International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011.

Slides:



Advertisements
Similar presentations
ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Technical Session Lightning Protection Highlights &
Advertisements

International Telecommunication Union ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva Risk assessment for.
International Telecommunication Union Technical Session on Home Networks Geneva, 29/04/2011 ITU-T Study Group 5 Protection against Lightning Phil Day Australia.
International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva,
International Telecommunication Union ITU-T Workshop Lightning Protection Technical Session December 2005, Geneva, Switzerland Risk assessment for.
Relevant ITU-T Recommendations for the Protection of Base Stations
Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.
Lightning Effects and Structure Analysis Tool (LESAT) Steve Peters
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
Telecommunication Networks Distributed Parameter Networks.
EE4503 Electrical Systems Design
T. YOSHIDA, J. OYAMA, T. HIGUCHI, T. ABE and T. HIRAYAMA Department of Electrical and Electronic Engineering, Nagasaki University, Japan ON THE CHARACTERISTICS.
International Telecommunication Union ITU-T Study Group 05 Damage to equipment in Japan Tetsuya Tominaga Technical Session on Home Networks Geneva, 29/04/2011.
EET 110 – Survey of Electronics Chapter 21 – Direct Current & Alternating Current Chapter 22 – Low Voltage Signal Systems.
Lightning and Power Transmission Lines EE --- Term Paper By ---
CHAPTER 9 Electrical Design of Overhead Lines
Lecture - 4 Inductance and capacitance equivalent circuits
SINGLE PHASE A.C CIRCUITS
IB Assessment Statements  Topic 12.2., Alternating Current: Describe the emf induced in a coil rotating within a uniform magnetic field Explain.
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
Copyright CCNA 1 Chapter 4, Part 1 Cable Testing By Your Name.
ECE 1100: Introduction to Electrical and Computer Engineering Notes 23 Power in AC Circuits and RMS Spring 2008 David R. Jackson Professor, ECE Dept.
5/21/2015 Using Simulation Tools to Predict and Prevent Vacuum Circuit Breaker Switching Induced Transformer Failures Steven B. Swindler,
Chapter 22 Alternating-Current Circuits and Machines.
Alternating-Current Circuits Chapter 22. Section 22.2 AC Circuit Notation.
Electric Power, AC, and DC Electricity
Overvoltage protection (surge arrester)
EPR ‘Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network’ by Ashok K. Parsotam (1997) available free.
Copyright © 2009 Pearson Education, Inc. Chapter 33 Inductance, Electromagnetic Oscillations, and AC Circuits.
MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May 2003 One phase rural distribution installation with direct connection.
Section 2 AC Circuits. Chapter 12 Alternating Current.
1 AC Electricity. Time variation of a DC voltage or current 2 I V Current Voltage time t.
All rights reserved Surge Arrester.
International Telecommunication Union ITU-T SG 5 Technical Session “Lightning protection” 12 December 2005, ITU Headquarters, Geneva Risk regarding safety.
Ac machine windings.
Lecture 16 In this lecture we will discuss comparisons between theoretical predictions of radiation and actual measurements. The experiments consider simple.
ELECTRICAL TECHNOLOGY EET 103/4
Slide 1Fig 33-CO, p Slide 2Fig 33-1, p the basic principle of the ac generator is a direct consequence of Faraday’s law of induction. When.
§9.6 High-Frequency Modulation Considerations Lecture 16 In practice, the modulation signal is often at very high frequencies and may occupy a large bandwidth,
General power system. objective Review general energy and power system Application of fundamental knowledge of principal machines, transformer and other.
The simulation experiment of induction lightning overvoltage on the distribution line Huang Ying1,2, Zeng Rong1, Yu Zhanqing1, Lu Guojun3, Liu Yu3, Wang.
Electrical Installation II1 Assessment of General Characteristics (Note: All the mentioned tables in this course refer to, unless otherwise specified,
International Telecommunication Union ITU-T Workshop on Home Networking and Home Services Tokyo, Japan, June 2004 Securing Home Networks Tsutomu.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
ENGM 631 Minimum Spanning Tree. Prototype Example Seervada Park Trams route smallest total distance Phone lines minimum spanning tree Tram limitations.
Presented by: Nguyen Phan Thanh Southern Taiwan University of Science and Technology.
Bringing together leading research institutions to advance electric ship concepts. Power Interconnect Tool Angela Card Mississippi State.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia 21 April 2016 Session2: Damage prevention and safety Resistibility of.
Electrical and RF Safety. Electrical Safety Generators Generators convert mechanical energy to electrical energy. They actually consist of two devices:
البحث السابع بحث منفرد منشور فى مؤتمر دولى متخصص (منشورة التحكيم علي البحث الكامل) Adel A. Elbaset 13th International Middle East Power System Conference,
Impact of Distributed Generation on Fault Induced Transients: A Case Study Sukumar Brahma Adly Girgis Clemson University Electric Power Research Association.
Alexandre Piantini University of São Paulo Lightning Transients in Medium- Voltage Power Distribution Lines V Russian Conference on.
KILOMETRIC FAULTS: NATURE, AFFECTING PARAMETERS, AND IMPACT ON THE BREAKER STRESSES _____________________________ Mohamed M. Saied Electrical Engineering.
Modelling LED Lamps with Thermal Phenomena Taken into Account Krzysztof Górecki and Przemysław Ptak Gdynia Maritime University Department of Marine Electronics.
High Voltage Engineering
Chapter 16 Inductive AC Circuits.
AC Electricity Our Everyday Power Source
A SEMINAR ON LIGHTNING ARRESTER
WELCOME TO ALL.
ELEC-E8409 HIGH VOLTAGE ENGINEERING
ELEC-E8409 HIGH VOLTAGE ENGINEERING
Chapter 11 Alternating Current.
AC LIGHTNING PROTECTION Northern Technologies SA
An {image} series circuit has {image} , {image} , and {image}
Exercise 8 Power systems.
Use of Lightning Data for Electricity Transmission Operations
LIGHTNING AND INSULATIONS COORDINATION
Protection against over voltages
Exercise Session 11 Power systems.
Presentation transcript:

