FVTX Sensors and FPHX Chips FVTX Collaboration Meeting at UNM, 07/15/2009 1Jon S. Kapustinsky7/15/2009.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Silicon Preshower for the CMS: BARC Participation
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
SOGANG UNIVERSITY SOGANG UNIVERSITY. SEMICONDUCTOR DEVICE LAB. Power MOSFETs SD Lab. SOGANG Univ. Doohyung Cho.
The NO A APD Readout Chip Tom Zimmerman Fermilab May 19, 2006.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Pixel Sensors for ATLAS Sally Seidel University of New Mexico Pixel ‘98 8 May 1998.
November 3-8, 2002D. Bortoletto - Vertex Silicon Sensors for CMS Daniela Bortoletto Purdue University Grad students: Kim Giolo, Amit Roy, Seunghee.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
20th RD50 Workshop (Bari)1 G. PellegriniInstituto de Microelectrónica de Barcelona G. Pellegrini, C. Fleta, M. Lozano, D. Quirion, Ivan Vila, F. Muñoz.
St Malo, 13 th April 2002Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon pad sensors for W-Si ECal.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Dahee Kim (Ewha womans university) for MPC-EX collaboration TEST OF MINI-PAD SILICON SENSOR FOR PHENIX MPC-EX.
Silicon Sensor with Readout ASICs for EXAFS Spectroscopy Gianluigi De Geronimo, Paul O’Connor Microelectronics Group, Instrumentation Division, Brookhaven.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
TDCPIX_2012. TDCPIX size Proposal numbering pads.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
F February 5, 2001 Pixel Detector Size and Shape David Christian Fermilab.
VIP1: a 3D Integrated Circuit for Pixel Applications in High Energy Physics Jim Hoff*, Grzegorz Deptuch, Tom Zimmerman, Ray Yarema - Fermilab *
1 ATLAS Pixel Sensors Sally Seidel University of New Mexico U.S. ATLAS Pixel Review LBNL, 2 November 2000.
03/12/07 Jon S Kapustinsky LANL Jon S Kapustinsky, LANL Forward Vertex Detector Collaboration Meeting UNM, March 12, 2007 Outline: FVTX Overall Description.
DESIGN CONSIDERATIONS FOR CLICPIX2 AND STATUS REPORT ON THE TSV PROJECT Pierpaolo Valerio 1.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
1 ATLAS Pixel Sensors Sally Seidel University of New Mexico U.S. ATLAS Pixel Review LBNL, 9 November 2001.
Low Resistance Strip Sensors – RD50 Common Project – RD50/ CNM (Barcelona), SCIPP (Santa Cruz), IFIC (Valencia) Contact person: Miguel Ullán.
CERN, November 2005 Claudio Piemonte RD50 workshop Claudio Piemonte a, Maurizio Boscardin a, Alberto Pozza a, Sabina Ronchin a, Nicola Zorzi a, Gian-Franco.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
The BTeV Pixel Detector David Christian Fermilab June 17, 2010.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
1 J.M. Heuser − STS Development Microstrip detector GSI-CIS Johann M. Heuser, GSI Li Long, CIS CBM Collaboration Meeting, GSI, Update on.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Fermilab Silicon Strip Readout Chip for BTEV
Maria Rita Coluccia Simon Kwan Fermi National Accelerator Laboratory
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
R. Bradford 3 February,  BNL offered to share 4” wafer. We purchased ¼ of the wafer with the remainder being used for silicon drift detectors for.
SPHENIX Silicon Tracker 2015/10/20 Japan Korea PHENIX collaboration meeting Y. Akiba (RIKEN)
11/16/ Jon S Kapustinsky Sensors/FPHX Readout Chip WBS 1.4.1/1.4.2 Jon S Kapustinsky.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
SPHENIX Silicon Tracker 2015/07/10 Radiation Lab meeting Y. Akiba (RIKEN)
FSSR2 block diagram The FSSR2 chip architecture is virtually identical to that of FPIX2. Each strip is treated as one pixel cell (Pseudo-Pixel architecture)[*]
Valerio Re Università di Bergamo and INFN, Pavia, Italy
KLOE II Inner Tracker FEE
I. Rashevskaya on behalf of the Slim5 Collaboration, Trieste Group
Evidence for Strongly Interacting Opaque Plasma
INFN Pavia and University of Bergamo
Irradiation and annealing study of 3D p-type strip detectors
SuperB SVT Silicon Sensor Requirements
Sensor Wafer: Final Layout
Status of n-XYTER read-out chain at GSI
Presentation transcript:

