Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Solar Probe Plus A NASA Mission to Touch the Sun Andy Driesman.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
NASA’s Goddard Space Flight Center LRO SRR Project Management.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus – A Mission to Touch the Sun Rob Decker and Nicky Fox Johns Hopkins Applied Physics Laboratory.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
SPP EVMS and Science Investigation Team Participation
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
SPP Spacecraft Emulator (SCE) Introduction
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
Serving the people of Cumbria Do not use fonts other than Arial for your presentations Commissioning, Procurement & Contract Management Staff Engagement.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Test-as-You Fly SpaceWire for Solar Probe Plus
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Wide-Field Imager for Solar PRobe Plus (WISPR)
TEMPO Instrument Update
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
0.0 Instrument Suite Name Presenter’s name
CONTOUR NGIMS Electronics Test History
Instrument Overview Larry Springer HMI Program Manager
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Solar Probe Plus A NASA Mission to Touch the Sun Andy Driesman and Ed Reynolds October Project Wide Monthly

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Agenda  Meeting purpose  Near and future happenings  General Areas of Concern  Risk update  Mass and power trends  Critical Path  RFA Status  Investigation Updates 2

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Reminder of Meeting Purpose  Monthly Telecon Sequence 1 st Friday of the Month: Project Wide Meeting 2 nd Friday of the Month: Multi-Instrument Technical Interchange 3 rd Friday of the Month: Multi-Investigation PI/PM Telecon 4 th Friday of the Month: Science Working Group Telecon 5 th Friday of the Month: None  Monthly/Quarterly Instrument Management meeting have been added.  Project Wide Meeting  Open to the team at large.  Intent is to provide a forum for information to flow from the Project as well as the Program Office and NASA/HQ-SMD.  Provide high-level insight into the investigations.  Opportunity to ask questions. 3

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Near and Future Happenings  Near Term Happenings:.  Semi-Annual NASA-HQ Review: 9 Oct 2012  Quarterly Reviews/EVM Road Shows:  WISPR: completed  SWEAP: Quarterly complete, EVM: 29 Oct 2012  FIELDS: 15 Nov 2012 (Quarterly and EVM)  ISIS: 17/25 Oct 2012 (Quarterly/EVM)  Far (and very far) Term Happenings  Mid-Phase B SRB Status Update: 13 Feb 2012 (tentative)  EVM Pilot Program starts: Mar 2013  C/D Proposal Activities: July

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Area of General Concern  Invoicing (cost) variances are have grown and then stabilized. * Numbers are cumulative ** Spacecraft discrepancies are mostly due to spacecraft subcontracts  Aug/Sept data new since last Project Wide Monthly  However:  Phase B is >32% complete. Trends appear to be stabilizing.  Started regular monthly subcontracts meetings to review cost vs. plan  Question: How much of the deficit is under-spending and what’s the plan to make up for it? 5 NASA WBS ItemMayJunJulAugSep 5.0Payload/Instruments2%-14%-37%-53%-49% 6.0Spacecraft-14%-12%-24%-23%-25%

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Top 10 Risk Matrix 6 Changes since last month: SPP-23, PSE model for hardware in the loop simulator – closed on 9/6/2012 SPP-24, Redundant Electronics Module (REM), Redundant Process Model (RPM) breadboard for the hardware in the loop simulator – closed on 9/6/2012 SPP-29, Upper Stage Staff Support – mitigation steps have been completed, this risk was accepted on 9/6/2012 SPP-46, ASIC ECU vs. Standard ECU – closed on 9/6/2012 SPP-49, Availability of Goddard TVAC 238 Facility – closed on 9/20/2012

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct Mass and Power Trends * Power margin is minimum margin for driving configurations

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct SPP Critical Path

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Action Item Burndown 9

10 ISIS Status Update EPI-Hi: LBNL (diode fabrication) and Caltech (thinning) received first prototypes made with flight processes preliminary tests (I vs V, C vs V, alpha particle response) look reasonable prototype detectors with 15 μm active thickness to be tested in detail at Caltech EPI-Lo: Quadrant vs. Octant Testing Designed and build octant and quadrant versions of anodes Preliminary testing shows similar performance for both boards Confirms baseline design is sufficient

Technical meeting held at MSFC to prepare for SPC beam tests in Solar Wind Facility High voltage SPC cable prototype characterized in vacuum furnace First IMAX projectors and optics bench arrived at SAO for installation in front of vacuum chamber (Solar Environment Simulator) Aluminum version of SPC Thermal Test Model 1 (TTM-1) assembled, fabrication started on version with high temperature materials SWEAP September Activity Highlights - Requirements, prototypes for key electronics in SPAN, SWEM, SPC - Planning for operations, flight, and ground software - SPC TRL6 Activities

WISPR status Phase B risk reduction and preliminary design proceeding as planned Attended joint SPP-SO splinter session at the 5 th Solar Orbiter Workshop in Brugge, Belgium Completed trade study on electronics architecture for the WISPR IDPU –Maintain baseline in which APL will provide the IDPU to interface with the WISPR camera electronics Procured glass samples for dust impact testing at MPI for Nuclear Physics, Heidelberg from October 15 – 25 –Test will validate dust impact and stray light modeling carried out by APL and NRL –Results will inform project-level decision on single telescope versus two-telescope design trade _WISPR_Quarterly Review 13

Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Questions?? 14