Bob Dedalis, HST Payload Safety Manager

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

APOLLO 13 Safety Message Bob Sieck Odyssey Spacecraft NASA Project Engineer April 1970.
ISIM Integration & Test Mike Drury JWST-PRES
Secondary Payloads Overview
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
HUBBLE SPACE TELESCOPE PROGRAM Sixth European Conference on Space Debris 1 Goddard Space Flight Center mk_overview.ppt Space Shuttle STS- 31 Deployment.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Hubble Space Telescope Goddard Space Flight Center Hubble Ultra-Wide-Field Imager (HUFI) David Leckrone Senior Project Scientist for HST December 16, 2001.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Hubble Recovery with STS Bryan Palaszewski working with the Digital Learning Network NASA.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
LIVE INTERACTIVE YOUR DESKTOP January 28, 2010 NASA/NSTA Web Seminar Series How Telescopes Have Changed Our View of the Universe Hubble’s Universe:
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
ARISSat-1 Control Panel and Safety Circuitry Jerry Zdenek
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
24-Jun-2008K. Sembach 1 What’s Happening During Hubble Servicing Mission 4? Ken Sembach STScI Hubble Project Scientist.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
From Research Prototype to Production
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
Hubble: Back in Business and Better Than Ever Dr. Frank Summers Space Telescope Science Institute September 9, 2009.
27-Apr-2009K. Sembach 1 Servicing Mission 4 - Revisited Ken Sembach STScI Hubble Project Scientist April 27, 2009.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Believe it or.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs.
Space Systems Laboratory University of Maryland test.col.pp4 HERA: Hubble End-of-life Robotic Augmentation – A Robotic Alternative for SM-4 David L. Akin.
Exploring the far reaches of the universe. Hubble Telescope By Blake Shaffer.
Space Shuttles By Frederick. Launching Space Shuttles To lift the 4.5 million pound (2.05 million kg) shuttle from the pad to orbit (115 to 400 miles/185.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Development of Methodologies for Independent Verification and Validation of Neural Networks NAG OSMA-F001-UNCLASS Methods and Procedures.
Space Station Will it be accessible for You and Me?
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
STS-125 Hubble Space Telescope(HST) Servicing Mission 4 (SM4) Overview Presented By: Jerry L. Ross October 6, 2009 Prague, Czech Republic 1.
Image Processing: Critical to Hubble Discoveries
Futron Corporation 400 Virginia Avenue,SW Suite 340 Washington, DC Phone Fax NASA PRA Practices.
Chapter 13 Section 3 – pg 515 Exploring Space Today.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Payload Safety Review Plan and Issues Leland D. Hill.
Composite Overwrapped Pressure Vessels
Hubble Space Telescope By Brittany Bellows Physics 1040 – Spring 2011.
National Aeronautics and Space Administration Space Launch System Phase I Safety Review Preparation for GT #2 Topic: Phase I Safety Review.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Visual Survey of HREP Ricardo C. Rodriguez POD Office Lead for HREP POIWG External Payload Splinter 25 Jul 2012 Approved for Public Release, Distribution.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Failure Modes, Effects and Criticality Analysis
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
THEMIS Mission Assurance
ISUAL Product Assurance
Lockheed Martin Canada’s SMB Mentoring Program
Integration and Test Organization Chart
Instrument Overview Larry Springer HMI Program Manager
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Hubble Space Telescope Servicing Mission Four (HST SM4): Unique Challenges for STS-125 Bob Dedalis, HST Payload Safety Manager Miranda Cooter, HST Lead Flight Safety Engineer Patrick Mitchell, Payload Safety Review Panel Executive Secretary William Hill, HST Lead Ground Safety Engineer Phillip Adkins, Systems Safety Engineer

Introduction Mission Overview SM4 first time in seven years HST serviced Nominal design called for once every 3 years More new hardware than any previous mission SIC&DH added very late First time since Columbia a shuttle was not used for ISS construction

Major Tasks Impact to Hubble Task Install WFC3 – Wide Field Camera 3 Installed a high-resolution/wide-field camera with continuous coverage of wavelengths or colors of light from the ultraviolet to the near-infrared. Install COS – Cosmic Origins Spectrograph Installed the most sensitive ultraviolet spectrograph ever to fly on HST. Repair STIS Restored the Space Telescope Imaging Spectrograph to operational status by replacing circuit boards. Repair ACS Restored critical scientific functionality to the Advanced Camera for Surveys by replacing power supply and circuit boards. Replace Rate Sensor Units (RSU) (gyroscopes) Completed change-out of all six gyroscopes, the heart of HST's pointing system, and HST's main wear-out items. FGS - Fine Guidance Sensor Last in a series of changed-out units that allow fine pointing of HST. Replace Batteries Replaced the six batteries originally launched with Hubble in 1990, which are steadily losing capacity as they age. Install Soft Capture and Rendezvous System Installed the Soft Capture Mechanism on the bottom of Hubble to enable NASA to pursue options for the safe disposal of Hubble. Install New Outer Blanket Layers (NOBLs) Installed NOBL covers to thermally protect the exterior blankets and maintain normal operating temperatures of Hubble's electronic equipment. Replace Science Instrument Control & Data Handler (SIC&DH) unit Replaced the original unit launched with Hubble in 1990 to insure redundancy of operations after September 2008 failure of Side A Control Unit/Science Data Formatter (CU/SDF).

