Kevin Behm – Addison County Regional Planning Commission Kevin Behm – Addison County Regional Planning Commission Community Build-Out Analysis August 8, 2006
Kevin Behm – Addison County Regional Planning Commission Community Build-Out Analysis August 8, 2006
Community Build-Out Analysis Development started in 1999 as a part of the Community Planning Tools Demonstration Project funded by Sen. Leahy’s Office and administered by the Center for Rural Studies at UVM. Center for Rural Studies has provided additional funding to improve the program over the past 5 years. Operates as an extension to the ESRI GIS program ArcView 3.2
What is a Build-Out? A build-out analysis predicts the maximum potential for development based on town policies and zoning bylaws as well as environmental or geographic constraints to development. WHY? A planning tool to assess the consequences of existing and proposed planning and zoning practices.
Existing zoning
Build-out under existing zoning Existing residential – 611 Potential development with no development in wetlands, floodplain, or forest districts
DRAFT zoning Low density district changed from 5 acre to 10 acre Forest District changed to Conservation to include hilltops and steep slopes
Build-out under draft zoning Potential residential development – 1546 vs. current zoning of 3263 units
Build-Out Status All parcel/zoning combinations are symbolized with a build-out result No existing house and under the minimum lot size ( 1 unit added) Under the minimum lot size Density removed using a layer Density allowed but houses must be relocated off of layer Density reduced using a layer and fewer houses shown
Compare build-out results - spatial Development density changes Polygon symbology changes Existing zoning Draft zoning
Compare build-out results – export to spreadsheet Draft zoning Existing zoning residential units – 3263 Draft zoning Residential units –1546 Existing zoning
Methodology – Data Needs Uses existing town GIS data Zoning Tax Parcels E911 Structures or grand list Natural Resource Information Data must be current or updated for accuracy
Methodology – Basic Steps A. Construct a table of each parcel’s acreage by zoning district B. Determine existing parcels that are fully developed C. Calculate potential new development allowed in each zone
Resulting Summary Table by Zone
Methodology – Next Level Change minimum lot size of ASRR district to 5 acres from 10 acres
Methodology – Compare Tables Potential units in the ASRR district increase from 181 to 617
Methodology – Com/Industrial Village/ Commercial Area Min Lot Size.33 ac (14,520 sq ft) Lot Coverage 75% Max Building Hgt 35 ft Sq Ft / Parking Sp 200 Existing Development
C/I Summary Table by Zone
Methodology – Location Constraints Define constraint layers Choose to use or remove the layer area from density calculation Choose to allow structures in the layer area or restrict placement of potential development Adjust density of layer area to less than 100%
Methodology – Location Constraints Floodplain Layer Restrict house locations in floodplain by removing layer – maintain overall density
Next Steps for CBOA 1. Continue to use the program with communities. 2. Work to improve the currency/accuracy of town data. 3. Improve the program with new ideas from users. Mixed use districts Time horizon – growth model PUD w/ open space – conservation planning Subdivision lot lines 4. Issues – move to ArcGIS or Web-based 5. Funding partners
Acknowledgements Thanks to the Vermont USDA and Senator Leahy’s staff for originally supporting the Community Planning Tools Demonstration Project and to the Center for Rural Studies at UVM for continuing to provide development support. In addition, we want to recognize the important land use decisions that are made by the volunteer boards and commissions in each of our communities. We sincerely hope that these tools will be an asset to their efforts.