NUCLEAR REGULATION AND LICENSING OF PNPP-1 Dr. Alumanda M. Dela Rosa Director Philippine Nuclear Research Institute.

Slides:



Advertisements
Similar presentations
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Pakistan Nuclear Regulatory Authority
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
EGYPT NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION “General Information on the Status of the Egyptian Nuclear.
Licensing of Nuclear Power Plants in Pakistan
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
USNRC IRRS TRAINING Lecture 2
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
Role of Independent Regulatory Body for Safe Operation of NPPs Zia Hussain Shah Director, Centre for Nuclear Safety Pakistan Nuclear Regulatory Authority.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
IAEA International Atomic Energy Agency International Cooperation in Nuclear Security David Ek Office of Nuclear Security.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
International Atomic Energy Agency Code of Conduct on the Safety and Security of Radioactive Sources Training Course on Technical Requirements to Fulfill.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
IAEA - Department of Nuclear Safety & Security
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Energy Nuclear stress tests and follow up in Europe Brussels, 25 May 2012 Nina Commeau Adviser to the Deputy Director-General in charge of nuclear energy.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
56th Regular Session of the IAEA General Conference
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Workshop feedback “ Roles & Responsibilities of Vendor Countries and Countries Embarking on Nuclear Power Programmes.
Parliamentary Portfolio Committee Presentation Annual Report 2012.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Intervention for Chronic and Emergency Exposure Situations Developing a National Capability for Response Emergency Response Plans Lecture IAEA Post Graduate.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
PHILIPPINES Report: Policies and implementation strategies on HUMAN RESOURCE DEVELOPMENT to introduce NPPs Adopting RAIS 3.2 AS THE NATIONAL REGISTER OF.
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
SESSION 3 Policy Framework
Brazil - Training and Tutoring Feedback Second Coordination Meeting
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Armenia Training and Tutoring Feedback
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
Presentation to the EPREV Lessons Learned Workshop
USNRC IRRS TRAINING Lecture18
Legal and Regulatory Framework for Nuclear Installations in IRAN
Presentation transcript:

NUCLEAR REGULATION AND LICENSING OF PNPP-1 Dr. Alumanda M. Dela Rosa Director Philippine Nuclear Research Institute

PAEC Rules and Regulations Legal Basis -RA 5207 ( Atomic Energy Regulatory and Liability Act of 1968) which provided authority to PAEC to issue license for the construction, possession and operation of any atomic energy facility -Code of PAEC/PNRI Regulations* -Part 7, “Licensing of Atomic Energy facilities” -Part 4, “ Safe Transport of RAMs” -Part 3, “Standards for Protection Against Radiation” * based on codes and standards of the USNRC and the IAEA

Regulatory Framework Nuclear Regulatory Body –Philippine Atomic Energy Commission (PAEC), presently the Philippine Nuclear Research Institute (PNRI)

Licensing Process Basic regulatory stages: -Provisional Permit Stage (PP) -Construction Permit Stage (CP) -Operating License Stage (OL)

Licensing process Technical documents required: -PP stage -Preliminary Site Investigation Report (PSIR) -CP stage -Preliminary Safety Analysis Report (PSAR) -Environmental Report (ER) -Proof of financial qualifications -Work Plan -OL stage -Final Safety Analysis Report (FSAR) -Plant operator license

Licensing Process NPC filed for a Provisional Permit on 21 October This marked the start of the regulation and licensing of the PNPP-1. PAEC regulatory activities: -site visits -audit and inspection of the applicant and its contractor’s QA program and activities -meetings with experts and review of mission reports -review of applicant’s documents and responses -conduct of public hearings (upon receipt of application for CP and of OL by NPC) -licensing of the plant operators

Regulatory Review Process A notice of public hearing was issued by PAEC in September No petition for intervention was received within 30 day period. Thereafter, the formal review process started in October 1977.

Regulatory Review Process Safety of the Site –The review involved the safe shutdown earthquake, threat of volcanism and foundation engineering. In- house and local consultants were availed of by PAEC. Where local consultants lack the necessary expertise, IAEA assistance was availed of by the PAEC. –The PAEC requested in 1978 for an IAEA Expert Mission to assist in the assessment of the site, then followed by another IAEA expert mission to assess the actions of government on the resolution of issues raised by the 1978 Expert Mission. The 1978 Mission submitted eight issues for consideration by the PAEC.

