Design of Belt Conveyors Step #3 Checking Out the Power ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt.

Slides:



Advertisements
Similar presentations
How to utilize your iTunes for use with your SwiMP3 Please be aware that all the SwiMP3 line of players do not have licensing to any of the songs that.
Advertisements

JQuery MessageBoard. Lets use jQuery and AJAX in combination with a database to update and retrieve information without refreshing the page. Here we will.
Clicking on the link for the.tns file gives you will get the following screen: Select Save File and click OK.
 A word processor is a computer that can be used for writing, editing and printing text.  We are going to use a word processing package called Microsoft.
Picking a Suitable Truck © Dr. B. C. Paul 2000 Revised 2009 Hi!
Parts and Functions of a Conveyor System ©2012 Dr. B. C. Paul Note- These slides include figures and tables taken from the Conveyor Equipment Manufactures.
Tips for New Mac Users 20 simple tips to make using a Mac quicker and easier.
Design of Belt Conveyors Step #2 Getting a Belt Profile ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt.
PRIMARY, SECONDARY & QUANTITATIVE RESEARCH TASK HYPERLINK APPLICATION PROCEDURE 1.
An Example of Drawing Hard Rock Room and Pillar in MineSight ©2012 Dr. B. C. Paul Note – The screen shots in these slides come from the program MineSight.
Roads in MineSight.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Click your mouse for next slide Dreamweaver – Merging, Coloring, Fonts Now it’s time to fill your page with some more interesting stuff The first thing.
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 11 1 Microsoft Office Excel 2003 Tutorial 11 – Importing Data Into Excel.
ABC’s of PowerPoint (Office 2007) Part 1: Basic Vocabulary Part 2: Cursors Part 3: Insert Your Text Part 4: Insert Your Pictures Part 5: Basic Tools &
Pumps for Slurry © 2012 Dr. B. C. Paul Note – These slide illustrate a solution approach using Sysel, a program developed by GIW and contain screen shots.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
Power Point Presentation - Advanced Julia J. Stahl Distributed System Specialist.
Digital Camera Picture Transfer One Example of Moving Files from a Camera to the Computer’s Hard Drive By Bob Fiske.
What to do when you are done. PRINTING WITH PHOTOSHOP.
Checking for Traction Problems ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are common practice in industry and can be found in.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Checking for Tire Heating ©2009 Dr B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
PowerPoint 1 The Basics 1. Save this file to your Apps Folder as YourLastName_PP1 2. Read each slide. 3. Complete each set of numbered directions.
Copyright 2007, Information Builders. Slide 1 WebFOCUS Maintain – Enhancing Objects with JavaScript Mark Derwin Information Builders Information Builders.
PHP meets MySQL.
CAD3D Project. SketchUp - Project Create a new SketchUp project called InitialsXX where the XX are your first and last initial. Use the Rectangle tool.
Introduction to Arrays. definitions and things to consider… This presentation is designed to give a simple demonstration of array and object visualizations.
Obtaining Information From the Geologic Block Model
Open Dreamweaver Start All programs Adobe design and web premium Adobe Dreamweaver.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Selecting, Formatting, and Printing a finished Report…….
Computerized Tillage System Calculator Help Manual Created by: Jake Walker, Aaron Weinhold, Adam Duff Agricultural Systems Management Copyright 2004 Purdue.
Teacher’s Assessment Assistant Worksheet Builder Starting the Program
Teams who run this, year E BB T B F TE SS CC Iso Right (start here)
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Introduction to PowerPoint Curriculum Implementation Day Friday, November 3, 2006 K.J. Benoy.
How to Create a Document in Google Drive By Tressa Beckler.
Hi, Learning Skills Students! This is Slide 1 of your Power Point Instruction for this class. After reading each slide, make sure you: 1.Follow the instructions.
1 What to do before class starts??? Download the sample database from the k: drive to the u: drive or to your flash drive. The database is named “FormBelmont.accdb”
Creating a Web Site Using 000webhost.com The 000webhost.com Site You will be required to create an account in order to use their host computer 000webhost.com.
Change in your CAD Project File - it happens all the time in robotics.
Downloading and Installing Autodesk Inventor Professional 2015 This is a 4 step process 1.Register with the Autodesk Student Community 2.Downloading the.
Making Python Pretty!. How to Use This Presentation… Download a copy of this presentation to your ‘Computing’ folder. Follow the code examples, and put.
Unit 1 – Improving Productivity Instructions ~ 100 words per box.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
I want to do SQL, I start as if I am doing a regular query.
When I want to work with SQL, I start off as if I am doing a regular query.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
Typing and Formatting a Research Paper WORD 2013.
Basics of Building a Truck and Loader Fleet ©Dr. B. C. Paul 2000, revised 2008,2009 Note- General steps and methodologies found in these slides roughly.
Pit Reserves and Resources in a GSM ©2012 Dr. B. C. Paul This presentation involves the program MineSight created by Mintec and contains screen shots taken.
Know your computer Make a Folder Copy from Word to Composer Format the Font Change the Alignment Format the Background Format the Colors Insert a Picture.
Standard Toolbar Formatting Toolbar Paragraph Indent Markers Formatting Font Style And Font Size Setting Indents Paragraph alignment Paragraph And Line.
Slopes in MSOPT Calculations ©2012 Dr B. C. Paul Note – These Slides are based on and include screen shots from the program MineSight by Mintec. Credit.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
Action Buttons Link to another place in your presentation Link to web pages, videos, etc. Interactivity – gives the viewer a choice of what happens next,
 You can fix any verbal/visual errors  To make it more interesting by adding transitions and music  To be able to add it to your My Big Campus online.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Introducing Scratch Learning resources for the implementation of the scenario
Why use PowerPoint? Attracts attention Motivates DynamicAnimated Visual.
HOW TO USE OFFICE 365 ONEDRIVE
Poster Title 108pt Arial Bold
بسم الله الرحمن الرحيم.
A few tricks to take you beyond the basics of Microsoft Office
Navigating NEIU Blackboard 417 – 418a
Presentation transcript:

Design of Belt Conveyors Step #3 Checking Out the Power ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt Analyst” by Overland Conveyors. Credit for program and interfaces are given to Overland Conveyors. Procedures taught and many tables used were developed by the Conveyor Equipment Manufactures Association. The author also referenced previous notes developed by the author.

Let Check Out Motor Sizes, Belt Type and Brakes Our Belt is 503 lbs per inch width (the way belt strength is measured) – it runs a 88% of rated Strength. We have a 250 HP motor that runs at 72% of name-plate This shows the stress profile on The belt over the entire length

Belts That Roll Up and Down are Tricky There maximum stress may not occur at The drive pulley and may move around Depending on how the belt is loaded.

We Will Have The Computer Check Horsepower While the Belt Loads and Unloads I went to the motor tab I drop the Edit Menu I Select Loading On the side I Select Carry On the sub-sub Menu I order to Load up and then Unload the belt.

Step By Step Simulation Sets Up I have ordered it to pause if I Overload by motor, belt, or Take-up so I can see the Condition and take action.

It Steps Through Loading and Unloading

During Load On Simulation My motor which had a steady state load Of 72% reached 92% My belt which had an 88% steady state Load at one point reached 97% I did not need brakes at any point.

I Simulate the Conveyor Unloading Again everything checks out Ok

Lets Check Out Only Inclines Loaded

Looks Like We Are In Tolerance

Only Declines Loaded

Life is Still Looking Good

We Could Try Some Other Things If this were a decline I could play with temperature since it impacts friction What happens if I get sloppy on my maintenance with rollers and alignment? What happens if I end up with about the same volume on the conveyor but I end up cutting a lot of roof?

I’ll Go to My Idlers Page

I Will Allow User Access to All Database Parameters

I’ll Go After Alignment and Seal Drag

Now Theres a Piece of Well You Know What Maintenance

Oh My Gosh! If it stalls in this condition I never get it started Belt at 114% (if it were new It might not break) Motor at 123% - your dead Take-up at 116%

Step Up the Belt Pick the belt Icon on the Left Allow User Access to Data Base Pick the Next Belt Duty Up

Go To The Motor This time there is not a database Of common sizes.

Common Motor Sizing From 75 to 150 in steps of 25 hp From 150 to 500 in steps of 50 hp From 500 to 700 in steps of 100 hp From 750 up in steps of 250 hp

I’ll Put a 300 on It

I’ll Set the Take-Up to 23,000

My Worst Case Run I’m at 102% and 103% - I’m fairly sure I can live with that.

If I Wanted to Try My High Roof Rock Scenario On material tab Set Density to reflect High roof rock content Set the tons per hour to reflect what You think you would produce if you Were cutting a lot into roof.

Well Now the Time Has Come to Shoot the Engineers and Start Production Under Profile we can find our belt length and idler spacings.

On the Idler Tab We Can Find the Number of and Ratings for Our Idlers

On the Belt Tab We Find the Belt Type and Length

Under Drive We Find Motor Size, Speed and Lagging for the Drive Pulley

Under Pulley You Find the Size and Lagging for Your Pulleys

And a Little Graphics Bonus Right click on the conveyor Profile and it offers you 2D or 3D graphics.

Might Get a Little Coolness for Your Presentation to the Board

A Side Comment Sometimes for long runs of big lifts (such as a slope) you may need to dual drive –Dual drives allow you more wrap than you can get with one drive –Can also spread out your motor horsepower If the drive motors are together at one service location the secondary drive motor will be much lower HP than the primary

If You Need to Go Dual Drive On profile if you click insert drive it will put in a 2 nd (or 3 rd ) drive

Now to Include You Your Unit Project –Your coal mine has a slope from a depth of 800 feet. –Design a slope belt conveyor to bring up 1700 tons per hour Provide me with a supply list –How much belt of what width and rating do you need? –How many carry and return idlers of what specification and rating do you need? –What size and lagging do you need on how many of what type of pully? –What size and speed of motors do you need.

Continued Explain to me how your conveyor is laid out and what you did to make sure your conveyor could handle any foreseeable duty Provide a copy of Belt Analyst file or files (in case you cannot get to the top with just one conveyor)