W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.

Slides:



Advertisements
Similar presentations
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Advertisements

Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Wesley Smith, U. Wisconsin, August 22, 2006 DOE Review: Task T: CMS at LHC - 1 Task T - CMS at LHC Personnel: Professors: D. Carlsmith, S. Dasu, M. Herndon,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
IEEE NSS & MIC, Norfolk, Virginia, November Triggering on Particle Types: Calorimeter and Muon Based Triggers Sridhara Dasu Department of Physics.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Wesley Smith, U. Wisconsin, August 22, 2006 DOE Review: Task T: CMS at LHC - 1 Task T - CMS at LHC Personnel: Professors: D. Carlsmith, S. Dasu, M. Herndon,
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
W. Smith, August 2004 U. Wisconsin Task T - 1 Advances in Particle Physics 2004 Nobel Prize!
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
U.S. ATLAS TDAQ FY06 M&O Planning
Update on CSC Endcap Muon Port Card
HCAL Data Concentrator Production Status
LHC Collisions.
Regional Cal. Trigger Milestone: Major Production Complete
Regional Cal. Trigger Milestone: Production & Testing Complete
ATLAS: Level-1 Calorimeter Trigger
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
Physics at LHC Extra dimensions Composite quarks & leptons …….?
Plans for the 2004 CSC Beam Test
Presentation transcript:

W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist D. Loveless Senior Engineer J. Lackey* Assistant Scientists P. Chumney*, S. Lusin Postdoc F. di Lodovico Engineer M. Jaworski, Technician R. Fobes PSL Engineers F. Feyzi, L. Greenler, J. Hoffman, K. Kriesel, W. Mason, P. Robl*, D. Wahl* Outline: Calorimeter Trigger* -- W. Smith (this talk) Computing & Trigger Simulation -- S. Dasu Common & Muon Projects -- R. Loveless

W. Smith, August 2002 U. Wisconsin Task T - 2 Wisconsin Senior Personnel Responsibilities D. Reeder CMS Muon Institutional Board Chair Founding US CMS Collaboration Board Chair W. Smith CMS Trigger Project Manager CMS Steering Committee & Management Board US CMS Trigger Level 2 Manager US CMS Steering Committee, Project Management Group S. Dasu US CMS Calorimeter Trigger L3 Manager US CMS Advisory Software & Computing Board R. Loveless US CMS Muon Level 2 Project Manager (NEW) US CMS Common Projects Level 2 Manager Endcap Muon System Technical Coordinator, CMS Technical Board US CMS Steering Committee, Project Management Group

W. Smith, August 2002 U. Wisconsin Task T - 3 Calorimeter Trigger Personnel Physicists (at Wisconsin): Faculty: W. Smith (CMS Trigger Project Manager) S. Dasu (US CMS Cal. Trigger L3 Manager) Scientist: P. Chumney Postdoc: F. di Lodovico Engineers (experienced team at Wisconsin): J. Lackey -- Lead Engineer & Designer Also Lead Engineer for Zeus Calorimeter Trigger M. Jaworski -- Board Layout & Design support Worked on Zeus Calorimeter Trigger P. Robl -- Copper Link Test/Development Lead PSL Engineer, Worked on Zeus Trigger

W. Smith, August 2002 U. Wisconsin Task T - 4 Wisconsin CMS Task Support Infrastructure Grant HP-RISC Processor Farm,Scopes, Pulse Gen.,Test Equipment Mentor Graphics Grant Full CAD Software Suite UW Support of Personnel J. Lackey, S. Dasu, PSL Engineering UW Equipment Support Teleconference Equip.,Video Room Remodeling, CAD Printer UW CAD support Purchase of Visula PCB Suite, incl. high speed router New version of software used for Zeus trigger UW Computing Support 5 New Servers, 2 TB Disk, 1 GB/s network, Grad. Student RA Condor Collaboration (see S. Dasu Talk)

W. Smith, August 2002 U. Wisconsin Task T - 5 Detector Frontend Computing Services Readout Systems Filter Systems Event Manager Builder Networks Level-1 Trigger Run Control Trigger & DAQ Systems Level-1 Trigger Requirements: Input: 10 9 events/sec at 40 MHz at full L = Output: 100 kHz (50 kHz for initial running) Latency: 3  sec for collection, decision, propagation

W. Smith, August 2002 U. Wisconsin Task T - 6 Calorimeter Trig.Overview (all located in underground counting room)

W. Smith, August 2002 U. Wisconsin Task T MHz point to point backplane (proto. tstd.) 18 Clock&Control (proto. tstd.), 126 Electron ID (proto. tstd.), 18 Jet/Summary Cards -- all cards 160 MHz Use 5 Custom Gate-Array 160 MHz GaAs Vitesse Digital ASICs Phase, Adder, Boundary Scan, Electron Isolation, Sort (manufactured) Calorimeter Trigger Crate Spares not included* Data from calorimeter FE on Cu 1.2 Gbaud Into 126* rear Receiver CardsInto 126* rear Receiver Cards Prototype tested w/ ASICsPrototype tested w/ ASICs

