January 12-13 2015 LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.

Slides:



Advertisements
Similar presentations
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Advertisements

Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Project Management.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Research & Technology Implementation TxDOT RTI OFFICE.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Market Implementation Board Presentation July – v1.1F 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
Reimbursement Statements What you need to know. Let’s Take a Closer Look… …at invoicing, cost ledgers, SB and budget revisions.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
TOF Project Construction Project Plan
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov Project Management.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
PSCIOC-PSSDC Workplan Coordination Strategy– Draft Coordination Committee Telecon
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Deloitte Consulting LLP Commonwealth of Massachusetts IT Consolidation Initiative IT Governance Target State Update Briefing for Statewide Working Group.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
Measurement and Payment
PPPL is Committed to the Success of NCSX Rob Goldston, Director Princeton Plasma Physics Laboratory August 15, 2007.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Project Management W. J. Foyt
Senior Staff Meeting November 12, 2008
Terex HR Process Timetable (1st half)
All Wales Safeguarding Procedures Review Project
Preparations for a Lehman Review
Overall Project RAG Status:
Conventional Facilities
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel

January Outline Since the July 2014 review Cost by WBS Contingency by WBS Major Procurements High Priority Items How LEReC will be controlled –Monthly status –Milestones Risk Summary 2

January Since the July 2014 Review July - DOE review August – subsystem leads estimate contingency by task September –Resource loaded schedule completed –Contractor and Deputy Project Manager are assigned to charge the project (or % of time increased?) –List of High Priority Items* submitted –New AIP – RHIC Accelerator Design Infrastructure Upgrade (RADTIU) proposed November - High Priority Items & RADTIU approved December - New Project Controls personnel (Khianne Williams) begins work 3 * Equipment to be installed during the FY15 RHIC shutdown.

January Costs by WBS 4

January Contingency estimates by WBS 5

January Resources 6 Total hours = C-AD hours = % of the labor is within the C-A department.

January Major Procurements 7

January High Priority Items 8

January Assumptions for cost and schedule The following assumptions were made within the schedule. –LEReC is fully approved by Feb –RHIC does not run at all in FY17, in the other FYs RHIC shuts down 7/31 each year and restarts 12/1 each year. The cost and the funding plan shown in the Execution plan is based on the above. Changes to the assumptions or funding plan may change the cost, schedule and milestones. 9

January Project Schedule 10 There are currently over 1400 lines in the schedule, and 9 months of float from the planned early finish date to the Project Complete reporting milestone in 3QFY18.

January Critical path 11 The compensating solenoids are the current critical path. Funds were committed on Dec 23 rd when Purchasing received our requisition, specs and statement of work. It went out for bid on Dec 29 th.

January Critical Tasks 12

January Project Status 13 status requests in excel put the schedule in everyone’s hands each month. Highlighted cells point out the info needed now.

January Communication and Reporting Plan Alexei Fedotov, CPM, leads weekly meetings with the LEReC team to discuss progress, risks and concerns. Cost/schedule/status will be reviewed monthly and reported to ONP via and discussed in detail during monthly telecons. The standard BNL accounting system will be the basis for collecting cost data. The CPM will lead quarterly overall cost, schedule and technical performance reviews and report the results to the ONP. ONP may, at their discretion, conduct progress reviews with a committee of experts. Technical performance will be monitored throughout the project to insure conformance to approved functional requirements. Design reviews and performance testing of the completed systems will be used to ensure that the equipment meets the functional requirements. Schedule performance will be monitored via milestones. 14

January Milestones for reporting progress 15

January Milestones for us 16 There are 9 months of float from the early finish date to the Project Complete date.

January Risk 17

January Summary KPPs/UPPs are defined and understood. Risks have been identified and are being addressed. The major risk to the project is the performance of the SRF gun, and as mitigation, a parallel effort (off project) with Cornell for a DC gun is in progress. Contingency is at 26.1%. The schedule will continuously evolve and be statused. A dedicated team of people has been assigned to the project. 18