AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne, 19.03.2014.

Slides:



Advertisements
Similar presentations
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Advertisements

AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
OLYMPUS U.Schneekloth/R.Beck PRC closed session
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
AHCAL Mechanics status report Karsten Gadow CALICE AHCAL main meeting DESY,
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
Ge Test-stands at MPI Munich Xiang Liu 1.General 2.Crystals, Test-stands & Results 3.Outlook.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
The HCAL barrel absorber structure
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
AHCAL LDA CALICE electronics and DAQ Meeting DESY Hamburg, Dec. 10, 2012 André Welker Bruno Bauss, Volker Büscher, Reinhold Degele, Sascha Krause, Yong.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Kitakami Side AHCAL Assembly or anywhere in any detector.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Florian Buchsteiner (HEPHY Vienna)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
HF Test station at P5 A.Mestvirishvili.
Hadronic Shower Structure in WHCAL Prototype
Update of experimental hall in Japanese mountain site
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
Testbeam Timing Issues.
CMS RPC Endcap RE1 Status Report
AHCAL Mechanics status report Karsten Gadow CALICE AHCAL main meeting
HPGe Planar Detector Stack
Polarized 3He target installation
Presentation transcript:

AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,

Karsten Gadow | CALICE Collaboration Meeting | | Page 2 Outline AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and Cooling 5.Absorber Structure validation (earth quake)

Karsten Gadow | CALICE Collaboration Meeting | | Page 3 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

Karsten Gadow | CALICE Collaboration Meeting | | Page 4 AHCAL Mechanics Mechanics for test beam setupschedule 29 Weeks from now dismount and install ?

Karsten Gadow | CALICE Collaboration Meeting | | Page 5 AHCAL Mechanics Mechanics for test beam setupT9 floor plan AHCAL test beam setup

Karsten Gadow | CALICE Collaboration Meeting | | Page 6 AHCAL Mechanics Mechanics for test beam setup Movable Stage with 2 x absorber stack Air stack 2 x absorber stack stand alone Movable stage with 1 x absorber stack Tungsten absorber stack

Karsten Gadow | CALICE Collaboration Meeting | | Page 7 AHCAL Mechanics Mechanics for test beam setupLayer configuration Layer 31 (4xHBU) Layer 21 (4xHBU) Layer 3-10 (1xHBU) Layer 1-2 (1xEBU)

Karsten Gadow | CALICE Collaboration Meeting | | Page 8 AHCAL Mechanics Mechanics for test beam setup1xEBU configuration EBU CIB Extender card type 1 Extender card type 2

Karsten Gadow | CALICE Collaboration Meeting | | Page 9 AHCAL Mechanics Mechanics for test beam setup1xHBU configuration HBU Extender card type 1 Extender card type 2 CIB

Karsten Gadow | CALICE Collaboration Meeting | | Page 10 AHCAL Mechanics Mechanics for test beam setup4xHBU configuration CIB SIB HBU Extender card type 1

Karsten Gadow | CALICE Collaboration Meeting | | Page 11 Task list (Summary):  test beam schedule fixed!!!  Movable Stage not used !stand by  EUDET absorber structureready  Tungsten absorber structure ready  air stack needed? ?  delivery of 50 pc. 2xHBU-extended-CIB housingsKW19  delivery of 50 pc. 2xHBU-extended-SIB housingsKW19  mounting of 14 fully equipped housings to EUDET absorber stackKW28 to KW29  install supply and read out hardware KW28 to KW29  commission and test KW30 to KW34  mounting of 14 fully equipped housings to Tungsten absorber stack framesKW34  commission and test (in air stack?) KW35 to KW38  pack test beam setup equipmentKW39  transport from DESY to CERNKW40  T9 Phase1KW43 to position inside the T9 allows parasitic measurements or reinstallation? KW45 to T9 Phase2KW48 to AHCAL Mechanics Mechanics for test beam setup

Karsten Gadow | CALICE Collaboration Meeting | | Page 12 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

