July, 2002CMS Tracker Electronics1 APV25 wafer testing Outline Mark Raymond, Imperial College Wafer test procedure speed improvements.

Slides:



Advertisements
Similar presentations
ASSESSING THE NATIONAL ENTRIES Brian Walker
Advertisements

1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
Chapter 10 Section 2 Hypothesis Tests for a Population Mean
Analysis of chip with 100 events, July 2001 Variation in pixel to pixel average ADC values (fixed pattern noise) Pixel ADC value event to event repeatability.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher Cross Talk issues with APV25 Electronics Uniformity.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
Comparing ZS to VR David Stuart, UC Santa Barbara June 19, 2007.
April, 2003CMS tracker electronics1 APV25 Production Testing Status Mark Raymond, Imperial College Outline Yield studies current status of ongoing investigations.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
E. Noah, CMS Tracker Week, January 2003 APV Power Dependence on Trigger: First Observations on Hybrid Effect first observed in Strasbourg and reported.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
October, 2004CMS Tracker Week1 APV settings at cold temperatures Objective: provide recommendations for APV I2C settings for cold operation, for test beam.
ITOP carrier amplifier test at Indiana University G. Visser 4/27/2015 (latest update) I use the recently (here) characterized JT0947 ch3 as input source.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
STAR Microvertex Upgrade Meeting, Strasbourg, April Status of sensors from the engineering run AMS-035 OPTO Wojciech.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Mark Raymond /10/051 Trip-t testing brief status report test setup description - hardware and software some very early results.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 APV25 I 2 C parameters Brief reminder of what the I2C registers do (from User Manual) Check on integration centre currently used parameters: TIB/TOB/TEC.
February, 2004CMS Tracker Week1 Sensor Stability Measurements Objective: find simple method of observing sensor stability -> measure fluctuations in overall.
C. Seez Imperial College November 28th, 2002 ECAL testbeam Workshop 1 Pulse Reconstruction Worth considering the experience of other experiments using.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
INFO 636 Software Engineering Process I Prof. Glenn Booker Week 9 – Quality Management 1INFO636 Week 9.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Some Thoughts about Hits, Geometry etc Rob Kutschke, Hans Wenzel Fermilab March 13, 2007.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
LONG TERM STUDY OF SKID RESISTANCE ON IN-SERVICE ROADS IN ENGLAND. Chris Kennedy, John Donbavand and Ramesh Sinhal.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
October, 2001CMS Tracker Electronics1 Module studies at IC OUTLINE laboratory setup description, APV I2C settings pulse shape studies (dependence on ISHA,
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
January, 2003CMS Ecal1 MGPA Specification Discussion – 9 th Jan. 03 OUTLINE 3 or 4 gain channels discussion technical background - why 3 gains could be.
1 some high rate measurements at IC Mark Raymond attempt to re-produce CERN high-rate behaviour in the lab at IC a few new (I.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
The medipix3 TSV project
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
NOISE MEASUREMENTS ON CLICPIX AND FUTURE DEVELOPMENTS Pierpaolo Valerio.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
28/11/02Guy Dewhirst1 Ultra Light Weights Method Guy Dewhirst Imperial College London.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
CMS Tracker Electronics
Update on Noise Analysis of the DHCal Test Beam at Fermilab
Meeting at CERN March 2011.
APV25 Production Testing & Quality Assurance
Sensor probing (Summary)
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

July, 2002CMS Tracker Electronics1 APV25 wafer testing Outline Mark Raymond, Imperial College Wafer test procedure speed improvements feedback from hybrid tests Wafer test results update on results/problems with production lots received so far summary of current position on yield investigations

July, 2002CMS Tracker Electronics2 Wafer test speed improvements Wafer probe test speed now optimised at ~ 70 sec./site (~ 6 hrs/wafer) allows 2 wafers/day throughput Speed improvements achieved by: reducing any excessive averaging utilising on-chip CM correction to speed up pulse shape mapping =>pulse shapes for all channels can be acquired in two cal runs/mode only 64 chans with cal pulse 64 chans without cal pulse use average of 64 chans without Cal pulse to calculate CM correction

July, 2002CMS Tracker Electronics3 Feedback from hybrid tests M.Poettgens few chips showing large pedestal variation with pipeline location e.g. chip #1614 from wafer JRCSA0T why not showing up during wafer probe?

