The Schoharie Bridge Collapse, Scour By Group 18 4 th Year Civil Engineering Date: 28 th of October 2005.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Presentors: Tom Hardinger – Wisconsin DOT Eugene Hietpas – Collins Engineers Inc. This presentation and its contents may not be duplicated or reproduced.
Residential Foundations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture He who has not first laid his foundations may be able with.
TEQIP-II Institutions
POWERPOINT PRESENTATION
Scour Protection Measures GUATEMALA BRIDGE. Scour  Bridge scour is the removal of sediment such as sand and rocks from around bridge abutments or piers.
Cuckmere Estuary Options Modelling Study Cuckmere Pathfinder Project Scott Ferguson Landscape, Visitors, Heritage and Economy of the Cuckmere: Evidence.
Cassandra Rutherford Master of Science Candidate Department of Civil Engineering Department of Civil Engineering Identifying Bridge Scour Susceptibility:
Civil & Environmental Engineering Design
Impact of Climate Change on Water Resources: Is it an Issue for Emergency Managers? Richard Palmer Dept. of Civil and Environmental Engineering University.
Foundation Engineering CE 483
TOWER BRIDGE.  Tower Bridge is a bridge in London  It crosses the River Thames near the Tower of London.
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
The San Francisco Earthquake, 1989
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
By George C. Lee University at Buffalo
Main Goals of this Activity
Bridges Vocabulary. Bridge  A structure used to help people cross valleys, rivers and bodies of water.

Bridge Engineering (5) Substructure – Abutments and Piers
Brian Brenner Aaron Levine Cindy Tran
Seismic Retrofitting of Bridges Donald Kirkcaldie Seismic Retrofitting of Bridges Donald Kirkcaldie.
1000+ Year Flood Event Terry D. Leatherwood, P.E..
Real-Time Bridge Scour Monitoring: Recent Technological Development Present at Ohio Transportation Engineering Conference Oct 23-24, 2007 Bill X. Yu and.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Fluvial Criteria in the FAHP. “ All permanent stream crossing replacements must provide for a fully functional floodplain”
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
The Schoharie Creek Thruway bridge collapse
civil engineer Engineers who design public works such as roads and bridges.
It doesn’t matter what the subject is; once you’ve learnt how to study, you can do anything you want.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
An-Najah National University Faculty of Engineering Civil Engineering Dept. Graduation Project Design of Foundation for Residential Building By : 1.A’laa.
The Schoharie Creek Thruway bridge collapse Group 18 Karen McMorrow David O’Brien Clare Whitely.
THE HISTORY OF BRIDGES TRANSPORTATION IN AMERICA.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Armadillo.
Bridge Hydraulics and Geotechnical. BRIDGE HYDRAULICS AND GEOTECHNICAL TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 The Hydrological.
SMK4122 Offshore & Ocean Engineering | Copyright © 2012 Koh Kho King Project 1 – Offshore Accidents Group Projects Consist of 4-5 members Report (100 pages)
Bridge Engineering (2) Bridge Forms 1. *Introduction 1.1 Beam bridges (Dongming YR Brdg)Dongming YR Brdg 1.2 Arch BridgesArch Bridges 1.3 Cable-supported.
Tay Bridge Disaster.
BUILDING CONSTRUCTION
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section Girls 1.
Point Pleasant Bridge Disaster Group 19. Events and consequences 5PM December people killed, 9 injured Only major connection between West Virginia.
The Malahide Railway Viaduct Group 15: Harry Griffin & Carl O’Sullivan.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
Bridge disasters.
Replacement of Vehicle Bridge over Spring Creek
TOPIC 3: DESIGN AND ANALYSIS OF SHALLOW FOUNDATION
APPLICATIONS OF TECHNOLOGY
New hazards and transport infrastructures
Replacement of Vehicle Bridge over Spring Creek
نتعارف لنتألف في التعارف تألف (( الأرواح جنود مجندة , ماتعارف منها أئتلف , وماتنافر منها اختلف )) نماذج من العبارات الايجابية.
Residential Foundations
Residential Foundations
Introduction to Engineering Design
Human Impact on the Environment Unit
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
GIS In Water Resources C E 394K Impact of Floods to the Bridge Deterioration Process – The case of Onion Creek Oscar Galvis Nov 22th 2016.
Level 2 BIM - RPW Scour Survey Level 2 BIM RPW Inspection Case Study
Discharge Rate in White Point Swash
Replacement of Vehicle Bridge over Spring Creek
Commercial Foundations
CECINA RIVER: SIMULATION OF THE 24/11-2/12/2003 FLOW EVENT
Commercial Foundations
Presentation transcript:

The Schoharie Bridge Collapse, Scour By Group 18 4 th Year Civil Engineering Date: 28 th of October 2005

Introduction Background The Bridge The Collapse Causes of Collapse Lessons Learnt

Background Design Started in 1949 Completed in October : 100 Year Flood Collapsed in 1987

The Bridge Standard Highway Bridge 165 Meters Long 5 Simple Supported Spans 2 Columns

The Collapse 5 th of April 1987 Spring Flood Pier 3 Pier 2 Pier 1

The Collapse Collapse of Span 2

Causes of Collapse Extensive Scour Shallow Foundations Blue Prints Under Reinforced Roadway

Lessons Learnt Importance of Footing Depth Under Water Inspections River Flow Design For Rare Events

Questions