May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.

Slides:



Advertisements
Similar presentations
Substation L1/ MCC L1 Update March 21 st, Current Location.
Advertisements

Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Outages During the Run Coping with the Power Company August 9, 2012.
GIS Helps Americus Respond to Tornado March 1, 2007.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
Muon Campus Controls Update Brian Drendel 8/6/13.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Maintenance and Accelerator Support RHIC Start Up 12.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Texas SET Version 3.0 Production Implementation Plan.
PIP Status Report Linac Startup plans 12/05/2012.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
F All Experimenters' Mtg - 07 Jul 03 Week in Review: 06/30/03 –07/07/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
PIP Status Report Linac Startup plans 12/05/2012.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Friday July 16, 2010 John Anderson Page 1 Shutdown 2010 ES&H Enclosure Access  Linac Remains on enclosure interlock key series. RWP’s in.
Brian Drendel September 11, Funding and Deadlines Muon Campus Controls  Controls plan for existing buildings  Controls plan for new buildings.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Questions to automatic workshop. 13 BLs financed Another 5 under discussion MAX IV status: Injector linac running since May GeV ring under commissioning.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
CUB Outage Schedule April 21, 2006.
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
Presentation transcript:

May 06, 2013 Photo by Greg Vogel

Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding. Mitigation protected critical assets, but clean up and recovery took several days Rainy Day Activity Re-cap

Shutdown 2012 Machine Status:  NTF Treatments as scheduled  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster TeV & Muon Rings – Partially available for tours with approval and appropriate training

MSS Bypass Project

MSS Bypass Project – Impact Areas  CDF & Industrial Building Saturday, April 13th – Weekend outage from Put a cap on a “y” splice Cable pulls and splices in PMH 21  Booster Tuesday, April 23 rd – Friday, April 26 th (No machine operation) No power outage (Move to Feeder 42) Cable pulls and splices in PMH 61  Linac Tuesday, April 23 rd – Friday, April 26 th (machine may operate) No power outage (Move to Feeder 43) Cable pulls and splices in PMH 61  CHL ~7 day outage (only house power available) Not expected until June Cable pulls and splices in PMH 210  Meson To be proposed – 10 minute outage Not expected until June Cable pulls and splices in PMH 110 Impacts MCC, Holometer, MW9, all enclosures, systems, and buildings  CDF & Industrial Building Saturday, June ?? – Weekend outage from Reconnect a “y” splice

External Beamline PMs  Substation maintenance for NL-10 4/25: Lab B compressor room  Substation maintenance for NL-10A 5/2: 0800–1200 Lab E, Lab F and Portakamp 176  Substation maintenance for NL-11 5/9: 0800–1200 Lab B

Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - ANU - Proton Source - l

MSS Bypass Project – To Do List  Master Sub Station Multi-Colored Air Switch installation which includes excavation for new duct bank and terminations in manholes. ○ The new duct bank crosses several existing duct banks which means the feeders running through the existing duct banks may need to be powered down. Feeder 46B fault has complicated this work. ○ Areas we know it will affect Excavation is being done without expected power outages CHL, Industrial Building, CDF, C0 Need to coordinate with CHL & MICE Meson Areas Booster – no outage but can’t run accelerator Linac – no outage and will be able to run

Order 51,61,21,110,210