ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
ODOT's Environmental Site Assessment Process
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
PLANNING, PRODUCTION & REAL ESTATE ACQUISITION. Acquiring Contaminated Properties In past, ODOT has acquired contaminated properties when the amount to.
Phase I Environmental Site Assessment
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
ENVIRONMENTAL SITE ASSESSMENTS OHIO COMMUNITY DEVELOPMENT CONFERENCE JENNIFER MILLER NOVEMBER 7, 2012.
ENVIRONMENTAL SITE ASSESSMENT SCREENING. Use May only be used for projects with no ROW, deep excavation and BUSTR sites only ◦ May not use for projects.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
What is a Feasibility Study (FS) and an Alternative Evaluation Report (AER)? ENVIRONMENTAL UPDATE MEETING NOVEMBER 20, 2014 HEATHER MCCOLEMAN OES MAJOR.
ENVIRONMENTAL SITE ASSESSMENT SCREENING. Purpose First step in ODOT’s ESA Process Identifies all sites in project Use hard data to screen the project.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Ohio Department of Transportation ODOT Training & Environmental Prequalification Requirements questions to:
Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client.
1 California State University, Fullerton Chapter 13 Developing and Managing Information Systems.
What is a project? Project Management Institute definition
Phase Difference = Phase Difference = 0.05.
Computer System Analysis
PLANNING, PRODUCTION & REAL ESTATE ACQUISITION. Acquiring Contaminated Properties In past, ODOT has acquired contaminated properties when the amount to.
Remediation of soils contaminated with oil (petroleum or fuel oil) N ° 6 Romina Gónzalez Q., Eva Soto A. Environmental Civil Engineer, Playa Ancha University.
GENERAL INFORMATION FOR ODOT ENVIRONMENTAL SITE ASSESSMENT INVESTIGATIONS.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
©2011 Ben Keet 1 Case Studies Contaminated Land Sheep-dips & Orchards Drs. Ben Keet FRSC Geo & Hydro – K8 Ltd
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
Creating and Managing Tribal Transfer Stations January 2012.
Consideration of Brownfields and Contaminated Properties During NEPA 2014 Real Estate Workshop.
The PDP and Decision-Making
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
THE TWO-POHASE METHOD & THE BIG-M METHOD IENG511 Optimization Theory.
Freeway Planning Process Michelle Bitner Project Manager Kern Council of Governments.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
What are Brownfields? EPA 2012 Brownfields Community-wide Assessment Grant Arizona Route 66 Coalition.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Illustrative Fund Investment Review Process Environmental and SocialFinancial Phase I Does the project meet pre-established Environmental and Social Criteria,
Protecting Cultural Sites Shoshone-Bannock Tribes Environmental Waste Management Program By Zannita Armell.
ASTM Standard Practice for Assessment of Vapor Intrusion Into Structures on Property Involved in Real Estate Transactions: Status Report presented by Anthony.
ASTM E1527 (Phase I Environmental Site Assessments) ASTM E1528 (Transaction Screen Process) ASTM 1903 (Phase II Environmental Site Assessments) ASTM Standards.
Proposed Plan for No Further Action
THE SUPERFUND PROCESS Assessment and Listing
Environmental Site Assessments
مراجعة عامة.
بسم الله الرحمن الرحیم.
Environmental Issues Mapping Field Lab
CERCLA 128(a) Tribal Response Program Site Specific Work: Introduction
EPA Brownfields Grant.
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Regulated Materials Review
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
I-85 Corridor Light Rail Transit Feasibility Study
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
JLEIC Accelerator R&D Meeting
White Flint North Entrance Feasibility Study
Approaches to Pollution Prevention
Presentation transcript:

ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS

ESA Project Initiation Project Path 1Path 2Path 3Path 4Path 5 ESA Project Initiation Package Preliminary Engineering, Task 1.2.C.C, if necessary Preliminary Engineering, Task 1.2.C.C Preliminary Engineering, Task 1.2.C.C

No ROW ESA Screening Path 1Path 2Path 3Path 4Path 5 No ROW ESA Screening Step 1 - For Engineering, Task 2.2.D - For projects with no ROW, but deep excavation, petroleum contamination only Preliminary Engineering, Task 2.2.D - For projects with no ROW, but deep excavation, petroleum contamination only N/A

ESA Screening Path 1Path 2Path 3Path 4Path 5 ESA Screening Preliminary Engineering, Task1.2.C.C, if necessary Preliminary Engineering, Task1.2.C.C

Phase I ESA Path 1Path 2Path 3Path 4Path 5 Phase I ESAN/AEnvironmental Engineering, Task 3.1.D – conducted on preferred alternative Environmental Engineering, Task 3.1.D – conducted on Feasible Alternative(s)

Phase II ESA Work Plan Path 1Path 2Path 3Path 4Path 5 Phase II ESA Work Plan N/A Environmental Engineering, Task 3.1.Q – Conducted on Preferred Alternative

Phase II ESA Path 1Path 2Path 3Path 4Path 5 Phase II ESAN/AEnvironmental Engineering, Task 3.1.Q – Conducted on Preferred Alternative

ODOT’S STEPPED ESA PROCESS

Path 1 Projects

Path 2 & 3 Projects

Paths 4 & 5