper study) of the PS2, which will replace the PS for the phase II upgrade. 4/8/09 32 E. Prebys,CM12 Introduction

 Pros  Potentially a big impact on luminosity  Lots of intellectual interest in US community  Can be divided into well-defined tasks that are straightforward to monitor.  Cons  Barring a budget windfall, LARP will not have the resources to take a significant role in construction, so must coordinate with multiple labs/countries/funding agencies.  Current plan relies on SBIR grants  Bottom line:  LARP’s role in crab cavities will necessarily be limited  If crab cavities are to succeed, it must be through a significant coordinated effort. 4/8/09 33 E. Prebys,CM12 Introduction

 Pros  Lots of opportunities to make contributions  Well aligned with US interests and expertise, particularly Project X  Involvement “scalable”  Our involvement both desired and assumed by CERN  I think we can be very effective  Cons  Seen by some as being outside the LARP mandate LARP management disagrees  Potential areas of focus which were considered  Injection issues  Electron cloud  Laser stripping?  We will handle this effectively like “new initiatives”  (see Wienands talk for details of down select) 4/8/09 34 E. Prebys,CM12 Introduction

 High Priority  Finish what we started (Lumi, rotatable collimators)  E-cloud feedback for SPS  PS2!  Hollow e-lens as collimator (relatively new)  Low Priority  Crabs Seen as too big for LARP pending fall review  LLRF Although currently re-negotiating LLRF goals with Steve Myers  E-lens as beam-beam compensator  H- activities Particularly laser emittance monitor 6/5/09

 Establish Nb 3 Sn as a viable technology for the LHC Phase II upgrade 7/13/09 E. Prebys, DOE Review, FNAL 36

7/13/09 E. Prebys, DOE Review, FNAL 37 Newly defined goal of LARP (aka HQ-2) True prototype. Probably beyond the scope of LARP (APUL-II?)

 Materials –  strand and cable available when needed (as usual)  strand development (heat treatment schedule) for HQ coils  strand testing – critical currents, stability at temps between 4.5 K and 1.9 K  strand – critical current as a function of strain  cable testing at NHFML  cable development for HQ  LQ  Coils - Development of production procedures  Shell support structure – build, and test with dummy coils at 300 K and 77 K 7/13/09 E. Prebys, DOE Review, FNAL 38

 HQ  Design completed, most parts on order  Practice coil #1 completed through reaction  Practice coil #2 underway  TQ test bench  TQS02 – quench tests of 54/61 material between 1.9 K and 4.5 K, observation of quench current decrease below 2.6 K  TQS03 – construction with 108/127 coils completed, now at CERN for cold test  TQ mirror (single coil test) – measured magnet thermal margin, quench test of 108/127 coil from 1.9 K to 4.5 K  All training quenches above 200 T/m in optimized models Maximum gradient 231 T/m 7/13/09 E. Prebys, DOE Review, FNAL 39

 Work to finalize the magnet plan and demonstrate the technology in the context of the Phase II upgrades  Even if Phase-II is in 2020, there will have to be overlap between production and R&D 7/13/09 E. Prebys, DOE Review, FNAL 40

 There’s a somewhat rocky history of “outsiders” getting involved in accelerator projects.  The LARP program has had impressive success integrating US scientists into LHC activities  Toohig Fellowship 2-3 year PostDoctoral position Successful candidates choose their host lab Spend ~50% of their time at host lab and 50% at CERN  Long Term Visistor (LTV) program LARP provides support for advanced postdocs or scientists to spend extended periods at CERN, working on predetermined projects. Built on the model of very successful stays by Peter Limon, Jim Kerby, et al, involved with the triplet installation. 7/13/09 E. Prebys, DOE Review, FNAL 41

 Alumni  Rama Calaga Did important, and appreciated, studies on SPS Has been coordinating crab effort Now a BNL staff, soon LTV  Helene Felice Did valuable work on magnet program Now a LBNL staff  Current  Ryoichi Miyamoto (BNL) Former FNAL Joint Accelerator PhD student (w/ Sacha Kopp) Working with AC Dipole and Lumi  Riccardo De Maria (BNL) Working on SPS e-cloud feedback, PS2 studies and diagnostics  Dariusz Bocian (FNAL) Working on beam loading issues on Nb 3 Sn magnets 7/13/09 E. Prebys, DOE Review, FNAL 42

 Current  Jim Strait (FNAL) Went to CERN to work on machine protection Got involved with analysis of “incident” Gave two talks at the Chamonix workshop  Steve Peggs (BNL) Working on UA9 Experiment  Alan Fisher (SLAC) Has led the effort to improve the synchrotron light abort gap monitor (very important)  Eliana Gianfelice-Wendt (FNAL) Beam commissioning Deferred when machine broke  Future  Approved Rama Calaga (BNL, former Toohig): crabs, beam commissioning Uli Wienands (SLAC): PS2  Pending Chandra Bhatt (FNAL): flat bunches in SPS Mai Bai (BNL): machine protection 7/13/09 E. Prebys, DOE Review, FNAL 43

 The Office of HEP wants to see a plan for LARP over the next five (?) years, assuming that is the time scale of the magnet program.  Assume LARP budget will shrink as APUL budget grows  Initial guidance $12M in FY10, shrinking by $1M every subsequent year.  First draft shifted by 1 years (FY10: $13M, FY11: $12M, etc)  Long term planning has been a major priority this year  CM11, October 2008 Presented general budget situation to collaboration  CM12, April 2009 Subgroups submitted drafts of multi-year plans  This review Rough draft of budget for FY10 and sketch of plan for subsequent years. 6/5/09

LARP had a period of rapid growth in the earlier yeas, which led to some over- optimism 7/13/09 45 E. Prebys, DOE Review, FNAL From LARP proposal: Actual FY09 Future? LARP assumed to ramp down as APUL ramps up

 From beginning through FY09  Accelerator systems Great emphasis in finding new projects  Magnet systems Lots of important work, but uncertainty made long term planning difficult  In general Budgets and plans made FY by FY with little emphasis on long term structure.  From now into the future  Magnet systems LARP must make a plan to demonstrate Nb 3 Sn as a viable technology in time to allow a (separate) construction project for Phase II  Accelerator systems Very important to understand how our various commitments and interests fit within a shrinking budget 7/13/09 E. Prebys, DOE Review, FNAL 46

 LARP is largely defined by the magnet program, however, it’s important to remember that the ultimate time scale is very different  The magnet program must demonstrate Nb 3 Sn as a viable technology in time to allow for a construction project for the Phase II upgrades (5-6 years) APUL II?  Even if we define Phase II upgrade plans as the “end” of LARP, many of the accelerator projects (and potential future accelerator projects) have a much shorter time scale Makes sense for LARP to continue, at some level at least, after the magnet program has ended.  Full expect new opportunities to present themselves after the LHC startup. 7/13/09 E. Prebys, DOE Review, FNAL 47

 In a change from previous reviews, we are emphasizing long term planning and budget considerations over technical details.  Nevertheless, the technical progress of LARP has been impressive Eg, PAC09 3 invited talks 3 contributed talks 33 posters  We are significantly further along than at this point in previous years  Have already been scrubbing the FY10 budgets in both the AS and MS subprograms  Have met with key lab representatives to explicitly discuss off project contributions. 7/13/09 E. Prebys, DOE Review, FNAL 48