Payload Bay Equipment Four Full Equipment Carriers Science Instrument Control and Data Handling Unit Flight Support System pivots and rotates to enable in-bay servicing Four Full Equipment Carriers Included a servicing platform

Payload Safety Review Process Hazard Report Verify Hardware As Built Implement Controls Payload Organization Concurrence NSTS Safety Review Phase III Delivery Flight Safety Verification Tracking Log Track Verification of Items To Be Conducted After Phase III Review Payload Organization Approval NSTS Review Hazard Report Verify Design Implement Controls Payload Organization Concurrence NSTS Safety Review Phase II CDR Hazard Report Identify Hazard Controls Payload Organization Concurrence NSTS Safety Review Phase I PDR Preliminary Hazard Reports Identification of Hazards Safety Review Phase 0 Design Concept Update Only Update Only For Each Hazard

Hazard Identification Process Postulate Failure (PHA/FMEA/FTA) NSTS Requirements Change Design Not Approved System/ Sub-system/Interfaces Hazard to Crew/STS Requirements Met Perform Hazard Assessment Write HR Yes No Critical No Yes (Generic Hazard) Catastrophic Confirm Fault Tolerance or DFMR in Design/Operations No Hazard Write HR Review with JSC Approved 1 Fault-Tolerant 2 Fault-Tolerant Redesign Write HR Verify Controls * ARHR (Accepted Risk Hazard Report): New to the PSRP documentation process for SM4. Method for Shuttle program to accept the risk of safety non-compliant conditions ARHR * Document for CoFR 4/25/2017

Final Flight Safety Post Phase III/Part 4

Safety Challenges Soft Capture Mechanism (SCM) Batteries Late addition of Science Instrument Control and Data Handler (SIC&DH) Complex on-orbit Repairs STIS Advanced Camera for Surveys (ACS) Lack of Shuttle Safe-Haven Increased chance of on-orbit debris

Soft Capture Mechanism and Battery Isolation Switch Miranda Cooter

Soft Capture Mechanism Designed to enable controlled de-orbit HST originally designed to be returned in payload bay HST does not have propulsion system Installed onto Aft Shroud Flew on FSS between HST and FSS support ring Was risk of connecting HST to FSS via SCM (inability to close shuttle payload bay doors) Systems Safety participated in initial design Performed Initiating Event Tree Analysis Insured that each major function included crew-activated override

Soft Capture Mechanism Berthing Latch outside SCM attach mechanisms Servicing Platform Soft Capture Mechanism Berthing Latches and SCM Attach Points Crew-Activated Remote Drive Soft Capture Mechanism Detail on Next Slide

SCM Mechanism Detail Radial Out View Radial In View FSS Override Assy HST Release Override HST Attach Override FSS Release Override FSS Override Assy FSS Attach Override Sill Plate Adapter

Final SCM Fault Tolerance Separated Mission Success issues from Safety concerns Mission Success is single fault tolerant Flight Safety must be dual fault tolerant

Batteries Launched charged Battery Isolation Switch (BIS) Installed 88 amp-hour batteries Nickel Hydrogen Battery Isolation Switch (BIS) Installed COTS product Based on military headlight switch Not designed to be fail-safe Barrier Analysis applied Battery Isolation Switches (BIS)

BIS Design

Modifications to BIS BIS Not Fail-safe Conducted Hazard Analysis Failure causes switch to be closed (i.e. ON) Identified as a safety issue Conducted Hazard Analysis No Backaway prevention on handle Possibility of Whiskers Cadmium and Zinc coatings Potential for “hot” handle if internal failure Not visually identifiable to crew Hazard process improved design Staked handle fastener to prevent backaway Detailed analysis of potential for whiskers Found whiskers in non-flight version of BIS Through analysis & test, determined that, for this design, whiskers cannot sustain arc Added non-conductive paint to handles

IMAX Accommodations and Science Instrument Control and Data Handling Phillip Adkins

ORUC with IMAX Accommodations

Steps to Certify IMAX Previous IMAX flights reviewed with new analysis/testing done as needed Proof Pressure Testing Vibration Functional Test Thermal Vacuum Test New Carrier Electrical Harness IMAX presented as a separate reflown payload

MULE Picture

Late Addition of SIC&DH Reduced time for final certification Six month certification cycle Flight safety closely integrated with design and development to insure success Safety documentation available from unit certifications

EVA Safety Considerations Bill Hill

Extra-Vehicular Activities (EVA) Included instrument and equipment exchange Done on each previous servicing mission New techniques and tools developed for on-orbit, in situ repairs of instrument Highly complex operations Required specially designed tools to enable delicate repairs to circuit boards tailored to crew needs Flight safety engineers participated in tool development beginning with design

EVA Timeline Five long days of EVA with four astronauts participating

Tool Development Process Tools Developed and designed with crew and safety participation Design and development includes full review and verification

STIS Repair Tools

FCP After Removal On-orbit

Shuttle Specific Challenges Patrick Mitchell

Shuttle-Specific Safety Challenges ISS was not available for Safe-Haven Launch-on-need (LON) shuttle processed and available for rescue Enhanced Micro-Meteorite On-orbit Debris (MMOD) Risk Shuttle flew protected attitudes when HST specific operations permitted Shuttle inspections performed Tile inspections performed before and after servicing Insures no damage during ascent or from MMOD

Launch On Need STS-400

Solutions Applied Safety Systems Analysis Techniques Used Initiating Event Tree Analysis (IETA) Barrier Analyses Fault Tolerance Analyses JSC Safety Requirements and Processes Safety engineer integration into hardware design teams resulted in safe hardware by design Successful application of System Safety techniques contributed to a successful Servicing Mission

HST After SM4 Deployment