RATF Report to WMS Report of RATF meeting held March 3, 2014.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

Credit Updates Vanessa Spells Credit Work Group ERCOT Public
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Demand Response in Midwest ISO Markets February 17, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
1 WMS Report TO TAC April 2007 (which is in March)
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Generation Adequacy Task Force Meeting April 10, 2014.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
RTDF Overview of Data Analysis & Status of “Consesus Items”
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Real-Time Co-optimization of Energy & Ancillary Services
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Presentation transcript:

RATF Report to WMS Report of RATF meeting held March 3, 2014

Resource Adequacy Task Force Leadership: – Sandy Morris – Chair – Suzanne Bertin – Vice Chair Product: – Decision Matrix – Strive for recommended language (NPRR) Next Meeting: – March 19 and March 20 at Met Center Due Date: – TAC meets March 27, PUC meets March 27

Resource Adequacy Task Force Limited Scope: Look at price reversal from ERS Deployments, Load RRS Deployments, and RUC (0 – LSL). Further changes of scope must be directed by TAC – Revision to RUC floors to higher than $1000/MWh – Release of the HASL – What do you do with RMR resources? – What do you do with firm load shed?

ERS Options *does not subject ERS to clawback or pay ERS the adder, not in the AS Imbalance IssueOptionProposalComplexityMarket Impact ERS*Option One Subtract out ERS from Rs when ERS is deployed in order to remove effect of deployment from reserve calculation. Medium Prevents price reduction to ORDC due to deployment of ERS. Option Two Include ERS to the Rs. When deployed, remove effect of deployment from reserve calculation. Medium Prevents price reduction to ORDC due to deployment of ERS. It will increase the ORDC reserve when ERS is not deployed. It results in divergence of PRC and ORDC. Option Three Add estimated ERS deployment to demand and then perform pricing run. High Does not prevent price reversal on ORDC. Determines energy clearing price absent ERS deployment. Option FourOption One and Option Three. HighPrevents price reversal on ORDC. Determines energy clearing price absent ERS deployment.

Load RRS Options IssueOptionProposalComplexityMarket Impact Load RRSOption One ORDC already addresses the effect of Load RRS deployments in reserve calculation. None Option Two Subtract out Load RRS when deployed for price formation. Low Prevents price reduction to ORDC due to deployment of Load RRS. It results in divergence of PRC and ORDC when Load RRS are deployed. Option ThreeAdd estimated Load RRS deployment to demand and then perform pricing run. HighDoes not prevent price reversal on ORDC. Determines energy clearing price absent Load RRS deployment.

RUC (0 – LSL) IssueOptionProposalComplexityMarket Impact RUC (0 – LSL)Option One Identify opportunities to reduce RUC deployments and Evaluate market impact of 0 – LSL on marginal clearing price. NoneTBD Option Two Remove entire HSL for RUC in ORDC calculation. Low Removes out-of-merit capacity from ORDC calculation. PRC and ORDC reserves would diverge. Option Three Treat RUC 0-LSL as dispatchable and perform pricing run. High Determines energy clearing price by treating RUC 0 - LSL as dispatchable with a price. Option Four Leave RUC but increase minimum contingency level X by the amount of MW RUCed. Medium Removes out-of-merit capacity from ORDC calculation. PRC and ORDC reserves would diverge. Option FiveOption Two and Option Three.HighRemoves out-of-merit capacity from ORDC calculation. PRC and ORDC reserves would diverge. Determines energy clearing price by treating RUC 0 - LSL as dispatchable with a price.