Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)

Slides:



Advertisements
Similar presentations
Knock Down Fittings Product Design.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Optical Manufacturing Solutions 1 Probe Assembly.
1 All In One Training ASI ECS G11 Assembly. Getting Started Lay the system face down making sure not to damage screen.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
SnapVend, a Cans Setup Solution. SPRAY CANS -- VENDING SOLUTION FOR (USING #6 COILS) Here are some images of the process of fitting the cans. You will.
TEE COURSE GRADE 10 Anatomy of a PC DISASSEMBLING AND REASSEMBLING STORAGE DEVICES Practical Activity Guidelines and steps.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Assembling the CheapBot Line Follower In 8 easy steps.
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Knock Down Fittings J.Byrne 2014.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
STEP 1: ASSEMBLE ANGLE PLATES
PostBase Automatic Feeder Component Removal Service Training
TEMPERATURE DISTRIBUTION ACROSS THE EXTENDED SURFACE
Endcap shielding senarios:
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
STEP 1: ASSEMBLE ANGLE PLATES
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
Transfer Line and CSC Rφ Reconstruction
University of Wisconsin-Madison
HYBRID COOKTOP.
Starting from the Basics
University of Wisconsin-Madison
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
University of Wisconsin-Madison
4D-100, 4D-600 2½”- 10”.
880V 21/2”-10”.
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Step 1:Disassemble battery case
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)

What we need Cherry picker with free access to ALL of the IP side of YE±1 –This means both far and near sides About 2h35’ per point (6 points per endcap) About 5h20’ for just one point (see ahead)

HE EE TK EB Magnet Coil BARREL ME/1/1 ME/1/2 ME/1/3 RP YE/1 LD AR LEGEND: ASPD 2D Sensor DISTANCEMETER Z DISTANCEMETER R LASER AR LASER LD LASER MAB COLLIMATOR / LASER SOURCE MAB TP HB YN1 LB LP YN1

Location of link sensors on ME±1/(1,2) 8 14 DCOPS In ME1/

The *only* ME±1/2 CSCs that need to be removed in YE±1 are –ME+1/2/11 ME+1/2/10 and ME+1/2/12 must also come off –ME+1/2/15 ME+1/2/14 and ME+1/2/16 must also come off Link has sensors on ME+1/2/14 Apart from this, ONLY ME11 parts from link alignment need to be removed In the following, the steps in blue are needed only at this particular point

Disassembly Steps by point. Access with the cherry picker to the position, 20’. Open the cover of the ME11transfer plate Patch Panel, four M4 slotted countersunk (flat) head screws, 10’. Unplug two Radial ASPDs cables, and one Radial proximity cables, 15’. Open two covers of the ME11 transfer plate, five M4 slotted countersunk (flat) head screws each, 10’. (Open only one covers for the ME11 operation, 5’) Unplug Z and RPhi proximity sensor cables and temperature sensor cables of the transfer plate, 20’. Unplug of the two ME1/2 ASPDs cables, and un-routing cables on the ME1/2. 25’. Disassembly ME1/2 chamber ASPDs. Two M6 slotted screws and two pins. 20’. Disassembly ME11 Z and RPhi proximity sensor and temperature piece of the transfer plate, have two allen M5 screws + two pins holes, 20’. Unplug R proximity sensor cable of the ME1/1 chamber device, 10’. Disassembly ME11 chamber device, have two allen M6 screws + two pins holes, 25’. Disassembly the radial piece, of the +ME11 transfer plate, have two allen M5 screws + two pins holes. Back access too much complicate due to a lot of cables/tubes running around. 1h30’. Close the covers of the ME11 transfer plate and the Patch Panel and sealing all remaining devices on this area. 35’ (Only for the ME11 operation, 30’) Descend with the cherry picker. 10’ Total 5h20’ per point (only one such point in LS1) For just ME11 stuff: 2h35’ (6 such points per endcap)

Open the cover of the ME11transfer plate PP, four M4 slotted countersunk (flat) head screws, 10’.

Open two covers of the +ME11 transfer plate, five M4 slotted countersunk (flat) head screws each, 10’.

Disassembly ME1/2 chamber ASPDs. Two M6 slotted screws and two pins. 20’.

Disassembly ME11 Z and RPhi proximity sensor and temperature piece of the transfer plate, have two allen M5 screws + two pins holes, 20’.

Disassembly ME11 chamber device, have two allen M6 screws + two pins holes, 25’.

Disassembly the radial piece, of the +ME11 transfer plate, have two allen M5 screws + two pins holes, 1h30’.

The accessibility to the back side of the ME11transfer plate it is not easy…

Assembly Steps Access with the cherry picker to the position, 20’. Open the covers of the ME11 transfer plate and the Patch Panel and the sealing. Five M4 slotted countersunk (flat) head screws each, 15’. Assembly the radial piece, of the ME11 transfer plate, have two allen M5 screws + two pins holes,. Back access too much complicate due to a lot of cables/tubes running around. 2h15’. Assembly ME1/1 chamber device, have two allen M6 screws + two pins holes, 35’. Plug R proximity sensor cable of the ME1/1 chamber device, 15’. Assembly ME1/1 Z and RPhi proximity sensor and temperature piece of the transfer plate, have two allen M5 screws + two pins holes, 25’. Plug Z and RPhi proximity sensor cables and temperature sensor cables of the transfer plate, 25’. Assembly ME1/2 chamber ASPDs. Two M6 slotted screws and two pins. 30’. Plug the two ME1/2 ASPDs cables, and re-routing cables on the ME1/2. 35’. Close two covers of the ME11 transfer plate, five M4 slotted countersunk (flat) head screws each,15’. Plug two Radial ASPDs cables, and one Radial proximity cable, 20’. Close the cover of the +ME11transfer plate PP, four M4 slotted countersunk (flat) head screws, 15’. Sealing all devices on this area until the start of the next LHC running. 25’ Descend with the cherry picker. 10’ Total 7H00’