Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
PXIE: SSR1 Section Focusing Lens 1.Requirements table 2.Developed at FNAL 3.Available from vendors 4.Used at ANL 5.Layout of the SSR1 cryomodule 6.Case.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Quench study Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Amanda Brummitt, Steve Carr, Andrew Lintern, James Rochford STFC Technology RAL HeLiCal.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Superconducting Solenoids for COMET KEK Cryogenics Center, Osaka Univ. Kuno-san’s Team, J-PARC MLF Muon Group.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
Magnet designs for Super-FRS and CR
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
October 4-5, Electron Lens Superconducting Solenoid Michael Anerella October 4, 2010 Electron Lens.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Focusing Lens for the SSR1 Section of PXIE Preliminary analysis of main options 3/13/2012I. Terechkine1.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Magnetic Design S. Prestemon, D. Arbelaez, S. Myers, R. Oort, M. Morsch, E. Rochepault, H. Pan, T. Ki, R. Schlueter (LBNL) Superconducting Undulator Integrated.
Status of the HINS Linac Front End Focusing Lens Development Can we use these lenses in the SSR1 crymodule of PXIE ? 9/27/20111 I.Terechkine for PXIE Cryomodule.
General Considerations for the Upgrade of the LHC Insertion Magnets
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
SIS 300 Magnet Design Options. Cos n  magnets; cooling with supercritical Helium GSI 001 existing magnet built at BNG measured in our test facility 6.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Correctors for the J-PARC Proton Beam Line Peter Wanderer BNL Superconducting Magnet Div. September 8, 2007 T2K US B280 Collaboration Mtg.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Part 2: NbTi Magnet Performance Yury Ivanyushenkov for the APS SCU Team: S. Bettenhausen, C. Doose, M. Kasa, Q. Hasse, I. Kesgin, D. Jensen, S. Kim, G.
HTS and LTS Magnet Design and Prototyping for RAON
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
SLHC –PP WP6 LHC IR Upgrade - Phase I.
HO Corrector Magnets: decapole test and future plans
Yury Ivanyushenkov for the UK heLiCal Collaboration
AEGIS Magnet System.
Development of the Canted Cosine Theta Superconducting Magnet
To be presented at Nb3Al R&D Review,
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
LARP Rotatable Collimators for LHC Phase II Collimation
Presentation transcript:

Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting

What’s Needed Dipole correctors: –Corrector = vertical + horizontal windings, one wound over the other –Three correctors to install + two spares –Overall Schedule: Prototype (= 1 spare) now at KEK #1, #2 – January, February #3 – may be later (depends on #1, #2 actual schedule) #4 – spare  more flexible schedule

Corrector Parameters - NbTi superconducting wire, 0.33 mm Ø (used for RHIC correctors) –  Bdl = 0.1 T·m; L magnetic = 522 mm –B peak = 0.2 T, B quench > 6T  Significant temperature margin for operation –I op = 43A –Inner diameter = 150 mm –Slot length = 800 mm –Located between main magnets  conduction cooling  thick-walled Cu tube

Coil Winding Precision semi-automatic winding machine developed for other projects.

Winding the 1 st magnet

Corrector Status #1: test completed 12/11 – magnet ok #2: construction completed #3: 3 of 4 layers have been wound #4: copper support tube insulated

Completed magnet

First magnet under test

#1 – test results, next steps Operating current: 43A Test results: both coils reached max test current (60A) powered separately and together in both configurations without quenching. Next: warm measurements (finish by 12/31). The shipping crate has been built.

$ and ¥ ¥: KEK to pay $140,000 toward correctors in exchange for equal purchases by T2K in Japan (1  2 correctors) $: $190,000 loan from BNL HEP program for R&D magnets $: T2K DOE construction funds will repay BNL HEP and cover the remaining construction cost

Administrative Summary No major cost overruns or schedule slippage