W. Smith, August 2002 U. Wisconsin Task T - 8 Successful Prototyping Program Crate & 160 MHz Backplane tested  Clock Card tested  Receiver Card tested (w/ Adder ASIC)  Adder ASIC tested & production finished  Electron Isolation Card tested  4 x 1.2 Gbaud Copper Serial Link system: Successfully trans- mits data at 4 Gbit/s over 20 m cable  1st Generation Calorimeter Trigger Prototype Tests Clock Card Back- plane Electron Isolation Card Receiver Card Serial Receiver Mezzanine Card Serial Transmitter Mezzanine Card Serial Link Test Card Clear eye pattern shows good signal after 20 m cable w/ all 4 links Measured Bit Error Rate <

W. Smith, August 2002 U. Wisconsin Task T - 9 Front Rear Std. VME Slots Second Gen. Crate & Backplane 160 MHz with 0.4 Tbit/sec dataflow Initial tests indicate good signal quality Designed to incorporate algorithm changes New Non-Isolated Electron, Tau & Jet Triggers 48V DC Power Custom Point-to-point Dataflow VME

W. Smith, August 2002 U. Wisconsin Task T - 10 Second Gen. Clock & Control Card Fans out 160 MHz clock & adjusts phase to all boards 50% of functionality tested successfully DC-DC Converters Clock delay adjust

W. Smith, August 2002 U. Wisconsin Task T Compact Mezzanine Cards for each Receiver Card accept 4 x 20 m 1.2-Gbaud copper pairs transmitting 2 cal. tower energies every 25 ns with low cost & power. Uses new Vitesse Link Chips ( ). New Serial Link Test Card Status: tested and in production New Cal. Trig. 4 Gbaud Copper Link Cards & Tester (U. Wisconsin)

W. Smith, August 2002 U. Wisconsin Task T x 1.2 Gbaud Copper Link Test Setup Receiver mezzanine card: Test Transmit mezzanine card Serial Link Test Cards 20 m Cu Cable, VGA Connector Results: Bit Error rate <

W. Smith, August 2002 U. Wisconsin Task T - 13 New Calorimeter Trigger Receiver Card Top side with 1 of 8 mezzanine cards & 2 of 3 Adder ASICs DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Bottom side with all Phase & Boundary Scan ASICs Full featured final prototype board in test - initial results are good. Continue to test on-board ASICs & copper link mezzanine cards

W. Smith, August 2002 U. Wisconsin Task T - 14 Second Generation Electron Isolation Card Full featured final prototype board is finished & under test. Electron ID & Sort ASICs tested by Vitesse before delivery Make further ASIC on-board tests SORT ASICs EISO

W. Smith, August 2002 U. Wisconsin Task T - 15 Jet-Summary Card Ready to build pending tests of other boards Electron/photon/muon info. SORT ASICs to find top four electron/photons Threshold for muon bits To GCT Region energies To cluster crate Absorbs HF functionality Reuses Receiver Mezzanine Card To cluster crate

W. Smith, August 2002 U. Wisconsin Task T - 16 Testing New Receiver & Clock Cards, Crate, Backplane  160 MHz TTL clock with data into 200 MHz Memories (2 ns scale)

W. Smith, August 2002 U. Wisconsin Task T - 17 Status / Plans Conducting second generation prototype tests Crate, Backplane, CCC, RC, Receiver Mezzanine Card, Phase & Boundary Scan ASICs under test Phase ASIC validated & production complete Adder ASIC already validated & production complete Serial Link Test Card & Transmitter MC tested & in production Electron Isolation Card & EISO & SORT ASICs under test Sort ASIC Validated & production complete Goals for 2002/3 Completion of prototype tests, validate all ASICs Integrate Serial Links w/ECAL, HCAL front-ends Prototype Jet/Summary card manufacture Ready for manufacture -- waiting for other board tests Integrated HF into this card -- no need for separate HF crate Finalize Jet Cluster crate design Begin System Production & Test

W. Smith, August 2002 U. Wisconsin Task T - 18 Summary: ASICs and Cards Component# neededStatus Backplane182nd prototype being tested Clock & Control Card182nd prototype being tested Receiver Card1262nd prototype being tested Electron ISO Card1262nd prototype being tested Mezzanine Card1026Validated Jet/Sum Card18Routed, ready for production Serial Link Test Card10Validated & in production EISO ASIC252Under Test Sort ASIC576Validated - all in hand Adder ASIC378Validated - all in hand Boundary Scan ASIC1008Under test Phase ASIC1026Validated Spares not included

W. Smith, August 2002 U. Wisconsin Task T - 19 Installation in Underground Counting Room Expect access by March ‘05 Delay of 1 year from baseline Sufficient time for installation & some testing but not for complete commissioning with detectors Significant time needed for integration in synchronous pipelined system Slice Test (on surface) With both HCAL and EMU Verify trigger functions & interfaces by testing w/detectors on surface at CERN. Suggest as substitute for commissioning completion step. Will check as much on surface before gaining access to underground facilities. Planned for October ‘04 - March ‘05 Underground Counting Room Completion &Transition to M&O