FVTX Sensors and FPHX Chips FVTX Collaboration Meeting at UNM, 07/15/2009 1Jon S. Kapustinsky7/15/2009

Outline Review Sensor Specifications Prototype Lot and Performance Production Order FPHX Prototype and Changes to 2 nd Round FPHX Production and Wafer Tests

FVTX Sensor Short Wedge FPHX chips (5 per column) 4 hermetic disks, z =18.5 to 38 cm Overall length mm Overall width 8.8 mm i.r., 25.4 mm o.r. Overall length 50.1 mm Overall width 8.8 mm i.r., 15.3 o.r HDI Sensor Jon S. Kapustinsky 37/15/2009

A.5 Implant strips dimensions 18 μm wide, p-implant strips, variable strip length on 7.5 degree opening angle, 2 columns of strips separated by a 75 μm gap between adjacent columns Wedge A: strip length from 3.4 mm to 6.55 mm Wedge B: strip length from 3.4 mm to mm A.6 Read-out strips Aluminum, capacitively coupled over the p-implant with the processed aluminum edge, ≥ 1 μm along the entire strip length. A.7 Bias Resistors Overlap the implants or contained within the guard ring. A.8 Sensitive region to cut-edge distance: 1.0 mm A.9 Guard ring to cut edge distance: ≥ 300 μm A.10 Guard ring design: Large contactable p-implant with overlapping aluminum. Contacts shall be in all four corners of the detector. A.11 Read out pads: 150 x 50 μm wire bond pads, two staggered rows, one primarily for probing and one for bonding. A.12 p-implant bias ring contacts at all four corners of the detector. A.13 Spy pads to probe p-implants. A.14 Back Contact: Contactable aluminum over highly doped n-implant. A.15 Passivation: Sensors shall be passivated on front (microstrip) side. A.16 Identification: Every 10 th strip to be numbered, beginning at the bottom. Scratch pads for detector identification. Alignment marks for metrology. 4Jon S. Kapustinsky7/15/2009

1.Detector Electrical Specifications C.1 Strips: p-implant. C.2 Bulk dopant: n-type. C.3 Readout strips: Aluminum ≤ 20 Ω/cm. C.4 Bias resistors: 1.5 ± 0.5 MΩ polysilicon resistors. C.5 Capactive coupling: ≥ 10 pF/cm. C.6 Uniformity of resistivity: ± 25% wafer-to-wafer. C.7 Depletion Voltage: < 100V. C.8 Operation Voltage (Vop): Depletion Voltage + 50V. C.9 Breakdown Voltage: Vop + 50V. C.10 Leakage Current: ≤ 150 nA/cm 2 at 20 degrees centigrade at Vop verified by vendor. C.11 Current slope: at 20 degrees centigrade, I(Vop)/I(Vop – 50V) < 2. C.12 Oxide breakdown voltage: > 50V (seller shall measure on a test device located on each wafer). C.13 Detector current shall increase by no more than 25% after 12 hours of operation in dry air (RH ≤ 40%) at Vop (verified by LANL). 5Jon S. Kapustinsky7/15/2009

1.Bad Strips Shall Include But Not Be Limited To; D.1 Capacitive coupling dielectric: short through dielectric at 50V. D.2 Defective strips: Metal or implant opens, or shorts to neighbors. D.3 Polysilicon resistors: Strip connection to resistor open. D.4 Acceptance testing: Each aluminum strip shall be contacted with a probe and checked for shorts through the coupling dielectric at 50V by the seller. D.5 Total strip acceptance: LANL requires a mean acceptance of 99% good strips in each delivery with no devices below 98%. 1.Seller Shall Supply Data Sheets for Each Detector As Follows; E.1 IV curves: LANL requires the plot of I versus V up to 200V. E.2 Depletion Voltage: LANL requires the value of the wafer depletion voltage. E.3 Thickness: LANL requires the value for the wafer thickness. E.4 Bad Strips: LANL requires the seller’s list of bad strips and the plot of capacitance versus strip number. 6Jon S. Kapustinsky7/15/2009

