© 2002 Six Sigma Academy ADT Business Unit Results Paul Gillard.

Slides:



Advertisements
Similar presentations
World-Class Sales Organizations
Advertisements

Elevating Professional Services Thoughts for [CEO] on PSO expansion and growth.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 CHAPTER 11 Strategic Control and Continuous Improvement.
Why Market First  We Work with a Retailer’s Call Center or the Market First Preferred Call Center to Maximize their Effectiveness by Offering:  Scripting.
Pwc Performance Measurement Frameworks Acumen Fund - Discussion Document June 16, 2008 *connectedthinking.
FUNCTIONAL LEVEL STRATEGIES - CHPT 4 BUSINESS 189 Spring 2007 DR. MARK FRUIN.
Irwin/McGraw-Hill 1 TN7: Basic Forms of Statistical Sampling for Quality Control Acceptance Sampling: Sampling to accept or reject the immediate lot of.
Business Performance Management (BPM)
Enterprise Resource Planning (ERP) Systems
What is Six Sigma? A goal of near perfection in meeting customer requirements A sweeping culture change effort to position a company for greater customer.
Chapter 8 The Marketing Plan
Total Quality, Competitive Advantage, and Strategic Management
Barry Murash MBBit Nortel 2007
Performance Measures and Management Techniques
Careers in Pharmaceutical Sales Jim O’Bryan Great Lakes Regional Recruiter Field Sales Division Jim O’Bryan Great Lakes Regional Recruiter Field Sales.
Competency Models Impact on Talent Management
Who We Are We enable our customers to gain unprecedented insights to optimize their customer, channel partner, vendor and employee relationships. TheMindSuite.
Building a Mutually Rewarding Partnership [Your Company Name]’s Commitment to Delivering Unequaled Value to [Client Name] (Replace with client logo)
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Marketing Management Module 3 The Marketing Mix.
Lecture 5 - Financial Planning and Forecasting
Turning the change of Globalisation into an Opportunity Understand reality then make reality better.
Changing Commission Structure to Hourly Rates (with potentially Pay- for-Performance)
Linking Economic and Workforce Development: A Regional Sector Approach Bob Sheets Business and Industry Services Northern Illinois University September,
2012 National Agreement An Overview of Key Provisions October 2012.
Cost of Quality - COQ MGMT-5060 Operations Management.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
IE 475 Advanced Manufacturing Costing Techniques
Summary of the U.S. Task Force on United Way’s Economic Model & Growth.
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
Hospitality Management. The Big Problem in Hospitality Poor task and event execution of corporate strategy costs – 2% – 5% of Annual Revenues Analysts.
Introduction to Six Sigma. Learning Objectives The Need for Six Sigma Six Sigma - Vision, Philosophy and Statistical Method Breakthrough Strategy and.
ANALYTICS T H E W O R K F O R C E S T O R Y T E L L E R.
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
HR Practices For I/T Success. THIS REPORT PRESENTS I/S HUMAN RESOURCE PRACTICE RESEARCH FINDINGS WITH THE FOLLOWING OBJECTIVE Understand HR practices.
Workgroup #3 High Impact Energy Efficiency Initiatives John Savage Stan Price.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Executive Case Study Credit Card Declines.
The Balanced Score Card
Aligning HR & Business Strategy. “The long-held notion that HR would become a truly strategic function is finally being realized.”
Measurement Systems. Development of Information Information is necessary for both control and improvement Information derives from analysis of data Data,
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Cost Management Session 3. Overview Theory Exercise: 1.39; 1.42; 1.50;
Investor Presentation November Forward Looking Statements This presentation may contain forward-looking statements which are subject to a number.
Data Analysis Superintendents Trust. Increase test scores and graduation rates through targeted efforts and investments that lead to student success Proactively.
Strategic Plan Development Using KPIs to Develop the Strategic Plan.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Financial Integration With Six Sigma. Project Savings/Review Package Purpose of Project Savings Project Selection Process Financial Impact –Benefit Categories.
Project Selection & Scoping Overview Deb Dixon. 2 Objectives Explain why effective project selection is so critical Project Selection Approach Characteristics.
Six Sigma Demystified Dan Sommers Paul Gillard. 2 Objectives Provide a basic understanding of key Six Sigma concepts and terms Describe the major disciplines.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Financial Assessment Workshop.
Roles and Responsibilities of the Finance Support Team
© 2002 Six Sigma Academy SimplexGrinnell Business Unit Results Rick Scheusener.
© John Wiley & Sons, 2011 Chapter 16: Strategic Performance Measurement Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management Measuring, Monitoring,
© 2002 Six Sigma Academy Tyco Safety Products Business Unit Results Steve Marra.
Management Information Systems Islamia University of Bahawalpur Delivered by: Tasawar Javed Lecture 3b.
Unapplied Cash – Canon & Ricoh Credits, Discrepancy in System Project # Black Belt - Jonathan Williams Division- Service/ Order Entry/Vendor.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Customer Satisfaction, Value and Retention Lecture 2.
HEALTH WEALTH CAREER April 28, 2016 STRICTLY PRIVATE & CONFIDENTIAL The information included in this report is strictly confidential and is proprietary.
1 September 15, 2004 RIFCO INC. Annual Shareholders Meeting Welcome to the RIFCO Inc. Annual Special Meeting of the Shareholders Welcome.
9 - 1 Chapter 9 Management Control Systems and Responsibility Accounting.
B Quality of Financial Reporting FEI/AICPA April 26, 2001 General Electric Company.
1 DEFINE Determine Bench mark Determine Customer requirements Set Baseline Get Customer Commitment Map Flow process.
A Business Leader’s Expectations of HR
Manufacturing and Service Operations
3.5 Presenting HPM to Senior Management
Sixth Power Plan Setting Conservation Targets and Implementation Strategies Jill Steiner, Snohomish Public Utility District Northwest Power and Conservation.
Enterprise Resource Planning (ERP) Systems
Sales strategy Project support overview Presenter's Name
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Presentation transcript:

© 2002 Six Sigma Academy ADT Business Unit Results Paul Gillard

© 2002 Six Sigma Academy ADT US Highlights ~$264 M in observed improvement opportunities identified Business$ RevenueEBITMargin Field SSOs $2.86B$.84B 22 % Five Major Regions (144 Districts/250 SSOs) 16,200 employees Targeted FunctionsAssessment Location Sales (Charlotte) Admin/HR Data (Nashville) Installation (Atlanta) Service(Memphis) Call Monitoring (Jacksonville) National Sales Center (Indianapolis) Distribution (CDC)(Memphis) Dean Seavers Nancy Chisholm Mike O’Reilly Tim Wahl

© 2002 Six Sigma Academy Cost of Poor Quality Heuristic Non Competitive Industry Average World Class % of Sales >40% % % % <1% Dollars Left On Table Sigma Level Defect Free Defects Per Million % 93% 99.4% % % 308,537 66,807 6, Cost of Poor Quality Key Six Sigma Statistics Company Status ? Assumed Most Processes Were Running at Between 4-5 Sigma

© 2002 Six Sigma Academy Poor Quality Changes Behaviors Sigma Scale of Measure Restaurant Bills Doctor Prescription Writing Payroll Processing Order Writeup Wire Transfers Airline Baggage Handling IRS - Tax Advice (phone-in) (140,000 PPM) Best-in-Class Average Company Industry Six Sigma Levels

© 2002 Six Sigma Academy Potential Project List Six Sigma may be leveraged by Tyco recapture dollars left on the table!

© 2002 Six Sigma Academy Reduce Discontinuances (Discos) Problem Statement: 86% RIF retention rate results in severe erosion of ANSC ($323M net of resales). CTQ: (Critical To Quality): Service and product quality. Defect Definition: Undesirable discontinuances due controllable product or service related issues. Project Objective: 93% company wide retention rate. Current Goal: Reduce discos by 50% within residential, Small Business and Core Commercial lines of business. Cost Benefits: $98MM EBIT impact. Internal/External Client Benefits: Improve net income and cash flow Revenue growth. Dependencies: Clear end-to-end view of customer experience. Willingness to make reasonable customer concessions. Ability to drive necessary changes across the enterprise.

© 2002 Six Sigma Academy Margin National Core Commercial ANSC/ ADSC Sales/ Resales Install Service Satisfaction Strategic Goal Business Channels Revenue Drivers Residential Disco’s Project Clusters Billing Response Time Technical Support Drill Down Potential Clusters Training Expectation Management Small Business Residential Service Relocation Product Satisfaction Perceived Value Etc. Monitoring

© 2002 Six Sigma Academy 10 Numerous Potential Discos Drivers Exist Advanced multivariate statistical analyses will be used to quantify and model the direct and indirect effects of hypothesized drivers of customer dissatisfaction

© 2002 Six Sigma Academy Basic Discos Process Map Pending Disco report Voluntary Relocation Non-Pay Collection Effort Disco List Resale Effort Retention Resale Resolution Current Desired

© 2002 Six Sigma Academy Reduce Incoming Alarm Volume Problem Statement: CMC costs have grown in direct proportion to the number of customer accounts under management. Opportunity exists to leverage existing labor and technology to reduce ongoing operating costs. CTQ: (Critical To Quality): Rapid isolation and appropriate response to alarms. Defect Definition: Alarms received by CMC that do not require CMC “action.” Project Objective: Identify causes of and reduce costs (labor & technology) associated with alarms. Current Goal: Reduce incoming alarms and associated calls by 10%. Cost Benefits: $10.9M reduction in handling alarms Internal/External Client Benefits: Improved labor utilization. SSO allocated cost reduction Customer satisfaction Dependencies: Willingness to challenge “current thinking” using hard data. Upstream and downstream process improvements.

© 2002 Six Sigma Academy Margin National Core Commercial ANSC/ ADSC Sales/ Resales Install Customer Behavior Strategic Goal Business Channels Revenue Drivers Residential False Alarm CTQ Flowdown Customer Training Usage Patterns System Configuration Drill Down Potential Clusters TrainingEtc. Small Business Residential Service Equipment Associate Training Signal Processing Monitoring

© 2002 Six Sigma Academy End Process Call Monitoring Overview Diagnose Signal Call Home,Fire, Police etc. Incoming Signal (ADT & Dealer Installed Systems) Action Required? Need to identify the key drivers and make necessary, installation, service, monitoring and/or technology adjustments. Yes No

© 2002 Six Sigma Academy ADT Six Sigma Considerations Strengths –Commitment and readiness to implement six sigma –Willingness to challenge tradition and status quo Opportunities –Leverage improvements across all SSOs –Leverage call centers more effectively –Aggressive management of disconnects, resales and false alarms –Selection, testing and career development –Workforce management (turnover, compensation and resource allocation) Recommendations –Target the “big picture” opportunities consistent with business vision –Process standardization across the entire ADT enterprise –Inventory management –Address goal alignment issues to incent desired behaviors Obstacles –Ability to identify and engage high performers –Timing, ongoing priorities and competitive pressures –Existing goal alignment and incentives that do not reward across silo-thinking –Systems integration