July, 2002CMS Tracker Electronics4 Wafer test probe data for suspect chip wafer test data for chip #1614, wafer JRCSA0T no obvious problem, pipeline scan flat (rms pipeline peds/channel low) but CM subtraction applied during pipeline scan, so any effect which mimics common mode will not be picked up (appears to be case here) test designed to be sensitive to individual pipeline cell pedestals stuck high/low

July, 2002CMS Tracker Electronics5 chip 1614 Histogram average channel noise for all good chips on this wafer -> single channel sticks out channel noise acquired while triggering single pipeline column => not sensitive to large pipeline CM effects solution modify wafer test to include cut on excessive CM baseline shifts during pipeline scan can apply test to all future wafer tests and can re-scan any uncut wafers – should be quick if run just this test only (~10 secs/site => 1hr/wafer) average channel noise compare suspect with other chips on same wafer JRCSA0T

July, 2002CMS Tracker Electronics6 APV25 wafer testing status Update on previous info presented in May CMS electronics week see first 10 engineering wafers (September, 2000) all diced, ~1300 KGD still available at IC 2 production wafer lots delivered January: 48 ordered, = 45 delivered shortfall of 3 (rejected by manufacturer QA) processing problem – these 2 lots returned to manufacturer 3 rd full lot launched to provide remaining shortfall of 3 (25 wafers/lot) 3 wafers delivered mid Feb., remaining 22 requested and delivered in March 3 further lots launched to investigate process problems (75 wafers in total) 45 replacement wafers (from 2 lots) now received

July, 2002CMS Tracker Electronics7 Results from 1 st 2 production lots Lot 1 -> low yield (17 – 36 %) some good chips around periphery circular area of good chips in centre ~ even split between digital and analogue failure modes Lot 2 -> lower yield (1 – 21 %) similar circular pattern but no good chips in centre manufacturer notified via CERN (F.Faccio) investigation launched early acknowledgement of likely process problem example wafers returned and investigated a problem identified with silicide layer (gate/source/drain contact layer) these lots now replaced

July, 2002CMS Tracker Electronics8 Results from 3 rd production lot average yield 79% some wafers -> v. high yield others good but still show pattern 36 chips in incomplete reticles now excluded from yield calculation (previously not the case) 94% 73%

July, 2002CMS Tracker Electronics9 Results from replacement lots Lot A2C17000N5Lot A2C19Q00N5 33% 47% maps here for wafers with average yields failure patterns and types of failure generally similar within a particular lot some lot-to-lot differences

July, 2002CMS Tracker Electronics10 Results from all lots so far 82% 27% 10% 79% 33% 47% 1 st 2 “silicide” lots 3 rd lot replacements for “silicide” lots Yield histograms/lot for all wafers tested so far (average yields in green) clear lot to lot differences ~ consistent picture within lots replacement lots processed with extra checking after silicide steps – no problems observed but these lots not giving highest yield circular symmetry to failure patterns => processing problems still present and silicide defects not whole story eng. lot

July, 2002CMS Tracker Electronics11 Yield investigations/discussions with manufacturer brief summary of discussion during 0.25  m User Group Meeting – June 17 th problem not confined to APV wafers, 3 other HEP designs have also seen similar effects but manufacturer’s volume production not affected any common features in HEP designs? not obvious but long metal lines are possible common feature -> antenna effect (ESD sensitivity) although we are well within design rules v.large”handcrafted” layouts unusual in industry, metal layers auto-filled to higher density our metal layers less densely filled (still within design rules) -> possible under-etching? general conclusion exact cause of problem still unclear work in progress CERN test structure to investigate above theories in preparation examine test results in conjunction with layout looking for evidence to validate theories – inconclusive so far, but still ongoing

July, 2002CMS Tracker Electronics12 Tested chip availability present chip (KGD) availability 1300 remaining chips from engineering run wafers diced from 3 rd lot 5100in waffle packs now KGD on remaining uncut 3 rd lot wafers +6300KGD on replacement 45 wafers (assuming we keep) currently in-hand 3 wafer lots launched to replace 1 st two and investigate problems so more available

July, 2002CMS Tracker Electronics13 Conclusions Wafer test protocol speed improvements now allow 2 wafers /day feedback from hybrid tests will allow any loopholes to be plugged Wafer probing process problems with first two production lots – attributed to silicide problem wafers returned and replaced communication channel (via CERN) to manufacturer effective manufacturer’s response very constructive and helpful throughout 3 rd lot yield back at expected high level (average 79%) replacement lots not maintaining high yield (33% and 47%) and not silicide reasons for low yield not fully understood – more work in progress