HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

M.J. LeVine1STAR HFT meeting, Mar 10, 2010 STAR SSD upgrade M. LeVine, R. Scheetz BNL Ch. Renard, S. Bouvier Subatech H. Matis, J. Thomas LBNL.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
HFT Safety --PXL detector September 26, Dana Beavis.
M.J. LeVine1STAR HFT meeting, Sept 27-28, 2011 STAR SSD readout upgrade M. LeVine, R. Scheetz -- BNL Ch. Renard, S. Bouvier -- Subatech J. Thomas -- LBNL.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Project Overview Flemming Videbaek Brookhaven National Laboratory.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
SSD Tasks and Costs Howard Matis October 14,
Engineering Division 1 SSD Mechanics E Anderssen, H Matis, J Thomas LBNL S Bouvier, G Gouilloux Subatech.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
SSD Ritter Review June 20, 2012 Conventional Systems: Cooling, Power Supplies, Cables, and all some of that stuff Jim Thomas Lawrence Berkeley National.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HFT face-2-face F.Videbaek Brookhaven National Lab.
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Jim Fast Pacific Northwest National Laboratory
HFT project Overview and Status March 10, 2010
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
WBS 1.03 Readout Systems Scope, Cost and Schedule
Face to Face Meeting – March 2012 Sarah Morgan
Presentation transcript:

HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD

HFT DOE Review July 17-18, 2012 The SSD is an existing detector  upgrade 2 Existing Detector w/ Si modules Electronics Upgrade in progress Mechanical & Conv. systems … early days

HFT DOE Review July 17-18, 2012 Outline 3 Brief overview of the subsystem Technical Progress since the last review –Construction and Procurement Activity Resources –People and institutions Reviews and Milestones Risk assessment Cost & Schedule Summary

HFT DOE Review July 17-18, 2012 SSD Overview – the SSD sits on the OSC Meters ~ 1 Meter 44 cm 20 Ladders

HFT DOE Review July 17-18, 2012 Progress: Ladder 0 is ready to be surveyed 5 Target on end of wafer (backside) Targets on edges of wafer (front) Reference point for survey and mounting on OSC

HFT DOE Review July 17-18, 2012 DAQ – DDL DAQ room Outer support cylinder South platform VME crate RDO (1 of 8) – Slave FPGA Slave FPGA Slave FPGA Slave FPGA Master FPGA DAQ interface TRG interface VME FPGA Fiber links Ladder cards – VME interface Readout Electronics – the heart of the upgrade 6

HFT DOE Review July 17-18, 2012 Progress: Ladder Card built and tested Prototype with interposer card working since about the time of our previous OPA review A new layout with the improved FGPA traces has been completed. Next Step: Preparing to pass from prototype to pre-production version 7

HFT DOE Review July 17-18, 2012 Progress: ‘Quick’ RDO built and tested Prototype RDO board w/services for 1 ladder A complete RDO board has recently been completed and sent off for fabrication Milestone: Passed from prototype to pre- production version 8

HFT DOE Review July 17-18, 2012 Progress: Slow Controls and Conventional Systems Weihua Yan has developed a slow controls interface to the new Power supplies Working on the more complex problem of JTAG communication to the ladders Prototype quantities of PS and Power modules are in- house 9 Cooling system – vacuum Instrumentation for cooling

HFT DOE Review July 17-18, 2012 Progress: Mechanical Engineering 10 SSD Ladders go here Done: WSC, OSC & ESC To Do: Split the shroud so it is easier to install the SSD ladders Route air in & vacuum out via East end only Ladder mounts Cable and hose routing under the shroud is in progress

HFT DOE Review July 17-18, 2012 Resources and Institutions BNLMicheal LeVineDesign & test, VHDL, ++ Bob SheetzEE on RDO board, ++ John HammondEE layout RDO board Tim CamaradaEE technical work Bob SojaME technical work CEEM / IUCFGerard VisserCables SubatechChristophe RenardEE layout LB, VHDL, ++ Stéphane BouvierSilicon Modules Gerard GuillouxLadder Mechanics LBLJim ThomasConv. Sys. Design & test, ++ Eric AnderssenHFT Mechanical Engineering Joseph SilberHFT Mechanical Engineering TsinghuaWeihua Yan - studentSlow Controls 11

