Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.

Slides:



Advertisements
Similar presentations
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Far Detector Data Quality Andy Blake Cambridge University.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
Abbreviated list of April Global Run (AGR) achievements All: clock frequency scan ECAL/RCT/L1: test (28 of 500) new oSLB  oRM links Strips: run with all.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
How could the CMS control room be improved? Greg Rakness University of California, Los Angeles.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Since last meeting, no collisions LHC has been working towards increasing the intensity in single bunches towards achieving the 2011 integrated luminosity.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Over the Last Couple of Weeks Gave talk at CMS Run Coordination Workshop –See Jay’s talk Two CSC Online computers have been replaced in the past two weeks…
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
Control Room and Shift Operations: CMS Greg Rakness (CMS Deputy Run Coordinator) University of California, Los Angeles ATLAS Post-LS1 Operations Workshop.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
ATLAS Detector Resources & Lumi Blocks Enrico & Nicoletta.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
Draft of to institute heads
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Timing/Synchronization Status
“Golden” Local Run: Trigger rate = 28Hz
Summary of Week 11: 14 – 21 March
CSC Turn ON Status Report by Fred B.
Global Trigger Finds Correct BX
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid 3 Nov

CSC downtime at the beginning and end of 2011 running… CSC downtime reduced after fix of CSC response to Resync – Since 21 July, CSC no longer has data corruption problems Since 21 July, biggest cause of downtime by CSC’s is from SEU’s – Currently, this makes CSC go into TTS=Out-of-sync… – … fixed by the DAQ shifter pushing TTCHardReset CSC to do: make the correct request for SEU recovery – Should go to TTS=Error 3 Nov 2011 G. Rakness (UCLA) 2 11 March – 21 July Int. lumi = 1.3/fb… CSC downtime = 13/nb 21 July – 30 Oct Int. lumi = 3.9/fb… CSC downtime = 7/nb

Preparation for high data rates CSC data event size – With ALCT zero-suppression, CSC event size would be reduced by ~15-20% Requires firmware update – Under discussion to implement during Year-End Tech. Stop ops/2057.html ops/2057.html – If CSC needs still more bandwidth, it is possible to increase the number of CSC SLinks to 16 or 36 HV trip threshold to be increased in inner rings – See next slide for more on HV… 3 Nov 2011G. Rakness (UCLA)3

Automation plan: CSC Expert System Goal: reduce load on CSC DOC by using the CSC Expert System First successful implementation: recovery from HV channel trips – 2010: HV trips had to be reset by DCS shifter – 2011: HV trips handled automatically by the Expert System Next goal: automated firmware maintenance – Recall daily task: CSC DOC reloads the program on CFEB’s and ALCT’s whose EEPROM’s have flipped a bit Problem discovered in 2008 Recovery procedure by the DOC has been reduced to a few clicks… – Example numbers: between Aug 2010 – Aug 2011… ~33% of ALCT’s needed to be touched (~150 ALCT’s) ~13% of CFEB’s needed to be touched (~300 CFEB’s) See – Timescale: during 2012 run 3 Nov 2011 G. Rakness (UCLA) 4

Fraction of active CSC channels HV distribution board died D-link board failure caused loss of the configurations of a few chambers 3 Nov 20115G. Rakness (UCLA) Diligence will be needed to preserve the high fraction of active CSC channels throughout 2012

A few items with impact beyond CSC 3 Nov 2011G. Rakness (UCLA)6

Question: if a subdetector has data corruption (e.g., sync-lost draining), is it possible to get a dump of the offending event? 3 Nov 2011G. Rakness (UCLA)7

Aging online computers All the VME control computers in CMS are more than 4 years old – Expect them to die at any moment… To facilitate the reinstallation of online software, CSC installs its RPM’s with quattor 3 Nov 2011G. Rakness (UCLA)8

“You’re calling the wrong DOC” The following scenario has happened twice: a calorimeter is misconfigured, causing…  L1A rate = 105kHz (pre-deadtime rate = 700kHz)  CSCTF in 80% Warning (nobody can run at 700kHz)  Shift crew calls CSC… 3 Nov 2011G. Rakness (UCLA)9 L1 Trigger rate = 105kHz Pre-deadtime rate = 700kHz Deadtime = 80% DAQ backpressure = False Might be worth to make one screen that has this information… (green if OK, red if bad)

Monitor timing more regularly 3 Nov CSC = average wire time per chamber, averaged over all chambers ECAL = average EB time per crystal, averaged over all crystals = ECAL – 0.325ns = CSC Average Time (nsec) CSC and ECAL see similar changes in timing  CSC needs to automate the monitoring our timing… G. Rakness (UCLA)

Summary of CSC Operations Highlights from 2011 running include… – High fraction of live channels – Small amount of deadtime – Automatic HV trip recovery Preparations for 2012 running include… – Correct request for SEU recovery – Reduction of event size – Automation of EEPROM reload Some “CSC worries” which are “CMS worries,” too… – Diagnosing (rare) data corruption – Worry about age of VME control computers – Calling the right DOC at the right time – Monitoring of timing 3 Nov 2011G. Rakness (UCLA)11

Backup 3 Nov 2011G. Rakness (UCLA)12

Goals for workshop Review the experience from the 2011 operations for the proton running and to plan for operations in 2012 We are asking speakers to comment on the following topics (as relevant): – Experience with beam operation in 2011 – Summary of major data loss sources – Readiness for high pile up, ~25ns, and 6e33 luminosity – Readiness for 25 ns – Requests for CMS re-commissioning before LHC start up, e.g. cosmics – Plans for 2012 operation – Availability of experts – Are you affected by SEUs? If so, how and what is required to recover – Experience with shifts, on-call load – Are you using standard tools (quattor) for software maintenance? 3 Nov 2011G. Rakness (UCLA)13