Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.

Slides:



Advertisements
Similar presentations
1 TS&L Expectations What is included in a TS&L?. 2 TS&L Expectations Per BDDM – The end product of a TS&L design includes: TS&L Plan and Elevation.
Advertisements

ODOT-OES Environmental Update Meeting September 16, 2010.
Christine Pasquire, Nick Blismas, Alistair Gibb
An innovative tool for the review of health and safety work practices and the implementation of effective controls of particulate exposures.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
Dan Gorley, P.E. IDAHO TRANSPORTATION DEPARTMENT REMOTE PBES.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
SHRP2 Project R04 Bridge Designs for ABC
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
Chapter 34 Bridge Construction.
PREFABRICATED BRIDGE ELEMENTS & SYSTEMS (PBES), DECISION- MAKING FRAMEWORK Claude Napier Sr. Structural Engineer Resource Center - Structures TST.
Connection Details for Prefabricated Bridge Elements and Systems
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
Totally Precast Concrete Bridges
FHWA Update for the Virtis Opis User Group Meeting Thomas Saad, P. E. FHWA Resource Center Phone:
Reconstruction of the Eads Bridge Highway Deck
 Project Delivery  Design Considerations  Lessons Learned.
3/10/2010 March 2010 ABC Pooled Fund Study TAC Teleconference 1.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Abstract We evaluated various construction methods including: Cast in Place Concrete, CMU, ICF, Precast Concrete, and Structural Steel for an Electrical.
Eco-Materials The aim of this category is to encourage the use of materials with lower environmental impacts over their lifecycle. Low embodied energy.
St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Oakland Jr. High – STEM Classes – Project Update and 3D Printing March 26, 2015.
Office of Highway Safety Bridge Inspections Dan Walsh.
BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
Evaluate Environmental, Health, and Safety  Anticipate Hazards  Recognize  Evaluation  Control Measures  Evaluation.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Damien Barr, ARM-P, CRIS, CSE- Manager of Risk Management, Wisconsin Department of Transportation (608) Wisconsin Dept. Of Transportation 2010.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: State-of-the-Art Full-Depth Precast Concrete Bridge Decks Sponsored by Center.
Intelligent Compaction for Subgrades and Structural Layers AASHTO RAC High Value Research Workshop July 27, 2011.
PennDOT’s Study of NCHRP Research Results Implementation TRB State Representatives & AASHTO National RAC Meetings July 27, Michael Bonini Transportation.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
“Get in, do it right, get out, and stay out.”
SHRP2 Renewal Implementation | February 2013 When Research Meets the Road Renewal Focus Area February 8,
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Field-Cast UHPC Connections in Full-Depth Precast Bridge Decks Sponsored by.
CMSC Initiatives Update WTBA & WisDOT Contractor Engineer Conference January 21, 2010.
Overview of the “Recommended LRFD Seismic Design Specifications for Highway Bridges” Ian M. Friedland, P.E. Bridge Technology Engineer Federal Highway.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated.
Cross Wall Construction
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Totally Precast Concrete Bridges
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Wave of the Future Trendy Novelty?
Toledo I-280 Crane Accident
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Totally Precast Concrete Bridges
Toledo I-280 Crane Accident
Narrows Bridge - Perth Concrete Repair Works
Protective surface finishes
Presentation transcript:

Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011

Rapid Bridge Construction: Prefabricated Substructure Elements Overview The use of precast substructure components for bridges offers several potential benefits in Wisconsin –Faster bridge construction times –Reduced exposure of workers to safety hazards –Less environmental interference during construction –Fewer weather delays

Rapid Bridge Construction: Prefabricated Substructure Elements Goals and methods –After considering several elements, the project focused on abutment panels and caps for piers and piles –WisDOT conducted a pilot program with precast elements on the U.S. 63 bridge over the Rush River Propose, implement and evaluate a precast substructure system suitable for Wisconsin

Rapid Bridge Construction: Prefabricated Substructure Elements Findings On-site time savings were substantial For a 96-foot span, placing the precast concrete abutment system took only 10½ hours for four workers A comparable cast-in-place system would have required the same workers two weeks to place Cost was an issue The need for a high-capacity crane drove costs higher than expected; investigators recommend lower element weights for future projects

Rapid Bridge Construction: Prefabricated Substructure Elements Outlook Costs should drop and expertise should improve as contractors get more experience with these methods. WisDOT intends to try this technique several times before precasting other substructure elements.

Rapid Bridge Construction: Prefabricated Substructure Elements For more information Wisconsin Highway Research Program project , Rapid Bridge Construction Technology: Precast Elements for Substructures structures/structures_ htmlhttp:// structures/structures_ html Daniel Yeh (608)