COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection.

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Intelli-FLEX™ Intelligent Fence Mounted Cable Type Sensor
Nokia 30 technical specification
Agenda Super-Cells Multi-Cells
Altai Super WiFi Training WiFi Network Planning
Lecture: 04 Engineer ASAD MEHMOOD. Contents ZXC10-BTSB Solution ZXC10-BTSB AE BDS RFS PWS.
GBC_022_E0_1 ZXG10-B8018 description
Enhanced Easy-Stop TM Trailer ABS Training. Enhanced Easy-Stop Trailer ABS System configurations to meet any air-braked trailer application 2S / 1M, 2S.
802.11a/n Wireless LAN Outdoor AP WNAP / 38  Product Position  Product Overview  Product Benefit  Product Features  Management – Web UI 
WIRED TYPE MULTI ZONE FANCOIL CONTROL SYSTEM MODEL : WSF- 700 SYSTEM
BGAN M2M SERVICE + HUGHES 9502 BGAN TERMINAL First BGAN Terminal for Fixed Site Deployment Eric Talman – Technical Manager Whenever Communications, LLC.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
GS3055-I GSM Universal Wireless Alarm Communicator
802.11a/n Wireless LAN Outdoor AP
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
Enhanced Easy-Stop TM Trailer ABS Sales. Enhanced Easy-Stop Trailer ABS System configurations to meet any air-braked trailer application 2S / 1M, 2S /
Site Troubleshooting Guide
Flexi EDGE BTS Title slide Used as a prompt to start the presentation.
iDAS Antennas Product Line Highlights
January 2015 SlimLine XR ITS 2.
CAPACITY planning using BTS (DTRU)
Wireless TL70 70 mm Wireless Modular Tower Light
Team Members Jordan Bennett Kyle Schultz Min Jae Lee Kevin Yeh.
Unpack From Box and Inventory Technical Bulletin User’s Manual Assembly Procedure Direct or Strap Pole Mounting Kit Face to Southern Sky High Temperature.
© 2015 Vermason Ltd. SmartLog V5 ™ with Turnstile.
1250 ca UNIFRONT SHELTER. 200 ca ca. 200 ca
Part 1 Using the ARM board And start working with C Tutorial 5 and 6
IRRInet & ICC System Concept
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Gilad Peleg Director Technical Support BreezeLINK Introduction.
An Enhanced/Permanent Amateur Radio Station Proposal L. McFadin, W5DID K. Banke N6IZW
1 P ROTEUS AMT Adaptive Modulation Transport. 2 Product Overview AMT-Series Indoor Unit Outdoor Unit L-Series Indoor Unit.
All rights reserved © 2010, Mobiserve Prepared By: RIZWAN AHMED RAFIQ Operation Support Engineer (Training & Consultancy) ALCATEL BTS.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
ENERGY of 21 st Century Independent Power Supplies.
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
Site Construction & Installation Services
GS3055-I GSM Universal Wireless Alarm Communicator
Antennas for GSM System Contents Base station antenna specification and meanings Antenna types and trends.
SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,
Verigy V93000 Service Training Appendix B Autotransformer E8005A.
Digital Cable Tuner[Model :TDMK-G5XXD] User’s Manual (TUA TDA10021H) May 2004 Evaluation kit TDMK-G5XXD.
Codan 5700 Series C-Band Transceiver Technical Overview.
©Copyright 2015 SmartLog V5 ™ with Turnstile. SmartLog V5™ with Turnstile Charleswater.co.uk The patented* EMIT SmartLog V5™ is designed for fast, frequent,
Wireless TL70 Sure Cross ® Wireless TL70 Tower Lights combine the best of Banner’s popular Tower Light family with the reliable, field-proven, Sure Cross.
Wireless TL70 Sure Cross ® Wireless TL70 Tower Lights combine the best of Banner’s popular Tower Light family with the reliable, field-proven, Sure Cross.
New product introduction:
© Copyright 1998 P-Com, Inc PTM-0018 THE BROADBAND RADIO ACCESS NETWORK.
ERICSSON MICROWAVE COMMISSIONING GUIDELINES
Non-contact lever meter with integrated GSM/GPRS modem and data processing algorithms.
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
FLATPACK Rev.5 September 2002 Updated versions may be available.
Broadcasting devices. Broadcasting devices overview USB Power Monitor, type channel, 4-line display, USB, Digital out, Opto out WEB Power Monitor,
Modular Flexible Manufacturing System for Industrial Engineering teaching and research ps-training-series/
DMR Tuner Training Document.
What are the steps to install a Brother Printer without the CD.
RRH2x G/3G Implementation Strategy
RD98X(S) network topology Hytera DMR repeaters comparison
RBS 6000 MICRO RRU update Feb., 2013
X-Spot Lamp Socket Replacement Procedure
Product Introduction --AP Controller M3 Yaojun 26/12/2015
5. Outdoor unit Installation
Installation-Troubleshooting-Maintenance
Redundancy Switching Components
IRRInet-M IRRInet-ACE Product Introduction
AM-7027 Up Converter-Amplifier
IEC COLLEGE OF ENGG. & TECH.
Presentation transcript:

COMMUNICATION INFOTECH

BTS COMMISSIONING

Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection from DDF Switch on the bts cabinets breakers & connects the laptop with BTS User name & password Communication port setting

OR After connecting this window will be appear Go to configuration>bts.sw download>to download bts software After BTS software download this window will be appear Go to offline files & select 1 st file of master file Go to offline files & select 1 st file of DDL file

Bts software starts to download All these files are downloaded Go to configuration bts commissioning Click start commissioning Edit sector maping Check all twin TRE’s Click end commissioning click << arrow to move selected to available modules

All modules shifted to update module Click no to end Reconnect the a bts connector at DDF by verifying the tx/rx cable properly Give hard reset to bts cabinet as the OML has established input the site on downloading

BTS INSTALLATION TOOLS ESD Wrist Strap & Cable – Module / Sub Module Installation TORN SEREW DRIVER SET – Installing modules T25,T10,T20,T45. Installing casing kits T25 Module grounding T.25 FCIA/FCQA/FCFA/FCSA/FMFA machines T25 Installing sub module T20 Fan plate assembling (T20) Standoff casing T25 FCIA Site grounding T25 Isolating cable clamps T10 EMIA door alarm kit T10

Socket or opened spanner 8mm,13mm,17mm,19mm DC power terminal nute 17mm Site grounding 13mm FCOA Site grounding 13mm & 8mm Cabinets 19mm Folding Knife Unpacking Routing cables through cable entries Preparing power & grounding cables

Adjustable wrench- general installation tools Side cutters- cutting be wraps general installation tools Torque wrench for antenna cables size depend on antenna jumper & seeder cable lugs Connecting antenna cables to ERNA or ECXY Routing cables General installation tools Cable ties Tape measure Flash measure Flash light, pocket lamp or torch

Off line commising completed successfully BTS on line commising procedure using BTS go to configuration >> HARDWARE Setting>> begin H/w modification. Go to configuration >BTS commissioning go to start commisining > Edit Q, Adress, Edit Sector maping & twin TRA setting as in off line Go to configuration > Hard ware setting> End modification to end online commissing.

On line commissioning steps Connect the A BTS connector at DDF by verifying Tx/Rx cable properly OML will be established after primary. A BTS put site on downloading from OMC & O&M Connect laptop to BTS MMF part Go to configuration > Hardware setting > Begin hard ware modification Online commisioning steps go to configuration > BTS commissioning > start commissioning – Edit Q Mux Adress

Edit sector mapping * check all twin. TRA setting * click end commissioning and shift all module from selected module to available module * go configuration > Hardware setting> End H/W modification - click yes when automatically H/W modifiaction window appear.

TECHNICAL DATA Installation options- Modular base station for indoor & outdoor installation, floor, Wall, Pole, Most mountable, Supports distributed & feeder less site set ups. Frequency bands- Flexi multi radio BTS is geared to support multiple paired & unpaired bands, 700,800,850,900,1800,1900,1700/2100,2100,230 0 & 2600 MHZ.

Maximum capacity- up to GSM or WCDMA or LTE at 20 MHZ or flexible combination of the above technologies in concurrent mode. For higher capacity several modules can deployed on a single site.

Multi radio configuration :- 1 Flexi 3- Sector, RF module for GSM/EDGE+ 1 systemmodule for WCDMA/HSDPA & LTE. Remote Radio Head (RRH) solution also supported Rf power amplifier technology- muli carrier power amplifier Height * width* depth 133*447*560mm per module, indoors & outdoors

Weight 25 kg per module Operating temp range – 35`c to 55`c Power supply 40.5 to 57 VDC 184 to 276 VAC with power module. Typical power consumption – 7 go W for combined GSM & WCDMA site. Output power- 240 W per RF module or 40w+40w per Remote Radio Head (RRH)