CLIC survey and alignment 1 CLIC CES meeting. 08-10-2008. STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.

Slides:



Advertisements
Similar presentations
Navigation Fundamentals
Advertisements

Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC.
Latest Results from the CLIC Geodetic Studies
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Geographic Datums Y X Z The National Imagery and Mapping Agency (NIMA) and the Defense Mapping School Reviewed by:____________ Date:_________ Objective:
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
Des Éléments Importants des Systèmes de Référence et de la Géodésie au CERN Mark Jones EN\MEF-SU.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
H. SCHMICKLER Alignment challenges for a future linear collider.
Coordinate Systems in Geodesy By K.V.Ramana Murty, O. S.
Modern Navigation Thomas Herring MW 10:30-12:00 Room
Applied Geodesy Group Survey and Alignment of the ILC An approach to cost calculation and network simulations VLCW06 Vancouver, British Columbia, July.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
SU 4100 GEODETIC POSITIONING Instructor: Indra Wijayratne.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
A comparison of the ability of artificial neural network and polynomial fitting was carried out in order to model the horizontal deformation field. It.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
1 Tunnel implementations (laser straight) Central Injector complex.
OUTLINE:  definition and history  three major models  how are reference shapes used  geodetic systems G EODESY.
Geography 70  Basic Geodesy  Map Projections  Coordinate Systems  Scale Locating Positions on the Earth.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
Deformations and Movements of CERN installations Mark Jones M. Jones, 28/10/2015 FCC Infrastructure and Operation Meeting.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Principles of the Global Positioning System Lecture 02 Prof. Thomas Herring Room A;
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Catherine LeCocq SLAC USPAS, Cornell University Large Scale Metrology of Accelerators June 27 - July 1, 2005 Height Systems 1 Summary of Last Presentation.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
PACMAN : technical objectives Hélène Mainaud Durand.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
ALIGNMENT OF THE NEW TRIPLETS
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
Geodesy and the FCC Project
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Chapter 1: Precision Survey Properties and Techniques
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
Geodesy & Crustal Deformation
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND

CLIC survey and alignment 2 CLIC CES meeting INTRODUCTION 1.The statement of the alignment problem 2.Some reminders concerning geodesy at CERN 3.The alignment steps foreseen Overview

CLIC survey and alignment 3 CLIC CES meeting INTRODUCTION We need to align all beam components or their associated supports: In all the area of the tunnel (Main beam injectors, drive beam generation complex, main linac, Beam Delivery System, return loops,…) ≈ components or supports (data on Sept. 2007) ≈ 52 km (data on Sept. 2007) On the ground, on the ceiling (transfer lines), in loops (return loops, damping rings) Within various tolerances ranging from 10 microns to 300 microns. Some priorities have been given concerning the survey and alignment studies: Prove the feasibility of the pre-alignment of the components of the main linac within a tolerance of 10 microns over a sliding window of 200m along the whole linac Propose a global solution of alignment Integrate this solution and make it compatible with other services. Statement of the problem

CLIC survey and alignment 4 CLIC CES meeting Some reminders of geodesy applied to CERN The basis for all the topographical works: Directions (North, South) Distances Heights A coordinate system (CERN Coordinate System or CCS) and a reference system (CERN Geodetic Reference Frame or CGRF)

CLIC survey and alignment 5 CLIC CES meeting D The CERN Coordinate System (CCS): A right handed 3D Cartesian coordinate system Used to define the relative position of all the detectors and accelerators at CERN Initial point: P 0 centre of the PS accelerator X axis: parallel to the vector from P 2 to P 1 of the PS Y axis: orthogonal to the line (P 2,P 1 ) passing through P 0 Z axis: collinear with the vertical at P 0

CLIC survey and alignment 6 CLIC CES meeting The CERN Geodetic Reference Frame (CGFR) defines the coordinates in latitude, longitude, as well as a height coordinate measured along a normal of the surface. But this ellipsoidal surface is not accurate enough concerning the measurements of heights: it does not take into account the direction of the gravity field. For example, the mountains in the neighborhood of CERN exercise on any mass m an attraction dg which must be combined with the attraction  to obtain the true attraction g.