W. Smith, August 2002 U. Wisconsin Task T - 20 Baseline Trigger L2 Task Schedule & Updates Tasksstartfinish new Produce TDR8/0012/004 Design Final Prototypes11/0012/014 Construct Final Prototypes6/016/02  11/02 Test/Integrate Final Prototypes12/0112/02  4/03 Pre-Production Design & Test6/026/03  11/03 Production12/026/04 Production Test6/0311/04 Trigger System Tests5/045/05 "Slice Test" (NEW)10/043/05 Trigger Installation3/059/05 Integration & Test w/DAQ & FE6/0512/05 Maintenance & Operations10/ months civil engineering delay of installation date With respect to date reported at Lehman ‘01

W. Smith, August 2002 U. Wisconsin Task T - 21 Software Work Crate Processor Hardware & Software Present status: Old Zeus Crate Processor and software Needs replacement by new CMS Compatible System New Hardware & New Software Software for debugging prototype boards Develop diagnostics software for each board Ship data for analysis outside crate processor Use tools well known to physicists Final software Want to reuse as much of test software as possible Need to add CMS Interfaces Personnel P. Chumney, S. Dasu, +...?

W. Smith, August 2002 U. Wisconsin Task T - 22 US CMS Trigger Organization Major US and International Management Responsibility and Effort

W. Smith, August 2002 U. Wisconsin Task T - 23 US CMS Lehman Review Trigger Findings 1999: "Trigger and data acquisition groups have shown good progress since the last review…Significant changes in the calorimeter and muon trigger electronics have been made since the last review with net benefits in system robustness and accessibility" 2000: "Management of both systems is good, with close accounting of cost, schedule and technical progress, Both projects appear to be well integrated into international CMS…The calorimeter trigger has made excellent progress in the last year, with prototypes of many of the components now constructed and being tested." 2001: "The trigger group completed their Technical Design report (TDR), which is a significant accomplishment. Both calorimeter and muon trigger subsystems have made excellent progress... Significant progress has been made on simulation software for the trigger. " 2002: "Impressive technical progress has been made…a realistic design based on experience with similar systems …Excellent progress has been made on the five custom digital ASICs…."

W. Smith, August 2002 U. Wisconsin Task T - 24 Lehman Review Recommendations 2001: "The Rice and Wisconsin groups should each pursue funds to maintain the level of their post-doc involvement on the CMS trigger." This recommendation was also made by US CMS Project Manager Dan Green in his presentation on US CMS Base Program Enhancement presentation to DoE on Sept. 19, : ”Support for an additional physicist for trigger software development should be considered to replace reduced support in the base program for this effort, well in advance of the slice test." Background S. Dasu promoted from Assoc. Scientist to Assistant Professor in Created a need for a postdoc to maintain the level of effort on trigger development, software, and simulation. Only CMS Calorimeter Trigger Physicist supported on Task T at that time and now: Assistant Scientist Pam Chumney. Support via Dasu startup funds for postdoc now exhausted. Insufficient for a ($6M) 350 board, 20 crate state of the art high-speed trigger system, its diagnostics and simulation Ramping up of effort for production testing and slice test will increase this need significantly

W. Smith, August 2002 U. Wisconsin Task T - 25 Planning for CMS Major Concern: Project support of Lead Designer/ Expert Engineer: J. Lackey Vital for commissioning and operations Part of US CMS project support for M&O Estimated technical support needs for M&O: Based on Zeus Cal. Trigger M&O Technician Operates, repairs, maintains test facility Repairs boards & infrastructure under physicist guidance Total required = 0.5 FTE Expert Engineer ~ 5 trips/year for 2-3 weeks to make difficult repairs Complicated/Subtle problems, Modifications to trigger electronics Designer - available for consultation ~ 2 trips/year for 2-3 weeks for review & design issues

W. Smith, August 2002 U. Wisconsin Task T - 26 Wisconsin Concerns Base Program Manpower at Wisconsin Major effort on trigger software required Tasks include board testing, monitoring/controls, diagnostics, configuration downloading and documentation, modeling, physics simulation, etc. In US CMS Plan as base program manpower Major effort on testing & installation Planned as activity of base program manpower For Trigger, Computing, Muon Projects New Major Effort on “Slice Test” Motivated by installation delay Also needs base program manpower For Trigger, Computing, Muon Projects Need additional Postdoctoral support

W. Smith, August 2002 U. Wisconsin Task T - 27 ConclusionsConclusions Calorimeter Trigger All second generation prototype boards and ASICs built & under test, some already validated Except jet summary card -- ready for manufacture Initial test results look good Integration tests w/ECAL,HCAL starts this Fall Production in 2003 Very good progress, but… Need increased support in 2003 for: Production Testing of > 1000 Boards Software Development Slice Test Installation and Commissioning