Fermilab 02/01/07NFMCC on MCTF Magnets1 Magnet R&D… through the MCTF Michael Lamm.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
February 24, 2007MICE CM171 6D MANX A Muon Cooling Demonstration Experiment; How it might fit with MICE. Tom Roberts Muons, Inc.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
Status of CEPC Detector magnet
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Qingjin XU Institute of High Energy Physics (IHEP)
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
Aug 9, 2008S. Kahn -- HCC Magnet Plans1 HCC Magnet Future Plans Steve Kahn Aug 9, 2008 NFMCC Friday Meeting.
HTS R&D for High Field Magnets
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
MCTF Fermilab’s Muon Collider Task Force. MCTF - Shiltsev 2MCTF The need Charge/deliverables Current activities Research Directions/Org Structure First.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
S. Gourlay 7/19/01 T2 Working Group Summary T2 Working Group Summary Magnet Technology: Permanent Magnets, Superconducting Magnets, Power Supplies Conveners:
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
1 Muon Collider Task Force Formed in July’06 by FNAL Director: “… the Muon Collider represents a possible long term path for extending the energy frontier.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
Magnet R&D for Muon Beam Cooling at FNAL Alexander Zlobin Fermilab Muon Collider Design Workshop, BNL December 1-3, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Fermilab AAC MCTF 08/08/07MCTF Hardware Plans1 MCTF Hardware Development Plans Michael Lamm Focus on Support for Muon Collider Magnets at Fermilab.
Helical Solenoid Development
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
MANX and Muon collider progress Katsuya Yonehara Fermi National Accelerator Lab DPF2006, Honolulu, Hawai’i October 30 th, 2006.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Muon Collider 6 D Cooling Model Magnets M. Tartaglia Technical Division, Magnet Systems Dept. Fermilab MAP Aug. 26, 2011M. Tartaglia1.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
Magnet Strategy Michael Lamm Technical Division/Magnet Systems Department Fermilab Muon Accelerator Program Review Fermilab, August 25, 2010.
Generic technology development - High field magnet R&D
SLHC –PP WP6 LHC IR Upgrade - Phase I.
SC Quadrupole Magnets in ILC Cryomodules
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
Superconducting Helical Solenoids
Q0 magnet, cooling, support ideas
HTS Magnet R&D at BNL Ramesh Gupta November 17, 2017.
Beam-Induced Energy Deposition Studies in IR Magnets
Muon Collider Magnet Technologies/Challenges
Muon Collider SR and IR Magnets
as a prototype for Super c-tau factory
Review of Quench Limits
Presentation transcript:

Fermilab 02/01/07NFMCC on MCTF Magnets1 Magnet R&D… through the MCTF Michael Lamm

Fermilab 02/01/07NFMCC on MCTF Magnets2 MCTF Magnet Effort Support specific magnet project for 6D Cooling Demonstration –Helical Cooling Channels and Matching Sections* Longer Term Magnet R&D –50 T Solenoid* –Next generation Helical Solenoid (future Muons Inc SBIR) –Collider and IR magnets? –Provide Coordination for Muon Magnet Program for Fermilab Muon Experiments –Interface with AP and Detector groups –Coordinate activities with other magnet laboratories (BNL, FNAL, LBNL, NHMFL, Muons Inc.) *Called out in MCTF charge and primary R&D focus

Fermilab 02/01/07NFMCC on MCTF Magnets3 FNAL Superconducting Magnet Program All phases of accelerator magnet development, incl. superconductor R&D test and support Long history of SC magnets (Tevatron, SSC, Fermilab/LHC IR quads…) Present primary focus is on Nb3Sn Quadrupoles for LHC IR upgrade, as part of LARP, but also, HINS, ILC, Muon Collider and Tevatron support Projects such as Muon Magnets R&D depends heavily on Fermilab base support for SC Magnet R&D –Provides for infrastructure support –Provides salary and M&S support for R&D beyond project scope

