Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY 2011-12 on 05.02.2011.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Analysis of ARR & Tariff Proposal of WESCO for FY February 07, 2011 World Institute of Sustainable Energy (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
ENERGY AUDITS & ELECTRICITY BILLS Energy & Environment.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
By Dalip Singh, President, AEE Delhi Workshop for Electricity Consumers On 25Apr 2015 at NMA, Sector 62 Noida.
RETAIL RATE REVISIONS August 1, 2015 Presented By:
1 A Presentation on ARR & Tariff Proposal of GRIDCO for FY Analysis/Objections/Suggestions February 7, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Discussion on Power Tariff in Delhi Jointly organized by Rajiv Gandhi Institute for Contemporary Studies (RGCIS) & energywatch 6 th May 2003, New Delhi.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Xoserve sense checks & validation Reasonable Endeavours Claims.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Facilities Management and Design
1 A Presentation on ARR & Tariff Proposal of NESCO for FY Analysis/Objections/Suggestions By Dr. Shibalal Meher (Consumer Counsel) Nabakrushna.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
POTENTIAL AND STRATEGIES FOR DEMAND SIDE MANAGEMENT Dr. Ajay Mathur Director General, Bureau of Energy Efficiency.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
1 APresentationon ARR & Tariff Proposal of NESCO for FY BroadSuggestions/Objections Broad Suggestions/Objections Feburary 12, 2007 Together, let.
R OCKY M OUNTAIN P OWER C OMPANY DSM OPT-OUT PROPOSAL Utah Industrial Energy Consumers (UIEC) November 3, 2009.
Theft in Domestic and Commercial sectors 1Non-metering for want of meters, resulting in arbitrarily assessed consumption 2Tampering of meters 3Wrong recording.
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
1 APresentationon ARR & Tariff Proposal of WESCO for FY BroadSuggestions/Objections Broad Suggestions/Objections Feburary 13, 2007 Together, let.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Analysis of ARR & Tariff Proposal of OHPC World Institute of Sustainable Energy Consumer Counsel.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of WESCO for FY on
Opportunities for Competitive Energy Services IEA DSM Task XVI Experts Meeting, Deventer, Netherland, 8-9 October, 2007 Abhishek Nath Bureau of Energy.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Flow of Project-wise budget Monitoring Internal Controls effectively redefined Group of activities in the project which can be defined and monitored in.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
Electricity pricing Tariffs.
ARR & Price Proposal of GRIDCO For FY and Views of Stakeholders February 15, 2007 Together, let us light up our lives. ORISSA ELECTRICITY REGULATORY.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
PRESENTATION ON TARIFF POLICY By S.R.SETHI DIRECTOR (OPRS) DELHI TRANSCO LTD.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Indicator 2.03 Implement accounting procedures to track money flow and to determine financial status.
Established in Started by visionary Engineers & Entrepreneurs with Proven Power Electronics background. Committed to energy conservation. Made a.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Power Generation and Distribution
Open Access Power Purchase
Portugal Cove - St. Philip’s
Narragansett Electric Rate Classes
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
City of Lebanon, Missouri Electric Department
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
TARIFF STRUCTURE OF HPSEB
Promotion of Energy Audits in Small and Medium Sized Enterprises
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Town of Wrentham DPW Water Department
Queries raised by Director (Tariff) on ARR and Tariff Application of SOUTHCO for FY on
Presentation transcript:

Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on

2 Some DISCOMs have proposed to levy Monthly Minimum Fixed Charge (MMFC) in respect of LT Industry(S), LT Industry(M), SPP(LT) and PWW(LT) in terms of KVA. In this connection, CESU may submit whether the above category of consumers are having meters with facility of reading in KVA. Some DISCOms have opted for KVAh billing in place of existing KWh billing. CESU may submit an estimation of consumption data with KVAh billing as well as with KWh billing and the difference thereof and also the revenue implications. CESU should submit status of Bachata Lamp Yojana (BLY) of BEE as directed by the Commission in the last tariff order with their programme of implementation.

3 Some DISCOMs have proposed to levy demand charges on emergency drawal by CGPs of their region apprehending misuse of Clause 80(15) of the Distribution Code. In this context, CESU may submit month-wise individual emergency drawal of CGPs within its area of supply along with their respective rated capacity of the largest unit. CESU has submitted audited accounts for FY The licensee is required to submit the audited accounts for FY They should also explain as to why they are lagging in submission of updated audited accounts. CESU should submit month-wise cash flow statement for the FY (actuals upto end of January, 2011) considering the revenue items only. OERC had asked DISCOMs vide letter No.238 dtd to submit the DSM activities to be undertaken by them during alongwith their respective costs and benefits. Nothing has been received from CESU so far. CESU may submit the relevant details for FY to the Commission.