International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011

ITU-T Study Group 05 Outline o Mechanism of internal ports lightning surge o Experiment and Simulation model o Relation between AC mains lightning surge current and induced Internal port surge voltage/current o Occurrence probability of AC mains surge current o Estimation for relation between Failure rate and test levels o Conclusion Technical Session - Home Networks - Geneva

ITU-T Study Group 05 Mechanism of internal port lightning surge for ONT/HGW Case 2: Damage occurred between two internal ports of telecom equipment Damage: Telecom. Equip 1 (FAX), Home Gate Way & Telecom. equip 2 (PC) Route: AC mains(1) – TE1 -- HGW – TE2 – SPD – Local PE Even fiber optic ONT/HGW equipment, if telecom. equipment is connected to the port which uses AC mains power, the surge voltage is generated during the internal ports.

ITU-T Study Group 05 Overvoltage measured in experimental house model Arrangement I Ent V Phase I Phase The relation ship between I Ent (current flow on entrance point) and V phase /I phase (Induced voltage and current) was examined experimentally

ITU-T Study Group 05 Spice model Technical Session - Home Networks - Geneva V Phase I Phase I Ent ItemsParameter Impedance of power line cable between DB and TE 1 R1 = 19 mΩ L1 = 19 uH (Length d1 = 19 m) Impedance of power line cable between DB and TE2 R2 = 3 mΩ L2 = 3 uH (Length d2 = 3 m) Impedance of power line cable between DB and washing machine R3 = 6 mΩ L3 = 6 uH (Length d3 = 6 m) Impedance of washing machiene grouding cable R4 = 6 mΩ L4 = 6 uH (Length d4 = 6 m) Impedance of internal telecommunication cable R5 = 1 Ω L5 = 15 uH (Length d5 = 15 m) Telecommunication equipment 470 V and 270 V. diode An appliance with earthed SPDs 1800 V. diode Loop inductance between phases 60 uH Loop inductance of drop cable 270uH Table 1 Simulated parameters To investigate the effect of wire length, amplitude of entrance point current and so on, the results were compared between the SPICE simulation and experiment

