Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.

Slides:



Advertisements
Similar presentations
BENDING MOMENTS AND SHEARING FORCES IN BEAMS
Advertisements

Chapter-2 Parts of Steel Bridge.
LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
2.2 STRUCTURAL ELEMENT BEAM
An-Najah National University Faculty of Engineering Civil Engineering Department Graduation Project Foundation Design for Western Amphitheater of Nablus.
An-Najah National University
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Chp12- Footings.
Lecture 9 - Flexure June 20, 2003 CVEN 444.
SEMINAR IN ADVANCED STRUCTURE analysis and design of box culvert
VOBUG Conference August 3 rd, 2010 Nashville, Tennessee Robert LeFevre, P.E. Adam Price, P.E. Tennessee Department of Transportation Structures Division.
PIPE CULVERT By CH. VENKATARAMAIAH.
Earthwork Operations & Equipments
Shear and Diagonal Tension
Lecture 15- Bar Development
SHEAR IN BEAMS. SHEAR IN BEAMS Example (4.1): A rectangular beam has the dimensions shown in Figure 4.12.a and is loaded with a 40 ton concentrated.
Abstract This project is a structural analysis and design of a residential building located in JENIEN City, The building is consisted of 7 floors. The.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
AASHTO LRFD Section 11 Abutments, Piers, and Walls
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Thailand Water Supply System Project By: Stephen Bonk (Team Leader) Kevin Dischino Joseph Moore.
GABION PRESENTATION.
Reinforced Concrete Design II
EXAMPLE 9.2– Part VI PCI Bridge Design Manual
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
You Should Know Bulletin No. 135 © ACPA All Rights Reserved.
Group N Chris Jones Ella Feekins Nikoline Hong
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Details of Construction Lecture-2 “Shallow Foundation”
I. Truss Bridge Gussets Background
6 th International Workshop on Micropiles Tokyo, Japan, August 24-27, 2004 Development of ADSC-FHWA Micropile Teaching Module into NHI Course Dr. Donald.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Department of Civil Engineering,
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
Preparing Foundations for Cylinders & ASME Tanks
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
Structures: Design and construction of stream crossings
Tom Canfield Engineering Technologies and Design POE Medina County Career Center 1/3/2011.
Strength of Material-1 Introduction. Dr. Attaullah Shah.
JSC CTC Metallokonstruktsiya Corrugated structures.
Bridge Hydraulics and Geotechnical. BRIDGE HYDRAULICS AND GEOTECHNICAL TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 The Hydrological.
Structural Loads.
Airplane Hangar Design The design of a steel-framed airplane hangar Matthew Klein Edward F. Cross School of Engineering, Walla Walla University, College.
AR362 - Structural Systems In Architecture IV Lecture : Foundations
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
DESIGN AND CONSTRUCTION GUIDELINES
Review of Indian Seismic Codes
Design Aides for Concrete Masonry Members
Replacement of Vehicle Bridge over Spring Creek
Development of ADSC-FHWA Micropile Teaching Module into NHI Course Dr
Replacement of Vehicle Bridge over Spring Creek
Faculty Of Civil engineering department BMCET,SURAT.
Mohamed AL-Habib (ID: ) Omar G. Abdullah (ID: )
{Graduation Project} An-Najah National University
CFHT Pier Building Evaluation
BRIDGES MOST IMPORTANT GEOTECHNICAL EFFECT- LIQUEFACTION
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
ABCD What’s New In Bridges
IWM 2000 Turku, Finland Pasi Korkeakoski
American Concrete Pipe Association Short Course
Project Purpose & Description
Foundation Design of Law and Media College
AASHTO LRFD Section 12 Standards
Replacement of Vehicle Bridge over Spring Creek
Graduation Project Bracing system for deep excavation.
Presentation transcript:

Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement Sizes: European sizes: 6, 8, 10, 14, 16, & 20 mm Available Construction Equipment: Front –end loader, simple hand-held tools Additional Concerns: There is a field of large granitic boulders that makes app. 300 meters of the road leading up to the site impassable to most vehicles. Conclusion  The concrete pipe culvert solution was found to be infeasible. The final design is a double box culvert.  Final design dimensions and reinforcement of the culvert and gabion wing wall are shown in Fig. 2 – 4. Results  The Structure was designed for a maximum positive moment of 10 k-ft and a maximum negative moment of 7 k-ft.  Only one size of reinforcement was used for flexure in all members to reduce the need for cutting.  The Soil was found to be type A2-5, good bearing soil.  The 28-day strength of the concrete mix used in the region is 1500psi.  SCB was found to be most economical pavement solution at $121,660 per mile. Future Directions A concrete mix shall be designed and tested as a replacement for current mixing practices in the area in order to raise the strength of the concrete. The structures could not be designed according to code at a strength of any less than 3000 psi. Continuing communication and cooperation with all involved parties will be necessary to eventually implement these proposed solutions. Abstract In Wum, Cameroon, a seasonally flooding stream has become an impediment to industry and social progress in the surrounding area. A permanent crossing structure, especially one that can sustain vehicular traffic, would facilitate the exchange of goods between the villages and open the way for a planned cooperative village-wide cash-crop project that has since been put on hold. The area in which the structure will be built poses challenging constraints, as only locally available materials and skills may be used. Two alternative designs were created under guidance from the AASHTO LRFD Bridge Design Manual to cross the 400 cfs stream, a reinforced concrete pipe culvert and a reinforced concrete double box culvert. The double box culvert was found to be more economical and simpler to execute. References AASHTO LRFD Bridge Design Specifications, 4 th edition with 2008 Interim Revisions Concrete Pipe Association Concrete Pipe Design Manual Wight, James K. & MacGregor,, James G.; Reinforced Concrete Mechanics and Design, 5 th e Hibbeler, R. C.; Structural Analysis, 7 th e Methods Geotechnical  Soil Samples from the site were tested to explore soil conditions. The soil was classified using the AASHTO Classification System.  All structural solutions were investigated for settlement and bearing capacity of the underlying soil  The wing walls (as cantilever walls) were investigated for external stability under static and seismic loads using AASHTO LRFD Bridge Design Specifications,  The slopes leading down to the bridge site were analyzed for global stability using WinStabl, to assess whether the additional traffic loads expected as a result of the bridge’s construction will cause stability issues. Concrete / Pavement  A concrete mix similar to that used in the region was created and tested for 14- and 28-day strength.  The following solutions for paving of the route from the main village to the crossing site were investigated using FHWA Standards:  Rigid (Concrete) Pavement  Flexible (Macadam) Pavement  Cement Modified Soil (CMS)  Soil Cement Base (SCB)  Methods for removal of large obstacles and diversion of river flow for construction were explored. Structural  Two alternative solutions using reinforced concrete were investigated, a pipe culvert and a double box culvert.  Concrete Pipe Culvert: Pipe designed using Concrete Pipe Association’s Concrete Pipe Manual, Indirect Design Method.  Double Box Culvert: Structure designed according to AASHTO LRFD Bridge Design Specifications, Software analysis was performed using RISA, hand analysis was performed using the Moment Distribution Method. Where applicable, reinforcement was designed for combination flexure and axial load. Figure 1: Current Temporary Foot Bridge Figure 3: Reinforcement Details Figure 4: Wing Wall Dimensions Figure 5: RISA diagram of moment envelope created by applied loads Figure 2: Design Dimensions Figure 6: Concrete Cylinders After Compression Testing for 28-day Strength