N-Surround P-Bias Ring P-Guard Ring Polysilicon Resistors Double Pad Rows p-implant on n-bulk ac-coupled 1.5 MΩ polysilicon resistors Depletion voltage < 100V Resistivity 3 to 5 kΩ-cm Initial Prototype, ON-Semi Current Prototype, Hamamatsu – shipped 31 October, 2008 FVTX Sensors 7 Jon S. Kapustinsky 7/15/2009

Serial No Depletion V Bad Strips Serial No Depletion V5560 Bad Strips HPK Prototype Lot 8Jon S. Kapustinsky7/15/2009

I/V curves from prototype lot 9Jon S. Kapustinsky7/15/2009 Beam test planned at pRad Facility at LANL with 800 MeV protons July-August

07/08/09 We understand your needs. We will make a drawing and send a proposal to you soon. We will put a strip number on Aluminum pattern on N-surround every 10ch strip. We will put a scratch pad, then show the serial number by BCD (binary-coded decimal). As for the lead time, it will be 4 months after receiving order but we will try to expedite the delivery of the sensors. Best Regards, Christine Nishiyama Hamamatsu Sales Engineer 10Jon S. Kapustinsky7/15/2009

Basis for the production quantity for the FVTX sensors Required large wedge: (48x6) = 288 sensors Assume ~15% spares: 42 sensors Required with spares: 330 sensors (Management Plan 350?) Required small wedge: (48x2) = 96 sensors Assume ~15% spares: 15 sensors (historical discussions among FVTX’ers thought this too few, so increased to 24 spares) Required with spares: 120 sensors 11Jon S. Kapustinsky7/15/2009

Slow Controller Front End Core FIFO/ Serializer Phase Block + _ Vref Shaper IntegratorInput Comp Vth0 Comp Vth1 Comp Vth7 Programmable Thresholds T-peak ~ 60 ns (programmable) Program gain and Vref FPHX readout chip FNAL ASIC Group Hoff, Yarema, Zimmerman Fully functional chip design submitted through MOSIS TSMC 0.25 micron process (delivered Aug. 08) 128 channel 50, 66, 100, 200 mV/fC 60 ns peak time (rt- pgmbl) 3—bit ADC (th-pgmbl) Optimized to 1 to 2.5 pf input 115e + 134e/pf ~ 70 to 140 uW/ch (dep. gain) Chip size 2.7 x 9.1 mm Jon S. Kapustinsky 127/15/2009

FPHX Chip back-end organization Data push architecture 10 MHz beam clock (BCO) 200 MHz data clock Zero suppressed Output 4 hits/chip in one BCO Approx. 300 uW/ch 20 bits Analog Data Processing Data Output Phase Control Serial Interface R/W 13 Jon S. Kapustinsky 7/15/2009

Jon S. Kapustinsky14 Threshold turn-on curve Shaper output from pulse inject ADC linearity Variety of test bench results from LANL, Nevis and UNM indicate repeatable performance

FPHX Changes for 2 nd MOSIS Prototype submitted June 3, 2009 Due 1 st week of August Threshold dispersion Increase channel gain settings: 46,50,60,67,85,100,150,200,mV/fC W/L input transistor selection optimized Enable R/O on either serial output line, serialout1 or serialout2 or both Add 7th time stamp bit (drop last word bit - we don't use it) Fix the logic bug that Jim found that results in a mis-id of time-stamped events under certain timing conditions New FPHX Chip Documentation sent on June 4, 2009 and it is posted on the FVTX Twiki (FPHX2_June2009Revision.doc) 15Jon S. Kapustinsky7/15/2009

Original Serial Output Word Current Serial Output Word Changes to the serial output word 16Jon S. Kapustinsky7/15/2009

MOSIS Production Order Quotation 17Jon S. Kapustinsky7/15/2009

Basis for the production quantity for the FPHX Chips Required: (26x48x6) + (10x48x2) = 8,448 chips installed Assume 10% spares: 845 chips Required with spares: ~9300 chips Chip/wafer estimate from Ray (2007): 1088 chips/wafer (approximately 85% reticle-to-wafer area) Initial minimum production: order 6 guaranteed(12 wafers started, typically 10 wafers completed), 6, ,880 chips (>85% yield on 10 wafers to meet requirement) Alternate production: order 12 guaranteed (24 wafers started, typically 20 or more completed) 13,056 – 21,760 18Jon S. Kapustinsky7/15/2009

Jon S. Kapustinsky19 FPHX FNAL wafer probe testing Meeting at FNAL 7/21/2009 “cost benefit” of probe complexity