CLIC survey and alignment 7 CLIC CES meeting The geoïd describes the equipotential surface of the gravity field. A model was defined for the LEP and a more precise one for the LHC and CNGS, taking into account the deflection of the vertical. In presence of a topographic anomaly, the equipotential surfaces of the gravity field are deformed. The heights of a point above the ellipsoid and the geoid can be significantly different. When you need to align components w.r.t each other within a few microns, you need to know these topographic anomalies accurately. That is why gravimetric measurements will have to be carried out.

CLIC survey and alignment 8 CLIC CES meeting If all the previous accelerators: SPS, LEP, LHC have been defined in local coordinate systems in a first step, all these definitions have been very early transformed in the unique CERN Coordinate System CCS. It is the only way to allow the coherence between the machines, and the integration of the machines on the maps and the field. MAD allows this kind of transformation, which has to be performed since the very beginning of the CLIC project.

CLIC survey and alignment 9 CLIC CES meeting INTRODUCTION The steps of alignment Installation and determination of the surface network Transfer of reference into tunnel Installation and determination of the tunnel network Absolute alignment of the elements Relative alignment of the elements Active prealignment Control and maintenance of the alignment For the main linac

CLIC survey and alignment 10 CLIC CES meeting Installation and determination of the surface network Transfer of reference into tunnel Establishment of a geodetic network on the surface (pillars near the pits) Determination of the local deviation of the vertical by astronomic measurements using a zenithal camera Measurements performed by GPS means (using differential techniques to guarantee an accuracy of ± 1mm for the relative positions of the pillars) Determination of reference pillars placed at the bottom of each pit w.r.t. the surface geodetic network thanks to a vertical drop procedure (3 dimensional triangulation and trilateration or plumb line associated with vertical distance measurements.) (1) (2)

CLIC survey and alignment 11 CLIC CES meeting Installation and determination of the tunnel network Installation and determination of a geodetic network in the transport area, with a reference in the ground every 50m, defined in the CCS and CGRF. This geodetic network is necessary for the implantation of all the general services and the marking of all the components (jacks, beam,…). It must be determined prior to any installation of general services. Gravimetric measurements are needed A metrological network must be implemented (once the geodetic network is determined) and measured, in order to allow an absolute positioning of all the actuators and sensors for the active pre-alignment within ± 2mm maximum. This metrological network is composed by one reference plate installed on a concrete block every 100m, between the main and drive beam, and must be determined using the same references (either overlapping stretched wires or laser beams) foreseen for the active pre-alignment. Main linac (3)

CLIC survey and alignment 12 CLIC CES meeting Absolute alignment of the elements First, on the surface, fiducialisation of the element: determination of the external alignment references (fiducials) w.r.t. to the reference axis of the component to align (Several methods according to the accuracy needed) A straight referential (R, S, T) is associated to each component fiducialised. The coordinates are then also computed in the CCS system. Then, for all the areas in the tunnel: Marking of the position of the elements on the floor For all the areas, except the main linac: Positioning of the jacks, w.r.t the geodetic network Installation and alignment of the elements w.r.t the geodetic network. First a concrete block is installed every beginning of a module or of a main beam quadrupole (in order to compensate for the ground difference of heights and provide a stability for the support). Main linac (4)

CLIC survey and alignment 13 CLIC CES meeting Absolute alignment of the elements Installation and alignment of the elements w.r.t to the metrological network. Main linac Then an adjustable plate, on which are pre-installed the actuators is positioned w.r.t to the metrological network (this plate is adjustable in order to allow the actuators to work in the middle of their range and compensate manually if necessary for important long term ground motions).

CLIC survey and alignment 14 CLIC CES meeting Relative alignment of the elements Smoothing of the elements over distances of more than 100m. Implementation of the active pre-alignment: the sensors are installed, the alignment systems controlled, as well as all the acquisition and control/command systems dedicated to the sensors and actuators. Calculation of the position of the components per sector (between 2 pits) and then remote positioning, using the actuators in order to perform the required relative alignment. Active prealignment Implementation of the active pre-alignment: Thanks to the sensors, determination of the components position Calculation of the displacements to perform (as soon as the consigne value is out) Thanks to the actuators, displacements are performed remotely The sensors control the new position Closed loop Main linac (5) (6)