Fermilab 02/01/07NFMCC on MCTF Magnets4 Helical Cooling Channel Cooling Channels proposed by Muons Inc for MANX experiment. Time scale for demonstration: 2010 Solenoid, with superimposed helical quad/dipole filled with low Z material can reduce 6D emittance Recent work by Vl. and Va. Kashikhin+ K. Yonehara present two practical designs for MANX muon cooling demonstration. (see Yonehara talk) SBIR have been submitted to carry this program to cooling channels suitable for full scale muon collider

Fermilab 02/01/07NFMCC on MCTF Magnets5 Plan for Production Helical Solenoid FY06 –Tracking studies –Two designs under consideration FY07 –Complete Design Comparison/Design Decision –Build “engineering model/demonstration coil” to test concept –Design Specifications, conceptual design, and Prototype plan presented in Sept 2007 report FY08 –Complete Engineering Design –Bids placed, prototype built in Industry –Test (in sections) at Fermilab Magnet Test Facility –Preproduction Review FY09 –Production Magnets order placed –Installation in Muon Cooling Experiment as available through 2010 Outlined in MCTF proposal…based on a proposed level of support…..

Fermilab 02/01/07NFMCC on MCTF Magnets6 Large Bore Option SEE ASC 2006 Publication: Kashikhin et al, 1LL07

Fermilab 02/01/07NFMCC on MCTF Magnets7 Helical Solenoid The solenoid consists of a number of ring coils shifted in the transverse plane such that the coil centers follow the helical beam orbit. The current in the rings changes along the channel to obtain the longitudinal field gradients. One can see that the optimum gradient for the helical solenoid is -0.8 T/m, corresponding to a period of 1.6 m.

Fermilab 02/01/07NFMCC on MCTF Magnets8 Concept Decision in FY07 Issues for making designs: Heavily dependent on (un)certainty about the design of the experiment –Small bore design is modular, less expensive to build and test. Large bore design is easier to adapt once built. Conceptual design work on matching sections Resource loaded schedule for magnet system including mechanical design, cryostat design, quench protection, etc. to estimate labor/M&S for each design General consensus is that small bore option is the preferred solution

Fermilab 02/01/07NFMCC on MCTF Magnets9 Design Tasks in FY07 Mechanical Designs for coils structure (small bore segmented solenoid option) 5cm multiturn stack of hardway bend NbTi cable (LHC IR), potted? shrink cylinder for radial forces Mechanical support for longitudinal compression Sets of coils locked into transverse tracks to withstand expected 300kN longitudinal (end) and 200kN transverse restoring force Helium vessel 4 meter long x 1 meter diameter cylinder Goal to build demonstration coil (s) + support this year Electrical design- linear longitudinal decrease in field accomplished by: Separate PS (5-10 kA systems, each with separate controls etc..) or segmentation by cold diodes Nested PS (multi small current leads) Coil density (reduces modularity)

Fermilab 02/01/07NFMCC on MCTF Magnets10 Design Tasks in FY07 Cryo-issues Coils + beam space in same Helium volume… How does design match MTA cryo plant? Expected max static heat load ~ ten Watts.. No appreciable beam issues.. Multiple power leads (if needed) have to be laid out Lots of LHe dead space.. Need displacer system to reduce helium volume Quench Protection.. 4 MJ stored energy Coils will be coupled Dependent on coil powering Regardless, adjacent segments are magnetically coupled We have experience with this LHC cable: should be easy to model (MIITS, quench velocity etc..) Is external extraction circuit or heaters needed?

Fermilab 02/01/07NFMCC on MCTF Magnets11 Superconducting Coil Test Facility Number of circular sections 3 Middle section removable Inner section diameter 400 mm Inner coil diameter 420 mm Outer section diameter 500 mm Center section shift in transverse Y direction 60 mm Coil length along Z 50 mm Coil total current 262 kA Conductor current 10.5 kA Coil number of turns 25 Force in Z direction 353 kN Force in Y direction (middle coil) 234 kN Superconducting coils can be tested using Vertical Dewar at FNAL Magnet Test Facility Test Stand with 30 kA power supply, quench protection and computer control systems. Stand has 600 mm inner bore diameter. Helical Solenoid Forces Section N Fx, kN Fy, kN Fz, kN Coils shifted 55.5 mm in radial direction, Frmax=196 kN