Karsten Gadow | CALICE Collaboration Meeting | | Page 13 AHCAL Mechanics EUDET test beam setup Layer 21 (4xHBU) Layer 3-10 (1xHBU) Layer 1-2 (1xEBU) Layer 31 (4xHBU)

Karsten Gadow | CALICE Collaboration Meeting | | Page 14 AHCAL Mechanics EUDET test beam setup Layer 1 and 2 Support plate

Karsten Gadow | CALICE Collaboration Meeting | | Page 15 AHCAL Mechanics EUDET test beam setupLayer 3 to 10 Support plate

Karsten Gadow | CALICE Collaboration Meeting | | Page 16 AHCAL Mechanics EUDET test beam setupLayer 21 and 31

Karsten Gadow | CALICE Collaboration Meeting | | Page 17 Task list (Summary): > Test beam setup  test beam Phase1 or Phase2?  position inside T9?  installation design for self standing absorber structure done  supply, read out and cooling schemedone > Detector layer production  production of housingsongoing  production of 16 equipped HBU?  production of extender cards?  production of support platesongoing Detailed Schedule as to be worked out during this Meeting! AHCAL Mechanics EUDET test beam setup

Karsten Gadow | CALICE Collaboration Meeting | | Page 18 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

Karsten Gadow | CALICE Collaboration Meeting | | Page 19 AHCAL Mechanics Tungsten test beam setup Layer 21 (4xHBU) Layer 3-10 (1xHBU) Layer 1-2 (1xEBU) Layer 31 (4xHBU)

Karsten Gadow | CALICE Collaboration Meeting | | Page 20 AHCAL Mechanics Tungsten test beam setup aluminum frame with 2 x 1 mm FR4 cover to center the housing tungsten area Al frame parts produced at MPI

Karsten Gadow | CALICE Collaboration Meeting | | Page 21 AHCAL Mechanics Tungsten test beam setup Layer 1 and 2 housing with 1xEBU CIB

Karsten Gadow | CALICE Collaboration Meeting | | Page 22 AHCAL Mechanics Tungsten test beam setup Layer 3 and 10 housing with 1xHBU CIB

Karsten Gadow | CALICE Collaboration Meeting | | Page 23 AHCAL Mechanics Tungsten test beam setup Layer 21 and 31 housing with 2xHBU SIB CIB

Karsten Gadow | CALICE Collaboration Meeting | | Page 24 AHCAL Mechanics Tungsten test beam setup 50 frames frame with housings closed housings removed cover plate

Karsten Gadow | CALICE Collaboration Meeting | | Page 25 AHCAL Mechanics Tungsten test beam setup 40 tungsten absorber plates are installed

Karsten Gadow | CALICE Collaboration Meeting | | Page 26 AHCAL Mechanics Tungsten test beam setup Modification of the tungsten absorber structure ?

Karsten Gadow | CALICE Collaboration Meeting | | Page 27 Task list (Summary): > Test beam setup  test beam Phase1 or Phase2?  position inside T9?  modify tungsten absorber structure ?  installation design for self standing absorber structure done  supply, read out and cooling schemedone > Detector layer production  production of housingsongoing  production of 16 equipped HBU?  production of extender cards?  production of support framesdone  production of inner support platesongoing Detailed Schedule as to be worked out during this Meeting! AHCAL Mechanics Tungsten test beam setup

Karsten Gadow | CALICE Collaboration Meeting | | Page 28 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

Karsten Gadow | CALICE Collaboration Meeting | | Page 29 AHCAL Mechanics Cabling and Cooling setup power distribution Power cabling for 1 x submodul LDA

Karsten Gadow | CALICE Collaboration Meeting | | Page 30 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

Karsten Gadow | CALICE Collaboration Meeting | | Page 31 Simulation for AHCAL barrel structure will be done in summer 2014 by DESY-ZM1 ILD workshop, Cracow, September 2013 AHCAL Mechanics Absorber structure validation (earth quake)