M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O. 2299 Don Pedro Project Relicensing.

Slides:



Advertisements
Similar presentations
2005 Ten Year Summary Report Don Pedro Project FERC Project No Tuolumne River Technical Advisory Committee July 13, 2005.
Advertisements

Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
HOOD RIVER TRIBUTARIES DRAFT AREA WEIGHTED SUITABILITY Presented by: Thomas Gast, Normandeau Associates Presented to: Hood River Water Planning Group Instream.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting March 6, 2008.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
Lindsay Carr, Joey Kleiner, Kinsey Hoffman
Lower Saluda River Instream Flow Study TWC Study Team Workshop December 11, 2007.
Troy Brandt and Pete Gruendike River Design Group, Inc. Corvallis, Oregon Jarvis Caldwell HDR Engineering, Inc. Sacramento, California CONTRACT NO. W9127N-12-D
Thomas R. Payne & Associates Update on Flood Storage Fish Study Presented by Paul Schlenger, Bob Montgomery, Jim Shannon June 15, 2011.
2012 Instream Flow Study Agency Meeting on 2012 Draft Study Descriptions January 24,
Understanding Instream Flow Incremental Methodology (IFIM) Joey Kleiner.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 8, 2010.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
03Nov2006 Revision11 Priority Questions of TID/MID/CCSF Regarding Tuolumne River Salmonids & Macroinvertebrates.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
October 28, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Yuba County Water Agency Yuba.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Reservoir 3-Dimensional Temperature Model.
PHABSIM: A TOOL FOR EVALUATING FLOW REQUIREMENTS IN FLORIDA STREAMS?
Middle Fork Project Relicensing Process Plan April 25, 2006.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Habitat suitability and availability for rainbow trout Oncorhynchus mykiss in the Canyon Reservoir tailrace Greg Cummings.
2005 Ten Year Summary Report Don Pedro Project FERC Project No. 2299
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
McDonald’s Kalender 2009.
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Tropical cyclones movement
February 2007 Note: Source:.
Don Pedro Project Relicensing
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
Session 4: Finalize Project Working Arrangements
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Project Relicensing

Instream Flow Studies: Current Procedural Background  July 16, 2009 FERC Order – IFIM and Water Temperature Modeling Study Plan  Draft IFIM Study Plan provided to Agencies September 3, 2009  Agency comments addressed  October 14, 2009 – Districts filed Final Study Plan with FERC  Agency Follow-Up Comments  May 2, 2010 FERC Order – Study Plan Implementation  Included staff conclusions regarding methodology and test flows  July 21, 2010 FERC Order – Revised Implementation Schedule  December 11, 2010 and July 31, 2011 Progress Reports  April 28, 2012 Final Report Deadline April 20, 2011 Don Pedro Project Relicensing, FERC Project No

Instream Flow Studies: Historical 1981 CDFG IFIM Study  19 transects over primary spawning Reach RM  Flow simulation range of cfs  Site-specific HSC for spawning Chinook salmon 1991 TID/MID Re-Analysis of CDFG Data  Chinook spawning HSC revised, fry and juvenile HSC from literature  O. mykiss fry and juvenile HSC from literature 1995 USFWS IFIM Study  25 transects over RM (23 used)  Flow simulation range of 25-1,200 cfs  Site-specific HSC for Chinook spawning (1991) and fry (1988), with Stanislaus data used for juveniles (1989)  O. mykiss fry and juvenile HSC from literature April 20, 2011 Don Pedro Project Relicensing, FERC Project No

Instream Flow Studies 2011 IFIM Study  40 transects over RM  Flow simulation range of 150-1,200 cfs  Use site-specific HSC for spawning Chinook salmon  Existing literature-based HSC for fry/juvenile Chinook salmon and O. mykiss, with site-specific verification  Effective WUA predictions based on suitable temperatures 2011 High Flow Study  3 sites selected (RM 48.5, RM 48.0, RM 45) for detailed survey  Flow simulation range of 1,000-5,000 cfs  2D modeling of velocity and depth on floodplain  Literature based HSC for juvenile salmon and predators April 20, 2011 Don Pedro Project Relicensing, FERC Project No

Instream Flow Studies April 20, 2011 Don Pedro Project Relicensing, FERC Project No In-Channel IFIM Study Progress Milestones Study Planning and Site SelectionCompleted Aug and Oct 2010 Revised Mesohabitat MappingCompleted September 16, 2010 Cross Section PlacementCompleted November 18, 2010 HSC ConsultationIn progress (essentially complete) Field Data Collection (Hydraulic)July – September 2011* Field Data Collection (Fry and Juvenile HSC)February – June 2012* PHABSIM Modeling/AnalysisSeptember – December 2011 Over-Bank High Flow Study Progress Milestones High Flow Stage Discharge Data CollectionJanuary – June D Hydraulic Modeling/AnalysisJuly 2011 – December 2011 Draft Report for Resource Agency ReviewFebruary 2012 Final Report to CommissionApril 28, 2012