1 KGHM Polska Miedź S.A. The biggest producer of copper and silver in Europe Copper 486.002 t Silver 1100 t Gold 386 kg.

Slides:



Advertisements
Similar presentations
Biotechnology for Metal bearing materials in Europe
Advertisements

Nichromet Extraction Gold Technology
Greenwich Peninsula.
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
1. About us Ambiotek SpA, is a spin off from Universidad de Santiago de Chile, that develops and offers environmental solutions for the mining industry.
Environment Engineering I
King River Tasmania Copper Tailings Remediation. Background Macquarie Harbour is Largest Estuarine System in Tasmania 1893 – million tonnes of.
The Deloro Mine Site Demonstration Project K.Volchek, D.Velicogna, W.P.Wong, C.E.Brown SAIC Canada, Environment Canada NATO CCMS Pilot Study Meeting “Prevention.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
BASFORD GAS WORKS REMEDIATION USING SOIL WASHING TECHNOLOGY.
NATO/CCMS Pilot StudyRehabilitation of Old Landfills, Cardiff, 24 May 2004 Bob Harris Environment Agency England & Wales NATO/CCMS Pilot StudyRehabilitation.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Institute of Environmental Protection Maciej Sadowski Grazyna Porebska.
Problems due to overuse of energy Resources Unit III Part V
SEGI-AT Sp. z o. o.Energy from the biomass2 Production of energy from the biomass - an option for the sustainable development of industrial land.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS NATIONAL TECHNICAL UNIVERSITY OF ATHENS SCHOOL.
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Life Cycle Assessment Scott Matthews Civil and Environmental Engineering Carnegie Mellon University.
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
INTRODUCTION TO ENVIRONMENTAL GEOLOGY. Limits of resources Non renewable: rocks, minerals & fossil fuel Renewable resources: water, plants & alternative.
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
 The Mining Law governs access to federal lands for locatable hardrock mineral activities ◦ It is not an environmental statute and doesn’t need to be.
Chapter 16: Mineral Resources and Mining Mr. Manskopf Notes also at
Open-pit Mining By Jessica Paddy. What Is open-pit mining? The process of extracting rocks and minerals through an open pit or hole in surface of the.
Mine Rehabilitation at Yerranderie
Barbara Radwanek-Bąk Polish Geological Institute-Carpathian Branch Polias Geological Survey Some problems of sustainable management of mineral resources.
Working Group 1 Reference and Graded Approaches for Assessing the Impact of Radioactive Discharges.
REnescience at Amagerforbrænding By Project Manager Frank Hansen 2012.
Environmental Product Declarations and Product Category Rules For Businesses Rita Schenck American Center for Life Cycle Assessment January 2010.
LIFETIME ENGINEERING of Buildings and Civil Infrastructures Thematic Network LIFETIME in figures: Working period: 1/6/ /5/2005 Participation: 96.
Minerals and Rock Resources
Athens, June 5, 2006NATO CCMS Pilot Study1 Current Research Topics Dr. Anthimos Xenidis Lab. of Metallurgy National Technical University of Athens (NTUA)
Tailings and Waste Rock Management Alternatives Study
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
Waste Electrical & Electronic Equipment (WEEE). Waste Electrical and Electronic Equipment (WEEE) Directive Work started in the year 1994 To device a strategy.
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Earth Science Daily Challenge, 11/30 There will be a TEST on Minerals and Mining this WEDNESDAY. What QUESTIONS do you have about minerals and mining or.
Research Centre for Life Cycle Assessment National Institute of Advanced Industrial Science & Technology 1 Lifecycle Environmental Evaluation of Exploitation.
SINKS AS INTEGRATIVE ELEMENTS OF THE ANTHROPOGENIC METABOLISM Ulrich Kral, Paul H. Brunner Vienna University of Technology Austrian Science Fund (FWF):
SUATAINABLE WASTE MANAGEMENT NATIONAL PERSPECTIVE Joburg Waste Summit 24 March 2015 Mamosa Afrika Chemicals and Waste Management.
TERRAMIN AUSTRALIA Limited
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
EU INITIATIVES ON MINING WASTE. Why an initiative on Mining Waste ? Key environmental issues: l Potential environmental risks during disposal m Safety.
The Mining Cycle Exploration MiningReclamation Metals-6-1 Images: Martin Miller.
IED, BAT and Derogations Richard Wood URS Leeds 22 nd May 2013.
Mining Overview. The General Mining Act (GMA, 1872) Signed by President Ulysses S. Grant. Allowed miners who claimed minerals on federal public land to.
About 1.5 lb of copper for every 1000 lbs rock ore tailings.
MINING. Example: Coal Example: Gold Ore Example: Iron Ore (steel!)
Process LCA Wrap-up. Admin Issues Friday Feb 16th? When?
Raw materials at regional level 13th of January 2015 Brussels.
Pecomine s Project PA n° 42 Inventory, Regulations and Environmental Risks of Toxic Mining Wastes in Pre-Accession Countries Introduction to PECOMINES.
Environmental Pollution -any addition of undesirable substances to the soil and air, and both surface and groundwater by human activities -can spread far.
“Chailings” The production of char from coal tailings in Australia Improving land use outcomes.
Lecture Outlines Physical Geology, 14/e Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Plummer, Carlson &
Innovations and Demonstration of Novel Mine Water Treatment Technologies Dr Jo Burgess Research Manager: Mine Water Treatment and Management Water Research.
QKR Namibia Navachab Gold Mine
Alexander Petrovich Dalimayev,
TSCHUDI COPPER MINE.
HEAVY METAL SOLUBILITY AND MOBILITY IN HUMUS LAYERS IMPACTED BY COPPER INDUSTRY IN SOUTH - WEST POLAND Agnieszka Medyńska-Juraszek, Cezary Kabała Institute.
Groundwater Monitoring in Ontario
Life Cycle Assessment of MSWI residues: Recycling in road construction and landfilling Harpa Birgisdóttir.
The Stringfellow Acid Pits
Breakthrough Mining Technology
Introduction of Pilot Study
IMS-approach to the The Kempen (Flemish-Dutch border)
Mining and quarrying activities and waste generation
Objective and expected results
The International Committee on Contaminated Land Management of Groundwater Quality in the Netherlands
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Presentation transcript:

1 KGHM Polska Miedź S.A. The biggest producer of copper and silver in Europe Copper t Silver 1100 t Gold 386 kg

2

3 CBPM CUPRUM The general designer and researcher of LGOM copper basin

4 TECHNOLOGICAL CHAIN Mining Processing Waste disposal

SALES VOLUME Total4,928 mln zł Copper3,983 mln zł Silver772 mln zł

6 Owner structure of KGHM Polska Miedź S.A. (as at 12 January 2001)

Copper Sales - Markets

8 Industrial resources  mln tonnes of ore  depth up to 1250 m  average content Cu 2,12 %  average content Ag 56 g/t  Anticipated exploitation period years with current production volumes Copper Resources

9 Lena no 141 ha7 mln t Lena no 288 ha15 mln t Konrad no 1129 ha18 mln t Konrad no 212 ha1,2 mln t Konrad no 3145 ha16,6 mln t Gilów600 ha92,0 mln t Żelazny Most1260 ha525 mln t Tailings ponds

Localisation of tailings ponds

11 „Żelazny Most” tailings pond

12 TAILINGS PONDS ENVIRONMENTAL PROBLEMS  Huge scale of the pond  Dusting  Contamination of surface and underground water with salt and heavy metals in the local drainage basin  Increasing heavy metal contents in soil and plants surrounding the tailing plant  Contamination of Odra river by technological water

13 LICYMIN LIFE CYCLE ASSESSMENT OF MINING PROJECTS FOR WASTE MINIMISATION AND LONG TERM CONTROL OF REHABILITATED SITES KGHM PM S.A. CBPM CUPRUM G1RD-CT

14 Life cycle assessment of mining projects for waste minimisation and long term control of rehabilitated sites The main objective of this project is to develop and validate a metodology to minimise the „full life-cycle” impact of metalliferous mining projects, adopting an integrated approach to production and process design, including waste disposal, remediation and the costs involved GENERAL TARGET

15 POLISH PARTICIPANTS  KGHM Polish Copper S.A. /CBPM CUPRUM  Polish Academy of Science, Kraków

16 Frame Scope of Work  Updating of the existing database  Conceptual LCA modelling of the production and processing and financial modelling of these options  Mining and processing alternatives will aim at developing methodologies to improve recovery, minimise waste production and ensure safe, low risk disposal  Environmental monitoring and long term control of the impacts of the mining activities

START MARCH 2000

18 CLOTADAM Chemically Stabilised Layers KGHM PM S.A. CBPM CUPRUM G1RD-CT

19 Chemically Stabilised Layers Through forming chemically stabilised layers with properly selected lifi- time to help in faster, more effective and more environment- friendly closing tailings pond GENERAL TARGET

20 PARTICIPANTS  KGHM Polish Copper S.A. /CBPM CUPRUM o Environmental Protection Dpt. o Environemntal Protection Management Dpt. o Tailing Ponds Dpt.  Polish Academy of Science, Kraków

21 Frame Scope of Work  Updating of the existing database  Preliminary selection of chemicals and additives  Elaboration of agents and methods for their application, including local additives  Laboratory research on application conditions and effectiveness of selected agents  Pilot tests  Technical-economic assesment  Elaboration technology for industrial application

START SEPTEMBER 2001

23