At the Davis-Besse Nuclear Power Station Lillie Winckowski and Mark Clark.

Slides:



Advertisements
Similar presentations
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Advertisements

Application samples All rights reserved, property and © CAD Computer GmbH & Co. KG 2009.
1 SOLVAY The Sarralbe Experience Sarralbe is the name of a town in France, close to the border between France and Germany. In this town Solvay has a Production.
Value Now: Off-the-Shelf Operational Visibility in ProcessBook and RtPortal Data South Systems and Dominion Power.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
An Overview of the Energy Education Program Monroe County CSC November 3, 2009.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Improving Boiler Water Chemistry Regional Seminar Series Cincinnati.
Monitoring a Pipeline and Sharing Data with Key Customers How to do this when you own the pipeline but do not operate it!! Bert Stipelcovich IT Manager.
Ed Gray, PE Public Service Electric and Gas
6/3/20151 MARS... and the YEAR 2000 Management Administrative and Reporting System Commonwealth of Kentucky.
PI: Platform for ERP & SCM Ron Kolz ERP Industry Manager.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Fleet Optimization Through Process Information Regional Seminar Series.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
NERC Lessons Learned Summary
FIRE MODELING OF THE SANDIA TESTS (NUREG/CG-4681) An Educational Program to Improve the Level of Teaching Risk-Informed, Performance-based Fire Protection.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007 Overview of FirstEnergy Pumped Hydro Seneca & Yards.
Copyright © Yokogawa Electric Corporation 13 th February Exaquantum R2.70 Enhancements.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
March “Experience Gained from the Mexican Nuclear Regulatory Authority in the Probabilistic Safety Assessment Level 2 Development for Laguna.
What is SMART NETWORK? SMART NETWORK is a centralized system providing intelligent communications, real-time data analysis and optimized management for.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
WEB Apps Product Info. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
The PI-ProcessBook Family Customizable views of your data - Anywhere you want them.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Produced by: Integrated Asset Planning for Nuclear Power Plants Matt Kohal Southern California Edison.
PI – An Enterprise Integration Tool Mark Brown – Calpine Corporation Mark Bowles – Calpine Corporation Sam Jenkins – Calpine Corporation.
Migrating Operations Applications to PI, by Rayan Hafiz – 2005 OSIsoft User Conferences, Frankfurt.
OSI Development Plans Mark Hughes. ProcessBookDataLink PI-APIPI-SDK Automation OLE Objects ActiveX Controls COM Add-ins ODBC Datasets PINetMgr ArchiveBase.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
PI-ProcessBook Developer
PI Trickles Down At the Water District Emile Richard Portland Water District Portland, Maine.
1 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 3 The Incorporation of the Utilities Input into the Design.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for.
Yokogawa Electric Corporation ISD-MASP-S05010 Copyright © Yokogawa Electric Corporation February 16, 2005 Solution Marketing Group Industrial Automation.
1998 PI System Users’ Conference PI-ProcessBook Brian Bostwick Omicron Consulting Mark Hughes OSI Software, Inc.
Technology is Integral to Corporate Culture May 8 th, 2008 H. Kevin Stogran Director - Market Operations Support OSISoft Regional Conference, Kansas City.
Lake Erie is in the northern hemisphere, between Canada and the United states. It is one of the 5 great lakes. Lake Erie is 57 miles across and 247.
IntroductionHeat RateFuel TrackingFrequency Analysis PI Applications at First Energy with PlantView 2000 TM Ron Carson, First Energy Corp. Jim Scavuzzo,
Yokogawa Global MES Solution Centre (GMSC)
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Global PI System Dow Corning Corporation Doug Loose Global Process Information Manager Dow Corning Profile SPC
OCS Remote Viewer Release 0.12 March 21, 2007 Confidential.
Fulfilling Nuclear Emergency Preparedness Data needs with PI. By Paul Sunderland & Kevin Rumbaugh.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Chernobyl Nuclear Power Plant Accident April
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
Maximizing Electrical Output at ComEd Nuclear Stations by David J. Miller Kevin Rumbaugh James Rafferty and Gary Loeb.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
1Directional Sound Performance Directional Sound Performance Testing Scott Lang Mike Dybas.
The Changing Power Grid – NPP Flexible Plant Operations Sherry Bernhoft EPRI, Program Manager July 29, 2014.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
National Grid Outage Management System Overview June 9, 2009.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Optimizing Efficiency + Funding
TRTR Briefing September 2013
Final Design Authorization
Tom Clark Vice President, Customer Service & Service Area Development
Presentation transcript:

at the Davis-Besse Nuclear Power Station Lillie Winckowski and Mark Clark

Overview FirstEnergy Corporation. Davis-Besse Nuclear Power Station. What is SPDS? Why, When and How SPDS was implemented at Davis-Besse. Configuration of SPDS.

SPDS on the Plant Simulator. Real-Time Demonstration. Future Enhancements. Questions…. Overview

Nation’s fourth largest investor-owned electric utility. Services 4.3 million customers within 36,100 square miles of Ohio, Pennsylvania, and New Jersey. Davis -Besse Perry Beaver Valley

Located in Oak Harbor, Ohio on the southwest shore of Lake Erie. 940 MW Pressurized Water Reactor Began Operation Located in Oak Harbor, Ohio on the southwest shore of Lake Erie. 940 MW Pressurized Water Reactor Began Operation Davis-Besse Nuclear Power Station

Safety Parameter Display System (SPDS) Provides a display of plant parameters from which the safety status of operation may be assessed by the Control Room, Technical Support Center, and Emergency Control Center. Required for all nuclear plants after Three Mile Island incident in 1979 per NUREG 0696, NUREG 0737 and NUREG 0800.

For the original SPDS, the NRC required each plant to perform a V & V in accordance with NSAC-39 issued by the Electric Power Research Institute (EPRI). The following phases occurred to meet this requirement when implementing with PI. –System Requirements Review –System Design Review –System Validation Testing –System Installation Verification Validation and Verification

SPDS at Davis-Besse Previous SPDS - VMS based, with IDT Graphics Terminals. PI was chosen for its’ archival system and the ability to customize displays. The new SPDS have similar displays, and meet all commitments established with the previous SPDS. SPDS based on PI was implemented in March 2000.

SPDSSPDS

Windows NT Clients using PI- Processbook, PI-API, and Active X Controls. SPDS launches automatically upon login. Displays are locked into Full Screen Mode for the Control Room. SPDS PCs are located in the Control Room, Emergency Response Facilities, and Work Support Center. SPDS at Davis-Besse

One.piw book SPDS tab - contains 16 displays to meet NRC requirements. Six interactive alarm boxes on each SPDS display with 28 individual alarms. Additional 7 tabs containing 73 displays for increased information. 50,000+ lines of VBA code 149 Performance Equation tags SPDS at Davis-Besse

Implemented on the Plant Simulator. Identical in the PI configuration to the real-time PI-Server and SPDS book. Used for testing of SPDS during initial implementation and for additional enhancements and modifications. Used for Emergency Response Drills. SPDS / PI on the Simulator

Real-Time Demonstration

Operational Schematic drawings with real-time values. Electrical Distribution drawings with real-time values. SPDS book available to everyone on-site using PI-ActiveView or PI-Processbook. Future Enhancements

SPDS using PI was implemented using the same guidelines as the original SPDS. Used in the Plant and the Simulator. Uses PI-Processbook, PI-API and Active X Controls. Consists of one piw book with over 90 custom displays. In Summary

Questions...