ITU-T Study Group 05 Overvoltage measured in experimental house model Visuals Technical Session - Home Networks - Geneva

ITU-T Study Group 05 Results (1) waveforms Experiment and Simulation Technical Session - Home Networks - Geneva V Phase A V Phase B I Ent V Phase I Phase I Ent

ITU-T Study Group 05 Results (2) Peak values Relation between I Ent and V phase, I phase Technical Session - Home Networks - Geneva I Ent [kA] V phase Voltage [kV] 7.5kA ⇒ 5kV I Ent [kA] I phase Current [A] Figure 1 Relation between I Ent and Vphase

ITU-T Study Group 05 Technical Session - Home Networks - Geneva Lightning current peak value [A] Cumulative occurrence frequency [times/thunder storm day] Measurement period: 3 months. Frequency of currents >1 kA = per thunderstorm day. Frequency of currents >3 kA = per thunderstorm day. J.Kato T.Tominaga et.al, “Measurement results of Lighting surge current on ac mains line connected to access network equipment” EMC’04/Sendai Figure 2 Relation between lightning current peak value and occurrence frequency Observed lightning current on AC mains port

ITU-T Study Group 05 Calculation between Failure rate and Internal ports voltage Technical Session - Home Networks - Geneva (1) Estimation for occurrence probability of I Ent Assuming the Failure rate R FA [%] and the thunderstorm days per year D TS [Day/year], The Occurrence Probability of I Ent is obtained by following equation, From the occurrence probability of I Ent, the maximum current flow on entrance point I Ent is obtained by Figure 2 (2) Estimation for Internal ports voltage of V phase From the expected current flow of I Ent, the expected internal voltage V Phase is obtained by Figure 1

ITU-T Study Group 05 Calculated results; Failure rate and Internal port voltage Technical Session - Home Networks - Geneva 15 thunderstorm days Failure Rare[%] R FA Currents flow on Entrance Point [kA] I Ent Induced voltage [kV] V phase thunderstorm days Failure Rare[%] R FA Currents flow on Entrance Point [kA] I ent Induced voltage [kV] V phase thunderstorm days Failure Rare[%] R FA Currents flow on Entrance Point [kA] I ent Induced voltage [kV] V phase On average 20 thunderstorm days per year 15 million users of optical network equipment in Japan. If the failure rate assumes 0.05 %, the 7500 failures per year will occur.

ITU-T Study Group 05 Consideration on AC mains distribution system Technical Session - Home Networks - Geneva We reported that the lightning overvoltage between the internal ports of telecommunications equipment that used an optical line occurred due to lightning surges from the electric power line in the TT system (Japanese). We also evaluated the lightning overvoltage generated at the internal telecommunication ports for various system earthings. See TD 562:Evaluation of lightning overvoltage at internal telecommunication ports for various system earthings Fig. 14/TD 562 TN-C-S system (case 4) The internal ports voltage may occur.

ITU-T Study Group 05 Overvoltage measured in experimental house model Arrangement I Ent V Phase I Phase The relation ship between I Ent (current flow on entrance point) and V phase /I phase (Induced voltage and current) was examined experimentally

ITU-T Study Group 05 Conclusion o Introduced the mechanism of lightning over- voltage applied between the internal ports for ONT/HGW. o Derived a relationship between the AC mains lightning current and internal ports voltage/current from the experiment and simulation. o Assuming the failure rate is 0.05%, and thunderstorm days is 30 day, the internal ports voltages was estimated, the calculated voltage was almost 10 kV. Technical Session - Home Networks - Geneva