2010 ROADWAY CONFERENCE 1R PROGRAM Steven Lindland.

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
2009 Roadway Conference April 20, 2009 Cathy Nelson, Technical Services Manager / Chief Engineer.
Technology Efforts Related to Asset Management Integration Presented to the Institute of Navigation GNSS 2011 Conference By Laura Wipper, Asset Management.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Corridor Management Strategies Pilot in Region 4 Findings and Recommendations Reported to HMT May 2013 By: Martin Matejsek, Laura Wipper, Steve Lindland.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Safety Conversation: NLTAPA Conference Michael S. Griffith Director Office of Safety Technologies Federal Highway Administration.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
Impacting Local Government Updating Functional Classification Using GIS September 12, 2013 Bentonville, Arkansas.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
ODOT STIP Process and Funding Jerri Bohard –Planning Section Manager –Transportation Development Division Jeff Scheick –Northwest Region Manager –Highway.
Presented by: Jerri Bohard, ODOT Transportation Development Division Administrator Paul Mather, ODOT Highway Division Administrator Travis Brouwer, ODOT.
Statewide Transportation Funding At Risk Your Name or Agency Date RTPA RCTF.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Update on Historic Bridges MaryAnn Naber Federal Highway Administration June 17, 2008.
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
June 2011 Statewide Traffic Engineers Meeting Interstate Guide Sign Upgrade Projects.
Bureau of Materials and Research 2014 AASHTO RAC/TRB Annual Meeting High Value Research Sweet 16 Ann Scholz, P.E., Assistant Research Engineer
Tender Packages (Consistency with Current Design Bulletins) Basic Knowledge for Roadway and Bridge Projects Seminar for CEA Members Edmonton February 12,
Module 13: Highway-Rail Grade Crossings (HRGC)
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
All Roads Transportation Safety (ARTS) Program Kevin J. Haas, P.E. Traffic Investigations Engineer, ODOT February 26, 2015.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
Roadway Safety Data – What Is It and Why Should It Be Important to My State? Name Date.
Trail Funding Sources & General Information
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
Ron Hall Tribal Technical Assistance Program Colorado State University
2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
UCLA Lake Arrowhead Symposium Transportation and the Recovery Act.
RALPH COMER TENNESSEE DEPARTMENT of TRANSPORTATION January 19, 2010 THE ASSOCIATION OF GOVERNMENT ACCOUNTANTS TDOT's Approach to Economic Stimulus Funding:
1 Asset Management Steering Committee Quarterly Meeting December 14, 2009.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation Planning Process Freight Transportation Planning Workshop July 11, 2001.
2 nd Quarter SFY 14 1 PDLT Measures & Information October - December 2013.
2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland.
Subcommittee on Maintenance Activity Report October 15, 2013 Carlos Braceras Chair, Subcommittee on Maintenance.
1 Asset Management Integration Section Overview April 2010 Presentation for Roadway Conference By Asset Management Integration Section (AMI)
ODOT STIP Process and Funding Jerri Bohard –Planning Section Manager –Transportation Development Division Steve Leep –Program and Funding Services Manager.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
Highway Fatalities A National Health Crisis Highway Designers Can Help Turn Around By Anthony Kane Director, Engineering and Technical Services American.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Digital Highway Measurement System Qatar Ministry of Transportation August 15, 2007 Dr. Kunik Lee Chief Safety Scientist, Office of Safety R&D TFHRC, FHWA,
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Capital Plan Update FMCB Meeting February 26, 2016 Pre-Decisional – Draft for discussion only.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
ARRA Update and lessons learned. Recovery Act in Oregon: By the Numbers 600 lane miles of state highways paved600 lane miles of state highways paved $494.8.
April 4, 2011 ITE Technical Conference Lake Buena Vista, Fl Implementation of AASHTO’s Manual for Assessing Safety Hardware (MASH) 2016 Update from the.
0 Freight Activities: Year in Review Dec. 12 th 2015.
Oregon Freight Plan Amendment
Issaquah-Fall City Road
COACT ODOT Update September 13, 2018.
FHWA Safety Perspectives: Implementing ARRA and SAFETEA-LU
COACT ODOT Update May 9, 2019.
ADA Transition Plan – Brief Overview
Presentation transcript:

2010 ROADWAY CONFERENCE 1R PROGRAM Steven Lindland

1R Technical Bulletin

1R Program u Pave Mainly –Single Lift Non-structural Inlays, Single Lift Non-structural Overlays, Inlays & Overlays with a Design Exception. Can’t Make Any Safety Features Worse. u Statewide Strategic Approach to Highway Features Normally Upgraded by 3R Projects u $6 M 1R Safety Fund for Traffic Barrier Upgrades u Roadside Inventories Essential to Maintain Data in Asset Inventories for Strategic Planning.

1R Program – What’s New? Cathy Nelson’s November 24, 2009 Memo u Approval of 1R Projects: Region Roadway, Pavement Services and FHWA u Tracking of 1R Projects - Roadway Engineering u Roadside Inventories – using FACS-STIP Tool u 1R Project shall only address paving and impacted features – unless other funds used u E&C limited to 20 percent

1R Program – What’s New? Steve Lindland’s December 10, 2009 Memo u 12 ARRA Projects Needing Roadside Inventories u Roadside Inventory - Feature List and Data List u FACS-STIP Tool for Roadside Inventories u Send Completed Inventories to Laura Wipper, AMI Manager and Steve Lindland, Roadway u Inventory Completion Date for ARRA - June

1R Program – What’s New? u Majority of Project – 75 percent u Structural Overlays - up to 25 percent. Need to address ADA Ramps at Intersections affected. u Concrete Pads at Intersections - Need to address ADA Ramps at Intersections affected. u Paving Approaches – no u Bridge Rail Inventory Completed - $380 M for Substandard and $50 M for High Priority Rails u Bridge Rails – probably $1 million per year u 1R Projects added to PS&E Checklist

1R Projects To Date 12 ARRA Projects 5 STIP Projects 27 ARRA 2 Projects

Questions