Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
ERCOT Tool to manage unexpected incremental load November 16, 2006.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Sai Moorty ERCOT Integration Options into ERCOT systems.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Future Ancillary Services (NPRR 667) Update March 26, 2015 TAC meeting 1.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
STANDARD & GENERIC COSTS FOR WOOD FIRED BIOMASS PLANTS H.BASARAN/B.CHAKKA AUSTIN ENERGY RCWG MEETING SEPTEMBER 21,
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Resource Cost Working Group October 7, 2015 WMS Update.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
1 WMS Report TO TAC April 2007 (which is in March)
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Asia-Pacific Energy Regulatory Forum
Current FRRS Language & Explanation of Posted Data
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT

2 Presentation Outline October 15, 2015ERCOT Photovoltaic and Storage Workshop 1.Solar PV Resources a)Registration b)Testing c)COP values and telemetered values a)Limiting the Output from a Solar PV Resource b)Compliance (treated as an IRR) 2.Energy Storage Resources a)Registration (Currently Modeling as GR and CLR) b)NPRR 340 c)NPRR 461 d)Various Caps and Floors for Energy Storage Resources e)Mitigated Offer Cap (MOC) for Energy Resources f)ERCOT RTC/RTD Proposal g)FRRS Pilot (technology neutral) 3.Miscellaneous a)Limitations on when Storage Resources can withdraw from the Grid b)Capacity Demand Reserve Values

3 Solar PV Resources October 15, 2015ERCOT Photovoltaic and Storage Workshop a)Registration b)Testing c)COP values and telemetered values i.Limiting the Output from a Solar PV Resource ii.Compliance (treated as an IRR)

4 Storage Resources: Current Approach October 15, 2015ERCOT Photovoltaic and Storage Workshop

5 NPRR 340 Introduction and Definition of Duration- Limited Resources October 15, 2015ERCOT Photovoltaic and Storage Workshop Posted 3/21/11, currently tabled Testing Requirements Qualifications for AS. (One hour requirement) ERCOT is drafting a new NPRR to provide a testing approach for Resources with unique operational restrictions (HSL and MPC) 350/340/keydocs/340NPRR- 23%20TAC%20Report% dochttp:// 350/340/keydocs/340NPRR- 23%20TAC%20Report% doc

6 NPRR 461: Energy Storage Settlements Consistent With PUCT Project October 15, 2015ERCOT Photovoltaic and Storage Workshop Posted 5/02/12, under discussion at RCWG Energy Storage Resource Wholesale Load Energy Storage Load Locational Price for when the ESR is net load for the 15 minute Settlement Interval /461/keydocs/461NPRR-09_ERCOT_Comments_ dochttp:// 475/461/keydocs/461NPRR-09_ERCOT_Comments_ doc

7 Various Caps and Floors for Energy Storage Resources October 15, 2015ERCOT Photovoltaic and Storage Workshop Draft (un-numbered) NPRR posted on 2/15/12 WMS meeting page, still under discussion Draft changes to Verifiable Cost Manual posted on 1/27/12 ETWG meeting page, still under discussion Startup Offer and Minimum Energy Offer Generic Caps Energy Offer Curve Caps for Make-Whole Calculation Purposes Mitigated Offer Cap Mitigated Offer Floor Verifiable Costs Minimum and Maximum Resource Prices draft_nprr_caps_and_floors_for_energy_storage_resources.dochttp:// draft_nprr_caps_and_floors_for_energy_storage_resources.doc

8 RTC/RTD Proposal and Energy Storage Resources October 15, The main components of RTC/RTD proposal are: Real-Time Commitment (RTC) Application Real-Time Dispatch (RTD) Application 2.The outputs of RTC are: Commitment Instructions for Generation, Load and Energy Storage Resources. 3.The outputs of RTD are: Dispatch Instructions (Energy MW Base points) for Generation, Load and Energy Storage Resources. LMP at all Settlement Points and Electrical Buses. Link to RTC/RTD Strawman: _enhancement_strawman_8_24_2012.doc ERCOT Photovoltaic and Storage Workshop

9 Fast Responding Regulation Service Pilot October 15, 2015 Scheduled for Board vote in November Pilots a new Ancillary Service that could be provided by Resources with limited duration. See September TAC presentation: t_Responding_Regulation_Service_Pilot_Presentation_TA.ppt “Frequency Regulation Compensation in the Organized Wholesale Power Markets: meet/2011/102011/E-28.pdfhttp:// meet/2011/102011/E-28.pdf ERCOT Photovoltaic and Storage Workshop

10 Last Slide (Miscellaneous Issues) October 15, 2015ERCOT Photovoltaic and Storage Workshop Should there be any restrictions on when Energy Storage Resources can withdraw from the grid? What is the appropriate “Effective Load-Carrying Capability” for Solar PV and for Energy Storage Resources used in the CDR development?