Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.

Slides:



Advertisements
Similar presentations
M.O.P Systems Stanley Dyrkacz President...Meeting tomorrows needs, Today! Machine Mentoring 1748 Beacon Hill Drive, Salinas, CA
Advertisements

9. Coordinated Product and SC Design Case: HP Desk-jet Printer Supply Chain (Read pages ) HP-founded in 1939 Electronic test and measurement equipment.
A PROCESS DEVELOPMENT TOOL FOR THERMAL SPRAYING Developed by Mattias Ottosson Stefan Björklund © 2011.
Building an Electron Accelerator for Use in a Free-Electron Laser by Daniel P. Mills.
PRIME Antenna Inc. Antenna Test Team Adam Straubinger Alan Condino Thanh Hong Ronnie Berg Sam Gregorio.
SyncGen Multiple Unit Selectivity for Stator Ground Faults Using a Sensitive Directional Element Snapshot Presentation.
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
04013 Micro Turbine Senior Design Micro Turbine Senior Design CDR – May 14 th, 2004 Project
This workshop is licensed under a Creative Commons License.Creative Commons License. Session 4 INTEGRATING AN EDUBLOG INTO YOUR CLASSROOM You should hear.
Ideas to Plastic correctly Product to Market quickly Ideas to Plastic correctly Product to Market quickly.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
SJDLO/IF/FO - May 19-20, Production & Maintenance Steven J. Durand Thursday - May 20, 2004.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Project Progress Document Optimization 5 April 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
© 2010 Innovation and Business Industry Skills Council Ltd. BSBMKG506B Plan market research Session 4 Develop market research plan.
Project Workshops Schedule. 2 Important Points to Note Project Workshops will be Monday at 09:00 in ER 153 These workshops are compulsory for all project.
CHEDS Experiment Title…… o Experimental Staff and contact information: Example:  Principal Investigator (PI)  Co-PI  Staff Scientist  Post Doc  Graduate.
Chapter 3 Strategic Information Systems Planning.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
1 1. Before synchronisation Tier 2OEMCustomerTier 1 2. After synchronisation OEM Tier 1 Tier 2 Tier 1 Customer Key :OEM – Original Equipment Manufacturer.
1 Texas Nodal Presentation Board of Director’s Meeting September 20, 2005.
Planning Concepts Basics of Project Planning. Construction Planning Setting Milestones for overall completion Organizing activities for Individual area.
Year 10 Textiles GCSE : Tie-Dye Objectives In today’s lesson we will:- Learn how to create the technique TIE-DYE Explore a variety of effects produced.
Delivering the Value of Color Malcolm Hancock Principal Analyst Digital Documents and Imaging Group.
How to Prepare for an Ohio TAV/TRV September 21, 2006 D.D. Davis, Mill Creek, Youngstown.
Pilot Training WG Kick-off Meeting March, 31, 2010.
Interactivity in Blackboard Making your class something other than an electronic book.
UCB Accounting System Review Prepared by: T. Dobson 6/28/01.
Skate lab. Lab Report Lab report: Purpose, data table, calculations, conclusion. diagram of the system, - The diagram of the system should be complete.
VirtuLab: Web Based Flow Visualization Facility Midpoint Review Team 6 Members: Justin Scott Karen Davis Sydni Credle Mentor/Client: Professor: Dr. Shih.
North American Hydraulics Baton Rouge, LA Steve Gluck Cell:
Figure 1. - The different parts of landing gear structure.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Wind Turbine Energy Conversion System Design and Integration
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication/ Test –Gate Generator (Jimmy) à Synchronized.
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
Путешествуй со мной и узнаешь, где я сегодня побывал.
Page 1 Dieter Mueller-Ehrhard Workshop „Information and Media Technologies“ Recommendations for further work Your hosts: Uwe Graune Dieter Mueller-Ehrhard.
CRITERIA FOR SELECTING SHOP TOOLS To select tools (hand tools or powered tools) the following points must be considered: Job or the task to be performed.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Steel Fabricators and Engineers in UAE
BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link
It’s…….
Let the IMPS program help you with your obsolescence!
LARP Phase II Secondary Collimator RC1
Instrumented Walker Status Update 2
VirtuLab: Web Based Flow Visualization Facility
Simple Machines: Jackhammer
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
Shop Tools & Equipment Shop Exterior Grilles Shop Performance Parts.
{TF/SIG/SC Name Here} Highlights from this Meeting:
First Report Due on completion of first solar cell fabrication
Generalized tiebreaker wiring diagram
….because you only want to have senioritis once
Developing a Budget Basics for drafting and maintaining a budget for simple tracking and reporting.
TURTLE DIAGRAM GAGE CALIBRATION
General Safety Rules Power Tools.
Planning ahead for grant seeking
Production management
Urgent Modification Process Flow Diagram
HW #1 Think about your current job or a past job and answer
Overview Your Logo.
General Safety Rules Power Tools.
Tutoring Program.
Presentation transcript:

Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and other researchers Before coming to Davis –Scheduling –Autocad / drafting –Mathcad (recommended) –Machine shop / hand tools –wiki At Davis –Labview (required) –Forklift driving –Electronics –instrumentation CGM Wiki at nees.ucdavis.edu

Scheduling / planning 3 months before test schedule is set – complete diagram of experiment and instrumentation 1 month before test – all fabricated structures

Page 2 of 3 Drafted on 8/11

Displacement Transducer Rack Mounted on Container Above Model