HERA Operation 2004 M. Bieler, -MPY- PRC, Mai 2004 - Performance Improvements in 2004 - Remaining Problems - Improvement Program - Schedule 2004.

Slides:



Advertisements
Similar presentations
Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
F.Willeke: HERA, 58th PRC Report from HERA 58 th Physics Research Committee Meeting at DESY October 28, 2004 F. Willeke, DESY Summary of the 2004 Proton.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Detector Backgrounds in the HERA ep-Colldider F. Willeke, BNL October 9, 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Short Review HERA Run 2002 / 2003 Luminosity Polarization Backgrounds Shutdown Activities Plans for Restart Report on HERA 64th Meeting of the DESY PRC.
RUN COORDINATOR’S REPORT 1-8 May 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 8 May 2006.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
HERA Running 2005 F. Willeke, DESY 60 th Meeting of the DESY PRC November Luminosity Polarization Backgrounds Improvements Technical Issues.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Luminosity expectations for the first years of CLIC operation CTC MJ.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Neutral Current Deep Inelastic Scattering in ZEUS The HERA collider NC Deep Inelastic Scattering at HERA The ZEUS detector Neutral current cross section.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
HERA Status Joachim Keil, DESY (MPY) 59 th Meeting of the Physics Research Committee May 26 th, 2005.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
D.Trines PRC Status of HERA and Strategy Time table of re-commissioning August 01 Re-commissioning of Proton ring September e-ring October Luminosity.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
Preparation Phase of the FAIR Project
PETRA III, Status and Upgrade
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Large Booster and Collider Ring
Run period of summer 2012 Zoltán Fodor
HERA Status F. Willeke, DESY 61th DESY PRC Meeting May
Recent Electron Cloud Studies at CESR and Future Plans
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Potential Use of PEP-II Magnets by Project X
The Fermi National Accelerator Laboratory is a U. S
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
HERA 54th Meeting of the PRC October at DESY
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Future HERA High Luminosity Performance
Machine Operation and Progresses in SSRF
Thursday 24th January - morning
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Tuesday 22 November 2011.
Collider Ring Optics & Related Issues
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Tuesday
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Presentation transcript:

HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004

Performance Improvements in 2004 Beam Currents Until March the Proton Beam Current was limited due to Radiation Safety Issues. Best Values until now: 103 mA 920 GeV, 47 mA 27.5 GeV.

Performance Improvements in 2004 Peak Luminosity has increased to

Performance Improvements in 2004 L sp ≈ ≈ 90% design

Performance Improvements in 2004 Peak Lumi per Day: 1 pb -1 Peak Lumi per Week: 5pb -1

Integrated Lumi 2000 and 2004 Since January 2004 the Lumi Production Rate is comparable with 2000, since April 2004 it is considerably better.

Performance Improvements in 2004 Measures to improve HERA Performance: - Streamlined Procedures (Positron Ramp directly into the Lumi File, ZEUS Calorimeter 12 GeV,…) allow use of high Positron Currents. - Collision first at H1, then at ZEUS (to avoid Beam blow up). - Correction of Beam Tilts individually in ZEUS and H1. - Phase Trombone (Adjustment of Betatron Phase Advance in both ZEUS and H1 to compensate Beam- Beam Effects).

Performance Improvements in 2004 Background Rates at ZEUS and H1 have decreased to tolerable Values. H1

Performance Improvements in 2004 Polarisation reaches 40% regularly with 3 Spin Rotators on and Collisions. During long, quiet runs Polarisation can be tuned up to 50%. A faster Polarimeter would be useful for faster Tuning.

Remaining Problems Now that the Luminosity Goals are within Reach and the Background Problems are solved, the main Problems are - Reliability and Availability of all Components (some Components are as old as PETRA) - Efficiency of Operation (Experienced Operators have retired, new Operators have Tasks on new Projects and no Connection to HERA)

Remaining Problems Measures to improve Efficiency of Operation: - Enhanced Operator training - Improved Communication (Shift Briefings) - More Software Support for Operations - Continue daily Operations Meeting with all Groups

Remaining Problems Critical Systems in Terms of Support, Expertise or Manpower: - Quench Protection - Proton RF Systems - Warm Magnets - PETRA - Timing and Low Level RF

Improvement Program: Rich Program with 70 Items, the most important ones being: - Proton RF Systems - Injection Systems - Collimation Systems - Diagnostics Systems - RF-Controls - Vacuum System - Power Supply Systems - e-RF Systems - Cryogenic Systems Improved low-level Controls, Suppression of long. Instability Improved monitoring, vertical Excitation Kicker Increased Reliability Improved Monitors (BPM, SR) p-RF Freq. Control, etc Better Pumping in RF Sections Add‘l PS for Spin Matching RF Modulator Upgrade Compressor and Controls Upgr. Sum: 2.26 M€

HERA Schedule 2004 Lumi Run until Aug. 16 Shutdown until Oct. 8 - Yearly Safety Tests - Exchange of BU Coils - Exchange of 1 cold Quad - Prepare for Electrons Switch to Electrons during Restart (HERA would prefer a long, stable Run with Positrons) Lumi Run in November