HFT DOE Review July 17-18, 2012 SSD Internal Review – 6/20/2012 SSD Electronics (and other systems) Review –Chair: H.G. Ritter –Committee: Anderssen, Greiner, Schambach, Stezelberger and Visser Charge –Design of Ladder Board –Design of the RDO board –Interface documentation –Test results with prototypes Recommendations (major items) –The LB may proceed from prototype to pre-production step but also recommended new voltage reference and additional tests –The RDO may proceed from the prototype to pre-production step –Create a testing plan specifying which functionality will be tested and how 12

HFT DOE Review July 17-18, 2012 SSD Milestone List 13 LevelMilestone BCP #3 DateActual /Forecast 1CD-4 Approve Project CompletionJul SSD 2SSD Preproduction Design Review of RDOJun-12 (A) 2SSD Production of Ladder Boards ready to beginNov-12Dec-12 2SSD Assembled onto OSC ready for installationAug-13Sep-13 3L3 - SSD RDO Design Finished3/30/12Jun-12 (A) 3L3 - Preproduction Ladder Board PCB Received8/10/12TBD 3L3 - Production RDO Board Received3/22/13 3 L3 - Installation of cooling on STAR platform and Magnet Endcap complete 8/16/13

HFT DOE Review July 17-18, 2012 Risk assessment – selected highlights WBS #Description of RiskMitigationLevel Ladderboard PCB design & layoutSchedule and budget include 3 rd iteration of prototype boards Moderate impact High severity RDO PCB design and layoutSchedule and budget include 3 rd iteration of prototype boards Low impact Low severity Components (chips, DDL) unavailable Procure components as soon as possible Low impact Low severity Slow Controls Software Development Manpower Obtain commitments as soon as possible Low impact Low severity DAQ Production components unavailable Procure components as soon as possible Low impact Low Severity 1.4.3Assembly –if STAR does not roll out in FY13 then IDS not available Complete as many tests as possible – mock up remaining system tests Low impact Low severity 14 = significant progress or reduced risk

HFT DOE Review July 17-18, 2012 Cost and Schedule Summary SSD Costs have not changed much –the estimate has actually been revised downwards slightly since last review Two major procurement (> 50K) still to go. –Power Supply Modules and the associated Crates. Estimate $77K (1/27/2012) but we have reserved $84K for this procurement. –Production Ladder board fabrication originally estimated at $65K. This will almost certainly be < 50 K when final bids are in. We are behind schedule –Testing of the prototype Ladder Board is late and the completion of the design for the pre-production Ladder Board is late –~ 2 month delay which we are still working to resolve –Our schedule can be scrubbed … but clearly the schedule is fragile 15

HFT DOE Review July 17-18, 2012 Summary The SSD upgrade project is clearly defined and the design requirements are understood We have a well developed 3 stage prototype, test and fabrication plan A great deal of progress has been made since last July The coming year will be dominated by fabrication of production electronics, mechanical engineering tasks, integrated testing and software development. Resources necessary for the completion of the project are in hand and, for the most part, readily available The costs are under control; keeping to schedule will be a challenge 16

HFT DOE Review July 17-18, 2012 Backup Slides 17

HFT DOE Review July 17-18, 2012 SSD Location in STAR 18 TPC Volume OFC Outer Field Cage IFC Inner Field Cage SSD Surrounds the PXL & 22 cm radius

HFT DOE Review July 17-18, 2012 Schematic View of the SSD 19

HFT DOE Review July 17-18, 2012 Progress: Mechanical Engineering Cable trays will be installed around FGT planes OSC with shroud and E&M shield installed SSD Specific work not yet complete 20

HFT DOE Review July 17-18, 2012 SSD CD4 Requirements on Dead time Dead-time as a function of random trigger rate –Simulated performance with 3% occupancy The SSD will have 4 buffers as part of the firmware Multiple buffers hide the downstream DAQ from the dead-time of the system for randomly arriving triggers 21 CD-4 requirement < 10% dead time at 500 Hz

HFT DOE Review July 17-18, 2012 Charge for the Review 22