Fermilab 02/01/07NFMCC on MCTF Magnets12 Three Coils Set Coil centers: X, mm Y, mm Z, mm Quench Protection/Characterization -use energy extraction circuit -instrument with voltage taps -middle coil instrumented with “spot heaters” Magnetic Field measurements -Hall Probes

Fermilab 02/01/07NFMCC on MCTF Magnets13 How this is accomplished in FY07 Yonehara/Kashikhin/Kashikhin continue to validate two designs + matching section Practical details of how this magnet would be designed. (ie. Cable vs strands, mechanical support, alignment, cryostat) Additional 0.5 FTE of existing staff + ? Contract designer Work with TD/Test and Instr. Dept. on testing plans Coil(s) can be tested in vertical dewar Cable from LHC IR quads is available but need to purchase all other materials for demonstration coils Progress beyond paper studies requires additional $$$ beyond base budget

Fermilab 02/01/07NFMCC on MCTF Magnets14 50 T Solenoid See talks by Palmer and Kahn Proposed for end of cooling channel for final emittances 50 T DC, 30 mm aperture, 1-2 m length Superconducting for manageable power reqs –HTS or HTS/Nb3Sn/NbTi hybrid Beyond present capabilities (has never been attempted) –Proposals to built T HTS solenoids –Conceptual design studies performed with Muons Inc. in collaboration with BNL.

Fermilab 02/01/07NFMCC on MCTF Magnets15 Conceptual design of 50 T solenoid ongoing, Kahn Muons Inc. and Palmer/Gupta at BNL See EPAC06 WEPLS108 Interest in HTS for high field solenoids NHMFL has developed 5 T HTS insert, for 25T solenoids Muons Inc has pending SBIR’s on HTS application to magnet design Fermilab, BNL and LBNL experience on conductor and small coils “2212 day” workshop organized by Tollestrup & Larbalestier November 6, 2006

Fermilab 02/01/07NFMCC on MCTF Magnets16 Outline for MCTF 50 T Solenoid Up to and Including FY06 –Significant work done by Muons Inc. on Magnet Concept –Muons Inc supported work on HTS materials at Fermilab –Prepare plan for Sept 2006 report FY07 –Focus on Material Studies, available materials, relation to magnet design –1-5 T insert(s) suitable for SC R&D lab 16 T or 17 T Teslatron or BNL SC conductor test facility –Present Status of Feasibility Study and Conceptual Design as part of Sept 2007 report FY08 –Material Choice(s) –Develop Measurement equipment for Feasibility Study –Lower field prototype to study Design Feasibility ? –Engineering Design??? FY09 –?

Fermilab 02/01/07NFMCC on MCTF Magnets Effort on 50 T R&D Evaluation of HTS Materials –BSCCO 2212 wires/cable –We have requested samples of BSCCO and YBCO tapes from conductor vendors Mechanical/electrical probe design and construction –Tensile strain –Field orientations HTS coil insert designs –1-5 T insert(s) suitable for SC R&D lab 16 T or 17 T Teslatron Investigate possible collaborations/cooperations with NHMFL, BNL, Muons Inc and others….to develop long term strategy

Fermilab 02/01/07NFMCC on MCTF Magnets18 Other magnet related work MCTF Proposal calls for magnet effort at LBNL on Collider Dipoles Design studies for muon collider dipole (open midplane vs. absorber ) Open midplane dipole made from existing Nb3Sn coils Unlikely to perform studies without additional support Gupta et al “Optimization of Open Midplane Dipole Design for LHC IR Upgrade” PAC07

Fermilab 02/01/07NFMCC on MCTF Magnets19 Magnet Conclude Fermilab continues to work with Muons Inc to make Helical solenoid with ~2010 delivery date –In FY07 need to develop detailed plan which leads to delivery of helical solenoid. 50 T Solenoid with FNAL, BNL and Muons Inc. Work focused on materials for first year. Goal to make 1-5 T insert suitable for ~15 T Teslatron with 77 mm bore. –FY07 will be a year of studying HTS materials, building a collaboration to coordinate long term effort Need requested additional resources to make progress past paper, especially if Helical Cooing Channel required in 2010