Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 24th, 2013 Anaheim, CA.
Presented to PGDTF February 11, 2015
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Distance Relay Specification WECC TSS January 23,2014 Amos Ang.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Goshen Area Bus Reconfiguration
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee RASRS Report to Operating Committee October 8-9, 2014 Salt Lake City, Utah.
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
WECC and NERC Protection Criteria and Standards
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Andy Meyers Bonneville Power Administration Operating Committee Update ISAS April 2015 Salt Lake City, UT.
WECC 2013 TPL Coordination Analysis Report PCC Response Brian Keel.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Directional Overcurrent Relay Specification WECC TSS January 23,2013 Amos Ang.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
WECC – NERC Standards Update
RASRS Report to Operating Committee March 21, 2017
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
WECC Regional Standards Update
Philip Augustin TSS Chair
Eleanor Ewry Base Case Coordination Subgroup Chair
Kenneth Silver Los Angeles Department of Water & Power
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Specifications Updates and Approval
Joe Seabrook Puget Sound Energy, Inc.
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Andrew Christensen, SRWG Chair
SRWG Chair Report March 2015 WECC HQ
Tracy Rolstad TSS Chair
Kenneth Silver Los Angeles Department of Water & Power
Distance Relay Specification
WECC – NERC Standards Update
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Joe Seabrook Puget Sound Energy, Inc.
Information Sharing Policy Update March 25-26, 2014
Jonathan Young ColumbiaGrid
Presentation transcript:

Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1

Overview Approval Items – Data Preparation Manual – 2013 Annual Study Report – MSRATF White Paper – Assistance on Lat/Long for GIC TSS Activities – Includes MSRATF activities MVWG Activities SRWG Activities March 20142

TSS ACTIVITIES Composite load Model Phase 1 in play in 2014 Response to 08 Sept 2011 AZ to CA Outage – Relays, DPM Changes, WECC RAS/Ctg Definition BCCS – Hope to have Base Cases created by BCCS in Syntax description and documentation of Project File NEEDED ASAP – Training provided in 2013 and available in 2014 Certification/de-certification Process of Study Software – Following MSRATF software requirement development March 20143

Response to AZ to CA Outage Sharing of Contingencies and RAS files – Began in 2013 WECC RAS/Contingency Format now exists – In one software…assistance needed in incentivizing fast development in other software WECC v.s. Peak – Unclear on when data sharing pipeline will be established between WECC and Peak Some data is at Peak and not WECC Have perceived data security issues at WECC been addressed? – For RAS and Contingency files March 20144

AZ->CA Response: Ctg and RAS WECC defined and approved a Ctg & RAS syntax – Issued a contract to a software supplier Specs again are in the public domain – Software supplier delivered software for acceptance testing on 22 October out of 3 software programs has it coded presently How can we get others to develop software? March 20145

MVWG ACTIVITIES – Updated Phase 2 Wind Type 3 Model Specifications Document – Phase 2 Wind Summary Specifications Document – Updates to the Approved Dynamics Model List – [MSRATF] Distance Relay Model Specifications – [MSRATF] Directional Overcurrent Relay Model Specifications (for the addition of the directional and load encroachment elements to overcurrent relays) March 20146

SRWG ACTIVITIES 2014 Base Cases – Developed jointly with BCCS and without Changes to Annual Study Program – Focus on quality base cases – Performance Log retirement Data Preparation Manual Revision BCCS Syntax !!! March 20147

SRWG: Data Preparation Manual – Proposed amendments The data preparation Manual will be amended to include the following additions under the dynamic data Requirements section of the DPM: Line and Transformer Protection Include line and transformer overcurrent protection models where approved models are available on BES transformers and transmission lines that have overload trip settings below 150% of their seasonal normal rating, or below 115% of the highest emergency rating SPS Protection Include SPS protection models where approved models are available including safety Nets, Wide Area Protection Systems (WAPS), Local Area Protection Systems (LAPS) and Remedial Action Schemes. March 20148

TSS Report Summary 2014: – BCCS – Composite Load Model, phase 1 – Relays (Overcurrent and distance) – Ctg & RAS Definition Need to respond to Unified TPL Standard General Trend – Agility in responding faster to external forces FERC/NERC, etc Physical Security and GIC Data and Study Needs – Fast moving Physical Security standard… March 20149