Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.

Slides:



Advertisements
Similar presentations
T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
Advertisements

T-979: SiPM Time Resolution with DRS4 Readout Anatoly Ronzhin, Fermilab, AEM March 12, 2012 Team: Mike Albrow, Sergey Los, Pasha Murat, Erik Ramberg, Fermilab.
AFP QUARTIC Fast Timing System James L Pinfold University of Alberta.
QUARTZTOFMike Albrow CMS-FP420 April 28 th 2008 QUARTZTOF An isochronous & achromatic Cerenkov Counter Making Cerenkov light parallel  point focusing.
Fast shower maximum detector based on MCP-PMT Anatoly Ronzhin, Fermilab, AEM, March 10, 2014 Team: Sergey Los, Erik Ramberg, Fermilab Artur Apresyan, Si.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
1 QUARTIC, A TOF for ATLAS/CMS Forward Protons You didn’t know that ATLAS+CMS had forward protons? FP420 = Forward Protons 420m downstream of CMS & ATLAS.
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
Fermilab / U. Chicago / Argonne Collaborative Initiative on Ultra Fast Timing Detectors With: (ANL) Karen Byrum, Gary Drake, Bob Wagner (UC) Henry Frisch,
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
Groups Involved University of Alberta, University of Texas at Arlington, University College London. Prague, Saclay, Stoneybrook, Giessen, Manchester,
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2b.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
T979: Si-Pms in MTest Anatoly Ronzhin, Fermilab, AEM 12 April, 2010
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 QUARTIC Update Andrew Brandt (UT-Arlington), Mike Albrow (FNAL), Jim Pinfold (Alberta) Preliminary UTA drawing of Mike Albrow’s concept for a fast time.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
The primary goal has been to have the AFP timing system fully defined for the AFP Technical Proposal by December The end result should be a system.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
Mike AlbrowSept 14 th 2006Time-of-Flight with GASTOFs im Test Beam 1 Fast Timing Counters for FP420/CMS and Test Beam Particle ID Mike Albrow, September.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
July 4, 2008 SuperBelle Meeting, KEKPeter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute Burle MCP PMTs as photon detector.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
QUARTIC STATUS Nov 19 th 2014 Mike Albrow, Fermilab Baseline Plan Detector : Optics, SiPMs, (Readout board, connectors – S. Los) Time schedule Testing.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Anatoly Ronzhin, 23 June, 2009 Anatoly Ronzhin, June 23, 2009 The main results of the TOF study at MT beams, May-June 2009 The team: Anatoly Ronzhin, Hans.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Mike AlbrowAll Experimenters, June 8 th 2009T979: Tests of Precision Timing MTest 1 Tests of Fast Timing Detectors in the Meson Test Beam (T979)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
FP420/AFP Fast Timing Stage I: LHC luminosity 2 x10 33  t < 20 ps (
Quartic tests at Fermilab test beam June rd 2015 One “prototype” module made. #1 ? To CERN mid July for August test beam.
Pileup Background Rejection Ex, Two protons from one interaction and two b-jets from another Fast Timing Detectors for FP420 z=c(TR-TL)/2  z (mm) =0.21.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
PROJECT X PHYSICS STUDY WORKSHOP (PXPS 2012) Working Group on Time of Flight Conveners: Mike Albrow (FNAL) & Bob Wagner (ANL) New directions in fast timing:
Mike Albrow, FermilabHPS Comments, Manchester 20l0 Some random HPS comments Mike Albrow HPS is accepted in CMS as an R&D project : Physics case is accepted.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Reed Research Reactor reactor.reed.edu/pictures.html reactor.reed.edu/pictures.html 1 Moriah Tobin Modeling Quartz Cherenkov Detectors.
Mike AlbrowHPS – Nov 25thQUARTICs : Tests and Plans 1 May-June Fermilab beam tests The next QUARTICs Test plans … unfortunately delayed SiPMs …. Wavelet.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
TRIGGER & T0 for RUN 2016 V. Yurevich meeting CAEN digitizer T0.
"North American" Electronics
Overview of SuperB Particle identification, and work towards the TDR
Test Beam Studies for FP420 Fast Timing
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
Report from Fermilab: Beam Tests and QUARTZTOFs
High rate capability of gas ionization chamber with flash ADC
Preparation for CERN test beam
The Beam Test at Fermilab:
M. Jones B. Wojtsekhowski
BESIII EMC electronics
Latest Results from T979: PSec Time-of-flight
Testbeam status report
Variable distance from beam.
Presentation transcript:

Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th – Tue June 2 nd, 12 hours/day, probably 10pm – 10am, Priority is to test Cerenkov detectors, using custom fast electronics. Keep it simple! Want to test several devices, in order of priority or task: 2 Photek tubes in line in beam with 0,2,4,6 mm extra quartz radiator Q-bar with 2 Photek tubes, one each end. Perpendicular to beam (and x, θ scans) Q-blocks with SiPMs in line (Anatoly) GASTOFs 2 in-line, sent by Louvain. (Same DAQ, just exchange cables) 2 Photonis 48 x 48mm tubes with ganged together channels, in line (+ extra Q if wanted) Iff the latter shows good resolution, would like to install them in QUARTZTOF(cones). =============================== The above is our plan. Additional tests with QUARTIC (8-bar design) and different electronics (A.Brandt) only if they are fully independent, on back table, and understand we are prime user. I will discuss this next week at UTA (Mike)

Fast Timing Mtg April 15 th 2009 Mike Albrow MTest May 27-June 2 All 120 GeV/c protons, intensity ~ 10K-20K per 4 sec spill, 1/minute. Small trigger scint counter ~ 2mm x 2mm 2PMTs in Dark Box. [AR] Scan to find beam center. 2 nd large trigger counter ~ 4cm x 4cm in line, in COINC for trigger Halo-veto counter with round hole diam ~ 5mm to reject showers. [AR] “Standard” reference fast detector, in beam & always read out PHOTEK 240 (40mm diam) These on front table, see plan later. Scanning table: x,y,θ … mount in moveable base, program it Trigger logic & DAQ shown on next slide [ER] Very fast digital scope Set-up & waveform recording (if wanted)

Fast Timing Mtg April 15 th 2009 Mike Albrow 3 Electronic Measurement MCP/PMT’s Anode signals Scintillator Trigger Constant Fraction Discriminators (CFD) - ortec 9327 Time to Analog Convertors (TAC) - Ortec 567 START STOP 14 bit CAMAC ADC’s - Ortec AD114 NIM signals 10 bit CAMAC ADC’s – LeCroy 2249 Analog Output Add to this: 2 nd small 2x2 trigger in AND Veto counter with hole in VETO

Fast Timing Mtg April 15 th 2009 Mike Albrow Notes on detectors: 1 large (40mm diam, 2 MCPs) PHOTEK in beam center, maybe add Q. Keep fixed as Ref. 2 Photek tubes in line without & with Q-disks on window (grease? removal?) Dark Box [ER] Q-bar: Fused silica bar 6mm x 6mm x 90mm, Photek 3μm pore 10mm Φ each end. (Beam ┴ to bar, scan along, rotate…) [being made, Lindenmeyer] Light tight, but in dark box for RF and convenience of cables etc. [MA] Q-blocks + SiPMs in line [AR] GASTOF: 2 devices with (1-channel) Photek PMTs [exist, from Louvain] Mounted in line on plate, too big for dark box, mount on 2 nd table (assuming no QUARTICs there) maybe Pair of Photonis 64-pad 48x48mm2 tubes in line (+Q plate?) to test integrated readout. < QUARTZTOF (Cones) IFF Integrated Photonis test looks good, be prepared to put on Cone radiators (2 nd separate dark box). > maybe.

Fast Timing Mtg April 15 th 2009 Mike Albrow Heavy duty tables DARK BOX Q-bar 40x40mm trig scint 2x2 mm trig scint 40x40mm veto scint GASTOFs (1/2 shift) BEAM Very schematic placement of detectors

Fast Timing Mtg April 15 th 2009 Mike Albrow Jobs: Pre-beam: laser tests Anatoly+Mike Friday for PHOTEKs, check all PMTs, Prepare electronics/DAQ/computer Trigger and veto counters, trigger logic, cables. Prepare detectors: See previous slide. Run control software, on-line histograms etc. Prepare stands and motion control, programmed. Make time plan/schedule/shifts & people People (? partial list?) Mike Albrow, Erik Ramberg, Anatoly Ronzhin, Sasha Pronko, Hans Wenzel, + others may be, let us know.