Regulatory Review Process Safety of Site -The PAEC required the Applicant to address the issues raised by the PAEC and the IAEA. The NPC and its foreign consultants provided responses to the issues. _The second IAEA mission had the following conclusions: -An important factor in the PNPP-1 situation is the ability and willingness of the PAEC to act to ensure the safety of the plant. The Philippine regulatory situation is vastly superior to that in many other developing countries

Regulatory Review Process Safety of the site -While geotechnical problems are more difficult in the Philippines than in many other areas, there is evidence that appropriate precautions are being taken. USA criteria have been used and conscientious efforts are being made to resolve the issues raised by the 1978 expert mission -review of the PSAR by the PAEC staff and the IAEA safety mission in 1977 indicated that this document appeared to be the most comprehensive site investigation and PSAR ever provided to a developing country

Regulatory Review Process Safety of the Site The final decision rested on the nuclear regulatory body. Based on the review of the documents submitted by the applicant, the responses of the applicant to the issues raised by the PAEC and the recommendations of its consultants and the IAEA, the PAEC issued the construction permit in April The review process took about 2 years from the time the applicant filed an application in July 1977.

Regulatory Review Process Construction stage - PAEC reviewed the PSAR and the ER –PAEC adopted the Quality Assurance program of the USNRC and the IAEA –PAEC assigned Resident Inspectors 24/7 –PAEC requested technical experts from IAEA –IAEA sent long-term Resident Inspectors –PAEC issued notices of non-conformance when warranted by the inspection results; applicant responded to the notices until issue was resolved

Regulatory Review process Three Mile island (TMI) accident occurred in March Work at the site was suspended and the government created an investigative committee, the Puno Commission, to inquire on the safety of PNPP-1.

Regulatory Review Process Puno Commission The Commission conducted public hearings from July 1979 to September 1980 during which construction work on site was suspended for 18 months. The Puno Commission concluded that the site is safe but that the plant needed additional safety upgrades.

Regulatory Review Process Operating License Stage Safety of the Plant -Conclusion of July 1984 IAEA Pre-Operational Safety Review of the PNPP-1 -Past IAEA safety reviews have tended to focus on the site selection, plant design and construction areas. Although the Philippines are located in a region of high seismicity and volcanic activity, the plant has been found to meet commonly accepted site selection requirements. Some special features have been provided to deal with seismic and volcanic phenomena. Additionally, the design, construction and operational safety standards applied to PNPP are consistent with the safety codes and guides of the IAEA. In the course of the plant construction, upgrades were introduced that took into account the lessons learned from the TMI accident. In considering the above, the IAEA has concluded that adequate safety margins have been provided in the site selection, design and construction of the PNPP.

Regulatory Review Process Safety of the Plant The OSART I Mission (October 1984) reviewed the plant status and its readiness for core loading. Its conclusions: 1) The various activities to be completed were: outstanding construction and installation work, correction of non-conformances, testing of components and systems, calibration of instruments and adjustments of controls which are typical in nature at this stage of construction of NPP sites around the world; 2) plant organization is not complete and must be brought to operational strength; 3) radiation protection and emergency preparedness programs should be completed

Regulatory Review Process Safety of Plant -OSART II Report (February 1985) -The Mission believes that significant progress has been achieved in implementing the previous OSART recommendations. The attitude of the NPC management towards safe plant operation as evidence by the quality and speed of efforts in addressing OSART concerns provides confidence that nuclear safety will be given adequate consideration during plant operation.

Regulatory Review Process Safety of Plant -The Mission acknowledges the review that PAEC conducted of the previous OSART recommendations and the follow-up regulatory actions on the identified safety issues. -The Mission believes that there exists no technical obstacle to prevent core loading of the plant.

Regulatory Review Process 1985 – 1986 –The PAEC continued the review process. –The PAEC conducted public hearings which started in June 1985, a year after the receipt of OL application by NPC. –The oppositors elevated issues to the Supreme Court –The Supreme Court ordered reconstitution of PAEC Board of Commissioners before hearings could continue on a perceived bias by the PAEC on PNPP –A new government installed in 1986 stopped the nuclear power project and decided to mothball the PNPP-1

Regulatory Review Process PAEC stopped all regulatory activities related to PNPP-1 on 20 August 1986 after granting NPC’s motion to withdraw its application for an operating license. These included inspection/audit of PNPP-1 activities, resolution of outstanding issues, review/evaluation of safety issues, licensing of reactor operators

Concluding Remarks As the nuclear regulatory body, PAEC implemented its mandate to ensure the safety of the PNPP-1 with the highest degree of competence, transparency and objectivity. The PNRI cannot/shall not do less in the exercise of its regulatory mandate should the BNPP be rehabilitated.

Addendum S & T activities performed by PAEC in support of the Nuclear Power Program –Training of NPC and PAEC staff –Regulatory R & D (concentration of RI by biota) –Exploration for U and other nuclear materials –Successful production of yellow cake from Larap uranium ore –Off-site radiological emergency preparedness and response plan