Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.

Slides:



Advertisements
Similar presentations
Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Advertisements

Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
The CDCE BNL HEPIX – LBL October 28, 2009 Tony Chan - BNL.
Cooling Product Positioning
1 Northwestern University Information Technology Data Center Elements Research and Administrative Computing Committee Presented October 8, 2007.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Business Continuity Overview Wayne Salter HEPiX April 2012.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Data Centre Power Trends UKNOF 4 – 19 th May 2006 Marcus Hopwood Internet Facilitators Ltd.
IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Remote Hosting First Experiences Wayne Salter (with input.
CERN IT Department CH-1211 Genève 23 Switzerland t The new (remote) Tier 0 What is it, and how will it be used? The new (remote) Tier 0 What.
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
Transforming B513 into a Computer Centre for the LHC Era Tony Cass —
Lyndonville Electric Department Feasibility Analysis Review December 2,
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
Physical Infrastructure Issues In A Large Centre July 8 th 2003 CERN.ch.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
CERN IT Department CH-1211 Genève 23 Switzerland t Tier0 Status - 1 Tier0 Status Tony Cass LCG-LHCC Referees Meeting 18 th November 2008.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Nikhef/(SARA) tier-1 data center infrastructure
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Data Center Facility & Services Overview. Data Center Facility.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Energy Savings in CERN’s Main Data Centre
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Computer Centre Upgrade Status & Plans Post-C5, October 11 th 2002 CERN.ch.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF SINDES Secure INformation DElivery System CERN IT/CF-ASI.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN IT Facility Planning and Procurement HEPiX Fall 2010 Workshop.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
West Cambridge Data Centre Ian Tasker Information Services.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Dell EMC Modular Data Centers
Update on the PSB Cooling and Ventilation Systems
CMS Centre Project - Green Light Meeting
Remote Hosting Project
CERN Data Centre ‘Building 513 on the Meyrin Site’
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Olof Bärring LCG-LHCC Review, 22nd September 2008
Cooling systems for HL-LHC (WP17.3)

Presentation transcript:

Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November 2010

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Overview Current status of CERN Computer Centre (CC) –Layout, powering and cooling Current issues and anomalies Aims of the upgrade project Proposed project –Layout, powering and cooling Project schedule and status Summary CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Overview Designed and built in early 1970s Fully refurbished around 2000 –Increased power and improved cooling Nominal current capacity: 2.5MW (including 240kW of critical power) Extended (usable) capacity: 2.9MW (including 340kW of critical power) forfeiting redundancy for all UPS systems On-going project to: –Increase the nominal capacity to 3.5MW/600kW with N+1 redundancy –Address some issues/anomalies CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Main Computer Room CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Cold aisle is cold! CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current Status of CERN CC Main computer room (1600m²) –Air cooled racks –~1.9MW ‘Vault’ (1400m²) –Mixture of air cooled and water cooled racks + tape robots –~640kW Room for back up data in separate building (200m²) –Mainly tape robots with air cooling –~ 30kW Two Telecoms rooms –CERN Internet Exchange Point (CIXP) ~ 10kW Two types of equipment both on UPS –Physics with a single power feed but no diesel backup –Critical with dual power feeds and diesel backup CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Power and Cooling 3 physics UPS, each with 4*400kvA modules + 1 critical UPS with 2*300kVA modules Air cooled installations: –IT & Telecoms equipment (capacity up to ~2.5MW), technical areas (mainly UPS rooms)... and offices –(3+1) Chillers not secured by UPS nor diesel –Pumps and AHUs secured by diesel but not UPS –Water-tank for stored cooling capacity (a few mins) Water cooled installations: –For IT (physics) equipment (capacity up to 800kW) –(1+1) Chillers not secured by UPS nor diesel –Pumps secured by (physics) UPS –Water-tank for stored cooling capacity (~10 mins) CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current Issues and Anomalies Cooling for critical UPS room insufficient Mixing of critical and physics equipment –Location and cooling No cooling of CC when running on UPS and insufficient stored cooling capacity when on diesel Insufficient critical power available Approaching the limit of available power for the building No redundancy for critical UPS Usage of full ‘available’ 2.9MW implies loss of redundancy for physics UPS A/C of CC coupled to adjacent office building CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current Power Situation CERN Computer Centre Upgrade Project - HEPiX November IT Physics Equipment IT Critical Equipment Physics UPS (4*) Diesel Generator (N+1) Critical UPS (2) 340kW 2.56MW 2.9MW Normal Network *N+1 redundancy sacrificed to achieve 2.9MW

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Main Computer Room CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Vault CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project - HEPiX November Backup Building

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Primary Goals of the Upgrade Project Solve the cooling issue for the critical UPS room –New UPS systems in a different location Increase critical UPS capacity to 600kW Increase overall power capacity to 3.5MW Restore N+1 redundancy for both critical and physics UPS systems Secure cooling for critical equipment when running on UPS and extend stored cooling capacity for physics when on diesel Decouple the A/C for CC from the adjacent office building CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Power Requirements CERN Computer Centre Upgrade Project - HEPiX November IT Physics Equipment IT Critical Equipment Physics UPS (4+1) Diesel Generator (N+1) Critical UPS (3+1) 600kW 2.9MW 3.5MW Normal Network Cooling for IT Critical Equipment

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Approach Barn area of CC building to be converted to house: –3 Electrical rooms –An IT room with water cooled racks to house critical equipment (up to 450kW) –New ventilation systems for the critical area of the main computer room New ventilation systems for the Telecoms rooms will be installed in adjacent offices A new partially sunken building for additional chillers and a storage tank for the cooling of the critical areas An additional storage tank for extending the stored cooling capacity for physics equipment CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Areas Affected Presentation Title - 16 Barn Reduced Critical Area Telecoms Rooms New CV room Two new transformers Future expansion for Telecoms RoomsNew AHUs

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - I CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - II CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - III CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - IV CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - V CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - VI CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Layout - VII CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Schedule and Status All Market Surveys already launched RFPs in process of being released ‘Barn’ cleared of IT equipment end of October ‘Barn’ to be cleared of electrical and other installations end of 2010 Adjudication of contracts at March FC CE works to be completed July 2011 EL+CV installations Aug/2011-May/2012 Increased physics power available March 2012 and increased critical power June 2012 CERN Computer Centre Upgrade Project - HEPiX November

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Summary CERN CC was not designed for today’s IT equipment Major upgrade already performed in 2000 Further upgrade in progress: –To maximize the capacity of the CC –To resolve some outstanding issues Increased capacity to be available mid-2012 Last increase in capacity foreseen with today’s technology Other solutions will be required for any future increases in required computing capacity CERN Computer Centre Upgrade Project - HEPiX November