4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

5 th Workshop on ALICE Installation and Commissioning April 1 rst & 3 rd, CERN Muon Tracking (MCH) Conclusion of the February/March 08 ALICE COSMIC run.
11th April 2008TOF DA & ppChiara Zampolli. DAQ-DA Three DAQ-DAs implemented, deployed, validated, and tested: TOFda TOFnoiseda TOFpulserda DCS-DA One.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
High Level Trigger of Muon Spectrometer Indranil Das Saha Institute of Nuclear Physics.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 Muon Tracking : Tutorial Introduction Log on the muon_trk machine 1) Data Acquisition 2) Detector Control System 3) Mood.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Experience with analysis of TPC data Marian Ivanov.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
1 ITS Quality Assurance (& DQM) P. Cerello, P. Christakoglou, W. Ferrarese, M. Nicassio, M. Siciliano ALICE OFFLINE WEEK – April 2008.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
TPC QA + experience with the AMORE framework Marian Ivanov, Peter Christiansen + GSI group.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Features needed in the “final” AliRoot release P.Hristov 26/10/2006.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
AliRoot survey: Calibration P.Hristov 11/06/2013.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Dimuon Spectrometer : Status of the tracking chambers
Marian Ivanov TPC status report.
Controlling a large CPU farm using industrial tools
Commissioning of the ALICE HLT, TPC and PHOS systems
CMS Preshower: Startup procedures: Reconstruction & calibration
SDD in February ‘08 cosmic run
11th Pisa meeting on advanced detectors
Implementation of DHLT Monitoring Tool for ALICE
Presentation transcript:

4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC run in December

Status of Hardware during Run Dimuon Forward Spectrometer (DFS) Tracking Chambers : 5 stations, each station has 2 detection planes or chambers 1 chamber/plane gives an (x,y) coordinates μ+μ+ μ-μ- primary vertex Z Y X Station 1 Station read out during the december cosmic run.

Status of Hardware during Run Dimuon Forward Spectrometer (DFS) Tracking Chambers : 5 stations, each station has 2 detection planes or chambers 1 chamber/plane gives an (x,y) coordinates During the december cosmic run : almost everything is installed (but local commissioning is not finished yet) 1/5 of the DFS was powered Full Station 1 most of the time part of Station 1 + part of Station 2 for the “2 LDC in global” test no particular issues air cooling (St1 and St2 is very stable), temperatures look fine power ok (a few trips have been seen on HV and LV) our last day (Tuesday 18th) was perfectly stable !

DAQ No real DAQ issues : compliance with DAQ global achieved really stable Readout times (in 0-suppressed mode after taking pedestal runs, threshold calculation with a DA included in our rpm, etc… = conditions of real data taking ): Trigger 4 kHz Busy 307 us Readout rate 2050 Trigger 40 kHz Busy 485 us Readout rate 2050 Trigger 400 kHz Busy 496 us Readout rate 2050 Trigger 4 MHz Busy 497 us Readout rate 2050 Trigger 40 MHz Busy 497 us Readout rate 2050 Readout rate is slower than expected (lab measurements gave busy ~ 220 μs) : looking for possible explanation → saturating the buffer slows down the readout (algorithm scan through a lot of events in the DSP memory) in normal data taking mode, an “open” muon trigger (no pT cut) will not be greater than 5KHz.

DCS/ECS/Trigger/HLT DCS in very good shape : final state machine for low & high voltage works temperatures, gas flow is monitored ECS : scripts are ready (close to final) and working (tested during run) automatic generation of command depending on which DDL/equipId are declared in DATE Connection DCS-ECS (?) is not done yet Trigger : first days have been painful… but it finally worked we played at “you’re busy; not we’re not ; yes you are ; etc…” along with trigger people and other subsystem ;-) HLT : some global run were taken with HLT ; is it ok ?

Online Monitoring/Offline Online Monitoring : MOOD for muon_trk is in very good shape pedestal and gains visualization some global histograms (pad occupancy, hit map, errors) Data from gdc have been monitored during run in global and … That’s clearly a hit

Online Monitoring/Offline Data Storage : data are on CASTOR and some ESD are produced Data Quality Checks : ?? Is it about QA histograms…?

COSMIC Data, Analysis Results Raw data quality, event displays, Calibration results, Alignment results, Data reconstruction (ESD) Data analysis, First performance estimates i.e. signal/noise, tracks etc. All this is ongoing, but no results so far… calibration runs have been taken pedestal runs show nominal/expected noise gms doesn’t seem to increase noise when running ESD are not analyzed yet ; we will probably reconstruct a few clusters (give an idea on clusters size, charge and S/N )

Hardware/Software Status for February Run + Goals February Run : Full station 1 (as in december) Full station 2 (1/4 was successfully included in global in december) 1 DDL from station either 3, 4 or 5 Goals : Pedestal/noise : done with the DA (committed in AliRoot) calibration : done running with 0-suppression : done alignment and tracks : needs tracks ! (and all the stations + survey) Mostly the february run will be useful for testing the stability and training people. Some software work is needed as well to test and to finalize pieces of software (calibration, ECS scripts).

Action to Completion Station 1 : ready for beam (dead channels ? but <<1%, all HV ok) Station 2 : ready for beam (to be confirmed this week) Station 3 : finishing the local commissioning Station 4 : finishing the local commissioning Station 5 : finishing the local commissioning can not be stopped during the 5 weeks of the feb. cosmic run !

Conclusion Very good behavior of St1 : Cathode Pad Chambers works ;-) Readout (CROCUS) is compliant with DATE and Trigger patterns handling is fine (L1/2 reject are implemented and tested in lab) 1 LDC fully loaded ok and going to 2 LDC (partially loaded) was straightforward → including more should not be a problem (parallel treatment) software for data taking (DA, ECS scripts, MOOD) is in very good shape offline is working on the data ; pedestals runs are in OCDB and look fine Visualization of a pedestal run in the OCDB. (L.Aphecetche)

Muon_trk questions Standalone runs with CTP emulator : will it possible to have an “all.seq” that include an sod+l2a+eod ? (without loading the 3 seq) What about documentation for shifters : ACR machines are disconnected from outside world. Everything should be done locally… ksnapshot + “openoffice, or anything else convenient”